UIC’s Global Level Crossing Network met in London on 28 October 2026 to share research and measures on level crossing safety, including youth risk perception, pedestrian fatalities, enforcement using drones, and human-factors assessment on low-frequency lines. UIC said a consolidated IRS on level crossing safety will be published by early 2027.
Everything we read, routed to your cluster
Siemens Mobility launched Tech Experience Launchpad, a UK work-experience programme for 11–16-year-olds that will offer more than 3,300 opportunities a year and 10,000 over three years. The initiative coincided with the opening of Siemens’s £100 million Rail Technology Centre in Chippenham and supports UK rail skills development.
MCMC is testing internet coverage along the 378km Phase 1 East Coast Rail Link route from Gombak to Kota Baru, including 16 stations and tunnels, ahead of the Dec 12 launch. Maxis, appointed by MRL as the 4G infrastructure provider, has presented its implementation plan.
Singapore will expand the Singapore Rail Academy’s role from November with standardised training, wider eligibility, and new certification pathways for engineers, technicians and operations staff. The changes, developed with LTA and rail operators, are meant to support MRT network expansion, upgrades and future technology adoption.
The Malaysian government has approved over RM250 million to support ECRL development in Kelantan, including RM30 million for a new bus terminal at Kota Bharu ECRL Station and more than RM200 million for preliminary works on a proposed extension to Rantau Panjang.
A Southco guide explains monitor mounts, torque control methods, and selection factors such as weight, vibration, safety factor, and end-use environment for applications including kiosks, vehicles, and industrial equipment.
At InnoTrans 2026, Vossloh launched new fastening systems for conventional, high-speed and urban rail, and added TrackStability software functions for track-buckling risk. The company also won about EUR 60 million in rail fastening contracts for two high-speed lines in Shandong, China, with deliveries from 2027.
India’s first indigenous bullet trainset, B28, is taking shape at BEML’s Bengaluru facility for the Mumbai–Ahmedabad High-Speed Rail corridor. The train is designed for a maximum test speed of 280 km/h, with rollout expected by end-2026 or early 2027 and a tentative inaugural run on the Surat–Vapi section in August 2027.
GB Railfreight has appointed Jude Winstanley as CEO from 2 November 2026. John Smith will stay on in an advisory role on UK rail reform. The company says it continues investing in locomotives, maintenance facilities and depots, including Class 99 bi-mode locomotives.
Singapore will revamp its Rail Academy from November, partnering five educational institutions and consolidating training from LTA, SMRT and SBS Transit into a common curriculum. The scheme will create clearer pathways for rail workers to earn formal diplomas, degrees and new sector certifications, with WSQ certification starting in early 2027.
UIC lists the 43rd Regional Assembly Europe on 3 December 2026, scheduled from 14:30 to 17:00.
PKP PLK is considering converting some existing Polish electrified main lines from 3 kV DC to 2×25 kV AC. The programme has two phases through 2045, with consultations planned in November 2026 and a final programme expected by year-end, subject to financing.
UIC held a webinar on 3 November 2026 on rail’s role in suicide prevention, covering effective interventions, means restriction, staff training, data sharing and new technologies such as fencing, lighting, CCTV and real-time track intrusion alerts.
VIA Rail Canada completed the modernisation of its Toronto Maintenance Centre, funded by a US$310 million Government of Canada investment. The upgraded facility supports maintenance of VIA Rail’s new Corridor fleet of 32 bidirectional trainsets and existing equipment, with expanded bays, heavy-maintenance tools and a new vehicle monitoring system.
Anthony Loke said ECRL is projected to generate RM418 million in revenue by 2029, with cargo services contributing 70% and passenger services 30%.
The European Commission approved €29.3 million in German state aid for a new intermodal freight terminal at Stolberg Hauptbahnhof near Aachen. The terminal, part of the Euregio Railport project, is planned to open in 2035 and handle 740-metre freight trains, supporting rail freight flows to and from Benelux ports.
Freightliner renamed locomotive 90040 as The Railway Mission at a ceremony in Crewe. It is the first locomotive to carry Freightliner’s refreshed branding after the CMA CGM takeover, and Freightliner also donated £1,000 to Railway Mission.
VIA Rail has completed a C$310 million modernization of its Toronto Maintenance Centre, adding expanded heavy-maintenance facilities and a Vehicle Equipment Measurement System for early fault detection. The federally funded project supports VIA’s new Siemens Venture Corridor fleet and existing trains.
MRT Corp has awarded a RM2.69 billion civil main contract to a JV of CCCC, TRC Construction and Ufuk Semarak for the Penang LRT Mutiara Line cross-sea extension. The 5.5km package includes a 3.05km sea bridge linking Macallum on Penang Island to Penang Sentral in Seberang Perai.
Danish State Railways awarded ELL a EUR 26.35 million lease contract for up to 12 Siemens Vectron AC locomotives for regional and long-distance passenger services. The contract includes maintenance, spare parts and availability support, with initial entry into service expected from December 2026.
A commentary says Alstom shares fell sharply after two profit warnings, with the company still weighed down by delayed projects, cost overruns and integration issues after the Bombardier Transportation deal. It says another warning cannot be ruled out as the new CEO prepares a future strategy update in 2027.
UIC released a report on how liberalisation affects high-speed rail affordability, using Spain as the main case study and comparing Italy, France and Germany. It finds lower average fares, wider service choice and higher ridership in Spain, while stressing that results depend on local market and regulatory conditions.
Stadler has begun commissioning the first RBe 546 FLIRT EMU for Sihltal Zürich Uetliberg Bahn in Switzerland. The 17 three-car units were ordered in September 2024, with type testing in 2027 and commercial service planned from May 2028.
Penang’s Mutiara Line LRT Macallum–Penang Sentral alignment, including a 5.5km marine bridge across the Penang Strait, is scheduled to start construction in 3Q2027 after MRT Corp completes tender evaluation this month. The alignment is targeted for completion by December 2031.
Avanti West Coast has released tickets through the new year and is advising customers to book Christmas travel early for the best fares. Peak restrictions will be lifted from 18 December to 3 January. Planned engineering work on the West Coast Main Line includes a five-day closure of Birmingham New Street.