Singapore will expand the Singapore Rail Academy’s role from November with standardised training, wider eligibility, and new certification pathways for engineers, technicians and operations staff. The changes, developed with LTA and rail operators, are meant to support MRT network expansion, upgrades and future technology adoption.
Everything we read, routed to your cluster
Singapore will revamp its Rail Academy from November, partnering five educational institutions and consolidating training from LTA, SMRT and SBS Transit into a common curriculum. The scheme will create clearer pathways for rail workers to earn formal diplomas, degrees and new sector certifications, with WSQ certification starting in early 2027.
Singapore and Malaysia conducted a joint exercise simulating a fire on a stranded Johor Bahru-Singapore RTS Link train. The drill tested firefighting, triage, casualty evacuation, and cross-border command and communication ahead of passenger operations targeted for February 2027.
EdgeProp profiles Summer Suites, a freehold serviced residence in Johor Bahru by Connoisseur Properties, about 850m from JB CIQ and the future Bukit Chagar RTS Station. The 44-storey project has 748 units, smart-home features, more than 20 facilities, and a target completion in 2029.
Summer Suites is a freehold serviced apartment project in Johor Bahru by Connoisseur Properties, about 850m from JB CIQ and the future Bukit Chagar RTS Station. The 44-storey tower has 748 units, smart-home features and more than 20 facilities, with completion targeted for 2029.
Malaysia and Singapore held a joint emergency response exercise for the Johor Bahru-Singapore RTS Link on 27–28 October 2026 at RTS Wadi Hana Depot. The drill tested firefighting, medical triage, casualty evacuation, and cross-border coordination by agencies from both countries ahead of passenger service start.
Siemens Mobility launched Tech Experience Launchpad, a UK work-experience programme for 11–16-year-olds that will offer more than 3,300 opportunities a year and 10,000 over three years. The initiative coincided with the opening of Siemens’s £100 million Rail Technology Centre in Chippenham and supports UK rail skills development.
At InnoTrans 2026 in Berlin, SOGECLAIR TRAINING & SIMULATION presented Oksygen® and LITE, simulation tools for driver and operator training. The platforms use real infrastructure data, digital twins, 2D/3D modelling and portable hardware to support training, assessment and operational readiness.
UIC’s 2026 Asia-Pacific Web Meeting Series will run sessions on topics including advocacy, sustainability, resilience, security, passenger, infrastructure, rolling stock and energy, freight, and UIC publication tools. The programme aims to connect Asia-Pacific members more directly with UIC technical departments and working groups.
Pune Metro Line 3, a 23.2-km PPP corridor linking Hinjawadi and Shivajinagar, opened on 3 November as the first metro project under India’s 2017 New Metro Rail Policy. Siemens supplied systems integration, CBTC, electrification and depot equipment; Alstom supplied 22 three-car trainsets.
Parsons, with Systra and Egis in the RMTC joint venture, has been awarded project and construction management services for the Riyadh Metro Red Line Extension in Saudi Arabia. The 8.4-km extension will add five stations and connect King Saud University to Diriyah South.
TRC Synergy said its subsidiary is part of a consortium awarded a RM2.69 billion contract for Penang LRT Mutiara Line Civil Main Contract 2. The 5.5km package includes a 3.05km sea bridge linking Macallum on Penang Island to Penang Sentral in Seberang Perai.
At IRSC Lisbon 2026, UIC presented work on safety culture, cyber resilience, risk assessment harmonisation, wayside monitoring, AI for level crossings, and safety management for Portugal’s future Lisbon-Porto high-speed line. The conference highlighted international cooperation on railway safety and innovation.
The Mutiara Line LRT link from Macallum to Penang Sentral, including a 5.5 km marine bridge across the Penang Strait, is expected to start construction in Q3 2027 after MRT Corp completes tender evaluation this month. Completion is targeted for December 2031.
Kelantan says the ECRL station at Cherang Tuli, Pasir Puteh, will be supported by industrial, logistics and warehousing development, including a proposed dry port in Bandar Baru Tok Bali, to create jobs and local business opportunities.
MCMC is testing internet coverage along the 378km Phase 1 East Coast Rail Link route from Gombak to Kota Baru, including 16 stations and tunnels, ahead of the Dec 12 launch. Maxis, appointed by MRL as the 4G infrastructure provider, has presented its implementation plan.
MRT Corp has awarded a RM2.69 billion contract for CMC2, covering design and construction of a 5.5km Penang Mutiara Line extension from Macallum Street to Penang Sentral, including a 3.05km sea-crossing bridge. The 22-station project is 16% complete and is expected to open in 2031.
MRT Corp awarded the RM2.69 billion Civil Main Contract 2 for the Penang LRT Mutiara Line. The package covers a 5.5km extension from Macallum to Penang Sentral, including a 3.05km sea-crossing bridge. The project is under construction and reported 16% complete.
TRC Synergy said its subsidiary has a 30% interest in a joint venture awarded the RM2.69 billion Penang LRT CMC2 package. The five-year contract covers design and construction of a 5.5km sea-crossing viaduct, a navigation span, an elevated station and related works for the Mutiara Line.
An opinion piece says the ECRL is nearing a defining moment in Malaysia, with passenger service due to start on 12 December 2026. It highlights expected travel-time savings, dynamic fare pricing, concessions and the importance of first- and last-mile connectivity around stations.
Kelantan plans industrial and logistics development around the ECRL station in Cherang Tuli, Pasir Puteh, including processing industries, warehousing, a logistics hub and a proposed dry port in Bandar Baru Tok Bali. The state also wants supporting roads, distribution centres and last-mile logistics facilities.
British Transport Police released an image and appealed for information after a fight involving three people and weapons at Worthing station in West Sussex on 11 October 2026. Two men, aged 18 and 22, have been arrested and charged.
Penang’s Mutiara Line LRT Macallum–Penang Sentral alignment, including a 5.5km marine bridge across the Penang Strait, is scheduled to start construction in 3Q2027 after MRT Corp completes tender evaluation this month. The alignment is targeted for completion by December 2031.
UIC Africa Region training session on security of major events, with case studies from SNCF, FS, RPF, SENTER and ONCF on managing crowds for Olympics, religious processions, the Africa Nations Cup and World Cup 2030.
TRC Synergy’s JV CCCC-TRC-UFUK accepted a RM2.69 billion contract from MRT Mutiara Sdn Bhd for Penang LRT Mutiara Line Package CMC2. The five-year scope covers a sea crossing viaduct with navigation spans, an elevated station, and associated works from Macallum to Penang Sentral.