MCMC is testing internet coverage along the 378km Phase 1 East Coast Rail Link route from Gombak to Kota Baru, including 16 stations and tunnels, ahead of the Dec 12 launch. Maxis, appointed by MRL as the 4G infrastructure provider, has presented its implementation plan.
Everything we read, routed to your cluster
Freightliner has introduced a new logo after CMA CGM completed its acquisition of the UK intermodal business on 29 January 2026. The deal covered rail and road operations, inland terminals and the Freightliner brand, while heavy haul, Rotterdam Rail Feeding, and operations in Poland and Germany were excluded.
UIC will hold an online New Technologies Working Group Meeting on 24 Nov 2026 from 14:00 to 17:00.
Amorim Cork Solutions supplied under ballast mats for a railway infrastructure project in Pampilhosa do Botão, Portugal, to help control vibration in a track transition zone beside a bridge. The mats were selected for their elastic support and ability to reduce vibration transmission under repeated train loading.
The Northampton and Lamport Railway will run its Winter Warmer event on 3 January 2027, with two steam locomotives in service and Bagnall No. 2 making its last operating day before leaving the railway.
Chiltern Railways said it will run over 90% of services on 12 November despite RMT industrial action, with some Birmingham, Stratford-upon-Avon and Leamington Spa services reduced or suspended. The operator also said all East West Rail services will have two staff on board.
Holmatro says it has developed and supplied rerailing hydraulic systems for trains, metros and trams over the past decade, with deployments in countries including the Netherlands, Australia, the United States, Spain, China and Thailand. It highlights lighter aluminum components, remote control, and safety features for faster recovery after derailments.
UIC lists a Regional Chair Meeting on 3 Dec 2026 from 09:30 to 10:30. No further agenda or location details are provided in the text.
A rear-end collision between an Iryo train and a Renfe AVE train on Spain’s Madrid–Andalusia high-speed line near Toledo killed at least 50 people and injured about 179. Adif suspended traffic on the corridor while emergency response and investigation work continued.
Indian Railways reported higher coal and overall freight loading in October, CONCOR ordered 12 rakes of container wagons from Golden Rock Workshop, DP World expanded double-stack services from JNPA, and the Rowghat iron ore line was commissioned. A new East-West dedicated freight corridor is under study.
BASF InfraService & Solutions Lausitz will haul quartz sand between Hohenbocka and Schwarzheide for Captrain subsidiary RBB using its industrial railway, locomotives and staff. BASF also plans to use spare rail capacity for further third-party freight contracts.
Kenya Railways has begun vehicle transport on the Standard Gauge Railway between Mombasa and Nairobi, moving 21 cars on its first service. The operation uses adapted vehicle wagons alongside container trains and is being developed with Autobarn East Africa for about 700 vehicles a month.
Singapore will revamp its Rail Academy from November, partnering five educational institutions and consolidating training from LTA, SMRT and SBS Transit into a common curriculum. The scheme will create clearer pathways for rail workers to earn formal diplomas, degrees and new sector certifications, with WSQ certification starting in early 2027.
Stadler has begun commissioning the first RBe 546 FLIRT EMU for Sihltal Zürich Uetliberg Bahn in Switzerland. The 17 three-car units were ordered in September 2024, with type testing in 2027 and commercial service planned from May 2028.
At InnoTrans 2026 in Berlin, SOGECLAIR TRAINING & SIMULATION presented Oksygen® and LITE, simulation tools for driver and operator training. The platforms use real infrastructure data, digital twins, 2D/3D modelling and portable hardware to support training, assessment and operational readiness.
UIC lists ICHSC plenary sessions as a work meeting at SNCF Group HQ in Saint-Denis on 1–2 Dec 2026.
An incident between Crewe and Stafford blocked the line, disrupting trains with cancellations, diversions and delays of 60 minutes or more until about 3pm on 3 November 2026. Avanti West Coast, CrossCountry, London Northwestern Railway and Lumo services were affected.
Prime Minister Narendra Modi inaugurated Pune Metro Line 3 (23 km) and laid the foundation stone for Pune Metro Phase-II projects worth about ₹13,500 crore. The new phase covers four corridors: Lines 2A, 2B, 4 and 4A, aimed at expanding metro connectivity across Pune.
CSX expanded its Chambersburg intermodal terminal after volumes rose from 159,000 units in 2023 to 192,000 in 2025. The railway added a rubber-tyred gantry crane, two reach stackers and more parking space, and is now enlarging the maintenance facility. Further expansion options are under review.
Anthony Loke said ECRL is projected to generate RM418 million in revenue by 2029, with cargo services contributing 70% and passenger services 30%.