The Vale of Rheidol Railway has completed its acquisition of the Brecon Mountain Railway in Wales. The two heritage narrow-gauge railways will keep their separate identities and locomotive fleets, while sharing engineering knowledge, maintenance, restoration work and facilities at Aberystwyth.
Everything we read, routed to your cluster
Siemens completed its acquisition of MERMEC’s signaling, electrification, telecommunication, diagnostics and analytics businesses. The acquired perimeter includes about 1,700 employees and €430 million in fiscal 2025 revenue, with signaling contributing about 60% of revenue. Siemens said the businesses serve customers in more than 70 countries.
India’s first indigenous bullet trainset, B28, is taking shape at BEML’s Bengaluru facility for the Mumbai–Ahmedabad High-Speed Rail corridor. The train is designed for a maximum test speed of 280 km/h, with rollout expected by end-2026 or early 2027 and a tentative inaugural run on the Surat–Vapi section in August 2027.
Jupiter Wagons said it won about EUR 138 million in new business in India for 2,583 freight wagons for Indian Railways and 405 ACT2 automobile carriers for GATX India and Chetak International. The Ministry of Railways also issued a separate tender for 5,800 BOBRN wagons, with no award yet announced.
Anthony Loke said the East Coast Rail Link (ECRL) is projected to generate RM418 million in operating revenue from passenger and cargo services by 2029.
Stadler has started construction of a new commissioning facility in Weinfelden, Switzerland, to relieve capacity constraints at its Erlen site. The EUR 44 million project includes indoor and outdoor test tracks, final assembly areas and technical space. Operations are expected to begin in the first half of 2028.
Alstom announced the first ETCS Level 2 passenger service in Romania, using a Traxx Passenger electric locomotive and ETCS Level 2 trackside infrastructure between Buftea and Brazi on the Bucharest–Budapest line. The service began after the locomotives entered passenger operation in September 2026.
GMRC has invited bids for the ₹197.14 crore development and construction of the Gyaspur Depot for the Ahmedabad Metro Rail Project in Gujarat. The package covers depot infrastructure, an Operations Control Centre, and associated electrical and mechanical works. Bid submission closes on 20 November 2026.
Renfe named Siemens Mobility the winner of a tender for up to 40 high-speed trains in Spain, with a rendering shown of the Velaro Novo design.
ÖBB and SBB extended their passenger rail cooperation to 2036, covering more than 30 daily direct services and six night train routes from Zürich. Passenger numbers on the joint services have grown strongly over the past decade, alongside ÖBB’s rollout of new Siemens-built Nightjet trains.
GBR Anglia is offering free return travel for veterans and serving military personnel attending Remembrance services on 7–8 November on c2c and Greater Anglia, with similar support from London Northwestern Railway. The offer also now includes one immediate bereaved family member, using proof of eligibility and a complimentary ticket process.
A Scottish fatal accident inquiry found that an off-design drain, missing as-built records, and maintenance and weather-management gaps contributed to the 2020 Carmont derailment. The inquiry said building the drain to its approved design might realistically have prevented the crash. No new recommendations were made.
Singapore and Malaysia conducted a joint exercise simulating a fire on a stranded Johor Bahru-Singapore RTS Link train. The drill tested firefighting, triage, casualty evacuation, and cross-border command and communication ahead of passenger operations targeted for February 2027.
At InnoTrans 2026 in Berlin, SOGECLAIR TRAINING & SIMULATION presented Oksygen® and LITE, simulation tools for driver and operator training. The platforms use real infrastructure data, digital twins, 2D/3D modelling and portable hardware to support training, assessment and operational readiness.
UIC reported that GCU Joint Committee members and rail freight experts met in Mainz on 29 October 2026 for a workshop on the future of the GCU, focusing on contract application, governance, organisation and digitalisation. The work will continue into concrete next steps.
Southeastern held its annual Remembrance Service in Dover on 4 November, with veterans, cadets and railway colleagues attending. The operator also reminded veterans, serving personnel and bereaved family members that they can travel to Remembrance services for free.
CRRC Dalian and Temoinsa won an order in Chile for four CDA3 diesel locomotives. The locomotives have a maximum speed of 120 km/h, are intended for routine infrastructure maintenance, and will replace ageing equipment. First delivery is expected in about 18 months.
Malaysia and Singapore held a joint emergency response exercise for the Johor Bahru-Singapore RTS Link on 27–28 October 2026 at RTS Wadi Hana Depot. The drill tested firefighting, medical triage, casualty evacuation, and cross-border coordination by agencies from both countries ahead of passenger service start.
A rear-end collision between an Iryo train and a Renfe AVE train on Spain’s Madrid–Andalusia high-speed line near Toledo killed at least 50 people and injured about 179. Adif suspended traffic on the corridor while emergency response and investigation work continued.
SYSTRA, as part of the RMTC joint venture led by Parsons, has been awarded PMCM consultancy for the Riyadh Metro Red Line extension in Saudi Arabia. The project will add 5.4 km, eight stations, mostly underground tunnels, and connect Diriyah to the wider network.
India approved a proposed 1,500-km North Bullet Train Corridor from Delhi to Guwahati, with stops including Agra, Kanpur, Lucknow, Varanasi, Patna and Siliguri. Detailed alignment, stations, schedule and financing are not yet set. The government said the programme will emphasize Make in India and lower fares than air travel.
Trafikverket outlined Sweden’s winter rail maintenance setup for 14,400 km of track, including 32 maintenance contracts, 3,200 workers, 960 vehicles, heated switches, snow-melting machines and new hot-air de-icing systems. Contractors must respond within 60 to 120 minutes depending on time and route.
Hitachi Rail opened a new C$30 million, 125,000-square-foot headquarters and center of excellence for signalling and systems in Toronto, Canada. The facility is intended to support the company’s signalling and systems work in the Canadian market.
East Midlands Railway says the Derwent Valley Line between Derby and Matlock will close from 14 to 22 November 2026 for £3m of Network Rail upgrade works, mainly track renewals at Whatstandwell, Cromford and Matlock Bath. Over 3,500 sleepers and 6,400 tonnes of ballast will be installed.
Azerbaijan Railways signed a contract with CRRC Zhuzhou Locomotive to buy four new passenger trains.