Siemens Mobility launched Tech Experience Launchpad, a UK work-experience programme for 11–16-year-olds that will offer more than 3,300 opportunities a year and 10,000 over three years. The initiative coincided with the opening of Siemens’s £100 million Rail Technology Centre in Chippenham and supports UK rail skills development.
Everything we read, routed to your cluster
UIC said it will participate in COP31 to promote rail’s role in climate action, focusing on carbon-credit methodologies and including rail in national adaptation planning. It also highlighted the MoveCredits Coalition and joint work with UITP and Alstom on rail and public transport climate finance and resilience.
Hitachi Rail Spain and Hitachi Rail Turkey signed a contract to supply, install and commission signalling systems on Turkey’s Ankara-Istanbul line at T26 and Bilecik depot. The scope includes interlockings, the Traffic Control Centre, telecommunications expansion, and ETCS Level 1 and 2.
The California High-Speed Rail Authority approved Siemens’ contract to supply three AP220 high-speed trainsets, spare parts and 10 years of maintenance. The deal is worth USD 772.1 million, with options for up to 19 more trainsets. Initial manufacture and testing will be in Germany, with California testing planned from 2030.
SRI Rail Invest ordered a Vectron Dual Mode locomotive for delivery in late 2027 or early 2028. In a separate deal, it arranged financing for Projektbahn to acquire former ICE 2 vehicles from DB Fernverkehr.
GMRC has invited bids for the ₹197.14 crore development and construction of the Gyaspur Depot for the Ahmedabad Metro Rail Project in Gujarat. The package covers depot infrastructure, an Operations Control Centre, and associated electrical and mechanical works. Bid submission closes on 20 November 2026.
UIC lists the Regional Assembly Europe Assistants (RAEA) meeting on 24 Nov 2026 from 13:00 to 15:00.
Alstom said first-half revenue rose 3% to €9.3 billion and orders rose to €11.0 billion, but it cut its 2026/27 outlook. The company cited technical issues and testing requirements on the Coradia Max platform and revised margins on selected rolling stock projects.
UIC Statistics Platform plenary meeting held on 19 Nov 2026 from 09:30 to 16:00.
Siemens Mobility will supply three Pioneer 220 high-speed trains for California under a USD 772.1 million contract, with options included.
UIC describes rail-related climate work under COP action plans on freight modal shift, urban transport, and infrastructure resilience. It cites a new study on National Adaptation Plans showing rail is often mentioned but rarely backed by costs or funding, and says COP31 discussions will address green freight corridors and carbon markets.
Malaysia has approved funding for preliminary work to extend the under-construction East Coast Rail Link by 32km to the Thai border.
Poland’s rail freight market grew 2.7% in the first nine months of 2026 to 164.99 million tonnes, with tonne-kilometres up 6.7%. Intermodal traffic rose strongly, while mining-related freight fell. PKP Cargo remained the largest operator, and freight punctuality weakened in Q2.
UIC’s Global Level Crossing Network met in London on 28 October 2026 to share research and measures on level crossing safety, including youth risk perception, pedestrian fatalities, enforcement using drones, and human-factors assessment on low-frequency lines. UIC said a consolidated IRS on level crossing safety will be published by early 2027.
ÖBB and SBB have extended their partnership to 2036 to continue daytime long-distance and joint night train services between Austria and Switzerland, including routes linking Vienna, Zurich, Innsbruck, Salzburg and other European cities. The companies say cross-border passenger numbers have grown over the past decade.
The Mutiara Line LRT link from Macallum to Penang Sentral, including a 5.5 km marine bridge across the Penang Strait, is expected to start construction in Q3 2027 after MRT Corp completes tender evaluation this month. Completion is targeted for December 2031.
Tracsis says predictive rail asset maintenance is moving from concept to operational use by combining remote condition monitoring data with machine learning. The company is testing a field-deployable predictive platform with selected client partners on busy rail networks to refine model accuracy and reliability.
At IRSC Lisbon 2026, UIC presented work on safety culture, cyber resilience, risk assessment harmonisation, wayside monitoring, AI for level crossings, and safety management for Portugal’s future Lisbon-Porto high-speed line. The conference highlighted international cooperation on railway safety and innovation.
An analysis says investors should focus on Alstom’s free cash flow recovery rather than its order book when judging turnaround potential.
Parsons, with Systra and Egis in the RMTC joint venture, has been awarded project and construction management services for the Riyadh Metro Red Line Extension in Saudi Arabia. The 8.4-km extension will add five stations and connect King Saud University to Diriyah South.
Indian Railways reported higher coal and overall freight loading in October, CONCOR ordered 12 rakes of container wagons from Golden Rock Workshop, DP World expanded double-stack services from JNPA, and the Rowghat iron ore line was commissioned. A new East-West dedicated freight corridor is under study.
Ground movement near Bentley on the South Western Railway line will require urgent embankment strengthening work from 6 to 8 November, with buses replacing trains between Farnham and Alton and speed restrictions in place before the work starts.
Holmatro says it has developed and supplied rerailing hydraulic systems for trains, metros and trams over the past decade, with deployments in countries including the Netherlands, Australia, the United States, Spain, China and Thailand. It highlights lighter aluminum components, remote control, and safety features for faster recovery after derailments.
UIC WG1 Station & Urban Design meeting will be held online on 1 December 2026.
UIC has released IRS 30345, a new non-binding standard for procuring new rolling stock with harmonised environmental specifications. It replaces UIC Leaflet 345 and sets guidance on energy use, emissions, noise, air quality, and circularity, including raising component recyclability targets from 85% to 95%.