The Transport Minister said the East Coast Rail Link is projected to generate RM418 million in operating revenue from passenger and cargo services by 2029.
Everything we read, routed to your cluster
Network Rail completed drainage renewal and related maintenance on the East Coast Main Line in North Yorkshire after two weekend possessions. The programme included 300 metres of drainage at Chapman’s Bridge near Shipton, work on track, power lines and points, vegetation management, and a new bridge at Church Fenton for overhead line preparation.
Renfe has awarded Siemens a contract for 30 seven-car Velaro Novo high-speed trains. The trains will run up to 350 km/h, seat 520 passengers each, and be delivered over 62 months, with the first five due within 40 months.
Network Rail completed nine days of work to renew and strengthen Saxmundham junction on East Suffolk Line, converting it from manual to powered operation and upgrading signalling and infrastructure. The improvements support increased freight traffic to the Sizewell C construction site and resumed Greater Anglia services between Halesworth and Ipswich.
Freightliner has introduced a new logo after CMA CGM completed its acquisition of the UK intermodal business on 29 January 2026. The deal covered rail and road operations, inland terminals and the Freightliner brand, while heavy haul, Rotterdam Rail Feeding, and operations in Poland and Germany were excluded.
Malaysia has approved funding for preliminary work to extend the under-construction East Coast Rail Link by 32km to the Thai border.
SRI Rail Invest ordered a Vectron Dual Mode locomotive for delivery in late 2027 or early 2028. In a separate deal, it arranged financing for Projektbahn to acquire former ICE 2 vehicles from DB Fernverkehr.
VIA Rail Canada completed the modernisation of its Toronto Maintenance Centre, funded by a US$310 million Government of Canada investment. The upgraded facility supports maintenance of VIA Rail’s new Corridor fleet of 32 bidirectional trainsets and existing equipment, with expanded bays, heavy-maintenance tools and a new vehicle monitoring system.
Poland’s rail freight market grew 2.7% in the first nine months of 2026 to 164.99 million tonnes, with tonne-kilometres up 6.7%. Intermodal traffic rose strongly, while mining-related freight fell. PKP Cargo remained the largest operator, and freight punctuality weakened in Q2.
EBRD will fund €50 million for rehabilitation of Montenegro’s 39 km Golubovci–Bar railway section, including track, stations, bridges, signalling, telecommunications and power upgrades. Separately, ŽPCG and Stadler are progressing discussions on the design of three new electric multiple units.
UIC will hold the 5th Global FRMCS Conference on 24–25 November 2026 in Paris. The event will cover FRMCS technical developments, V3p specifications, large-scale testing under FP2 MORANE 2, and global deployment challenges for next-generation railway communications.
CPKC signed a five-year agreement to increase steelmaking coal shipments from British Columbia to Vancouver export terminals. CN expanded its Vaughan, Ontario fuel terminal to handle more than 15,000 railcars a year. Audi chose a Norfolk Southern-served site in Georgia for a EUR 3.6 billion factory.
Network Rail will replace the 160-year-old Selhurst railway bridge in London over the Christmas period. The old bridge will be removed using self-propelled modular transporters, and Selhurst Road will be closed from 12 December to 10 January while the station remains open.
Siemens Mobility launched Tech Experience Launchpad, a UK work-experience programme for 11–16-year-olds that will offer more than 3,300 opportunities a year and 10,000 over three years. The initiative coincided with the opening of Siemens’s £100 million Rail Technology Centre in Chippenham and supports UK rail skills development.
The California High-Speed Rail Authority approved Siemens’ contract to supply three AP220 high-speed trainsets, spare parts and 10 years of maintenance. The deal is worth USD 772.1 million, with options for up to 19 more trainsets. Initial manufacture and testing will be in Germany, with California testing planned from 2030.
GMRC has invited bids for the ₹197.14 crore development and construction of the Gyaspur Depot for the Ahmedabad Metro Rail Project in Gujarat. The package covers depot infrastructure, an Operations Control Centre, and associated electrical and mechanical works. Bid submission closes on 20 November 2026.
Canada has shortened the timetable for Roberts Bank Terminal 2 at the Port of Vancouver to 2035, with a final investment decision expected by mid-2027. The project includes a widened causeway with road and railway infrastructure, while the federal government is also developing a broader rail strategy for the port.
India’s Railway Board granted conditional clearance for a 16-car Vande Bharat Chair Car trainset built by RCF Kapurthala with Alstom propulsion, allowing operation up to 160 km/h subject to technical conditions. The Board raised issues on displays, protection, cabling, equipment mounting and traction motor rating.
Chiltern Railways will offer free travel to serving military personnel and veterans travelling to Remembrance events on 7-8 November, with free return travel from London on 8 November. Veterans can use a Veterans Railcard, Veterans Oyster card, or other ID.
Hitachi Rail opened a new C$30 million, 125,000-square-foot headquarters and center of excellence for signalling and systems in Toronto, Canada. The facility is intended to support the company’s signalling and systems work in the Canadian market.
Network Rail has issued travel advice for Manchester Christmas Markets, which open on 6 November 2026 and are expected to draw heavy crowds on Northern and TransPennine Express services. Passengers are advised to plan ahead, use earlier return trains, and expect extra staff at Manchester Piccadilly.
Network Rail will replace a substandard railway bridge over Agbrigg Road in Wakefield for £5m over the Christmas period. The work will require a line closure between Doncaster and Leeds and road closures near Sandal and Agbrigg station.
The article argues that rail emergency exit systems should still function without connectivity or power, citing EU interoperability rules and the IEC RAMS framework. It says physically independent mechanisms can complement digitally enabled systems in trains.
India approved a proposed 1,500-km North Bullet Train Corridor from Delhi to Guwahati, with stops including Agra, Kanpur, Lucknow, Varanasi, Patna and Siliguri. Detailed alignment, stations, schedule and financing are not yet set. The government said the programme will emphasize Make in India and lower fares than air travel.
Hitachi Rail marked the opening of the first operational section of Chennai Metro Phase II, a 15 km, 11-station elevated corridor powered by its CBTC signalling for GoA4 driverless operation. The wider Phase II signalling contract, awarded in 2023, covers 119 km of metro lines.