India’s first indigenous bullet trainset, B28, is taking shape at BEML’s Bengaluru facility for the Mumbai–Ahmedabad High-Speed Rail corridor. The train is designed for a maximum test speed of 280 km/h, with rollout expected by end-2026 or early 2027 and a tentative inaugural run on the Surat–Vapi section in August 2027.
Everything we read, routed to your cluster
Chiltern Railways will offer free travel to serving military personnel and veterans travelling to Remembrance events on 7-8 November, with free return travel from London on 8 November. Veterans can use a Veterans Railcard, Veterans Oyster card, or other ID.
MCMC is testing internet coverage along the 378km Phase 1 East Coast Rail Link route from Gombak to Kota Baru, including 16 stations and tunnels, ahead of the Dec 12 launch. Maxis, appointed by MRL as the 4G infrastructure provider, has presented its implementation plan.
Ports & Rail Week 2026 will be held on 24-25 November 2026 in Durban, South Africa. The event will focus on port and rail infrastructure, intermodal connectivity, green transport, digitalization, AI, automation, PPPs, and safety in African transport corridors.
NYC subway ridership hit 3.14 million on Marathon Sunday, the highest Sunday in MTA records and 109% of the comparable pre-pandemic level. Late October also set post-pandemic records for daily, weekend and weekly subway ridership, helped by extra service and staffing.
Alstom announced the first ETCS Level 2 passenger service in Romania, using a Traxx Passenger electric locomotive and ETCS Level 2 trackside infrastructure between Buftea and Brazi on the Bucharest–Budapest line. The service began after the locomotives entered passenger operation in September 2026.
ScotRail will add extra carriages and staff, and manage queuing at Haymarket, for the Scotland v New Zealand rugby international at Murrayfield on 7 November 2026. Services on several routes are expected to be very busy, and passengers are advised to buy tickets in advance.
Bachmann Europe announced its winter 2026 model railway releases, led by an OO-scale exclusive of LNER A2 No. 60532 Blue Peter in Express Blue. The range also includes new N and OO scale locomotives, wagons, coaches, buildings and accessories.
Severn Valley Railway says its Halloween services sold out and Christmas steam specials are booking quickly. The heritage railway is offering Elf Express and Santa Steam experiences with live entertainment, storytelling and children’s gifts.
Amtrak has launched its Winter Wanderlust sale, offering up to 30% off fares on U.S. routes for travel between 1 December 2026 and 14 March 2027. The sale runs until 12 November and applies to Coach and Acela Business Class bookings.
Bala Lake Railway in North Wales will run two Santa steam trains on 12–13 December 2026. Pre-booked passengers will travel from Llanwchllyn to Bala Pen-y-Bont and visit Santa’s Grotto; children receive gifts and adults get a hot drink or cherry.
Chiltern Railways said it will run over 90% of services on 12 November despite RMT industrial action, with some Birmingham, Stratford-upon-Avon and Leamington Spa services reduced or suspended. The operator also said all East West Rail services will have two staff on board.
GMRC has invited bids for the ₹197.14 crore development and construction of the Gyaspur Depot for the Ahmedabad Metro Rail Project in Gujarat. The package covers depot infrastructure, an Operations Control Centre, and associated electrical and mechanical works. Bid submission closes on 20 November 2026.
KORAIL won the 2026 UIC Sustainability Impact Awards’ Modal Shift category for its “Love Regional Rail Travel” initiative, which promotes rail tourism with local partners and a 50% fare discount. The programme launched in August 2024 and had about 470,000 passengers by July 2026.
SRI Rail Invest ordered a Vectron Dual Mode locomotive for delivery in late 2027 or early 2028. In a separate deal, it arranged financing for Projektbahn to acquire former ICE 2 vehicles from DB Fernverkehr.
MRT Corp awarded the RM2.69 billion Civil Main Contract 2 for the Penang LRT Mutiara Line. The package covers a 5.5km extension from Macallum to Penang Sentral, including a 3.05km sea-crossing bridge. The project is under construction and reported 16% complete.
Azerbaijan Railways signed a contract with CRRC Zhuzhou Locomotive to buy four new passenger trains.
Indian Railways freight loading rose 8.32% year over year to 145.07 million tonnes in October 2026, the best October on record. Growth was led by food grains and domestic coal. April–October freight loading reached 978.78 million tonnes, up 4.67% from a year earlier; passenger traffic also increased.
UIC lists the 43rd Regional Assembly Europe on 3 December 2026, scheduled from 14:30 to 17:00.
Singapore and Malaysia conducted a joint exercise simulating a fire on a stranded Johor Bahru-Singapore RTS Link train. The drill tested firefighting, triage, casualty evacuation, and cross-border command and communication ahead of passenger operations targeted for February 2027.
India approved a proposed 1,500-km North Bullet Train Corridor from Delhi to Guwahati, with stops including Agra, Kanpur, Lucknow, Varanasi, Patna and Siliguri. Detailed alignment, stations, schedule and financing are not yet set. The government said the programme will emphasize Make in India and lower fares than air travel.
The Northampton and Lamport Railway will run its Winter Warmer event on 3 January 2027, with two steam locomotives in service and Bagnall No. 2 making its last operating day before leaving the railway.
Renfe named Siemens Mobility the winner of a tender for up to 40 high-speed trains in Spain, with a rendering shown of the Velaro Novo design.
An opinion piece says the ECRL is nearing a defining moment in Malaysia, with passenger service due to start on 12 December 2026. It highlights expected travel-time savings, dynamic fare pricing, concessions and the importance of first- and last-mile connectivity around stations.
Ground movement near Bentley on the South Western Railway line will require urgent embankment strengthening work from 6 to 8 November, with buses replacing trains between Farnham and Alton and speed restrictions in place before the work starts.