Opinion piece on the East Coast Rail Link (ECRL), saying the project is approaching a defining moment in Malaysia’s infrastructure development and discussing benefits for passengers.
Everything we read, routed to your cluster
CRRC Dalian and Temoinsa won an order in Chile for four CDA3 diesel locomotives. The locomotives have a maximum speed of 120 km/h, are intended for routine infrastructure maintenance, and will replace ageing equipment. First delivery is expected in about 18 months.
Ports & Rail Week 2026 will be held on 24-25 November 2026 in Durban, South Africa. The event will focus on port and rail infrastructure, intermodal connectivity, green transport, digitalization, AI, automation, PPPs, and safety in African transport corridors.
An incident between Crewe and Stafford blocked the line, disrupting trains with cancellations, diversions and delays of 60 minutes or more until about 3pm on 3 November 2026. Avanti West Coast, CrossCountry, London Northwestern Railway and Lumo services were affected.
UIC lists ICHSC plenary sessions as a work meeting at SNCF Group HQ in Saint-Denis on 1–2 Dec 2026.
GMRC has invited bids for the ₹197.14 crore development and construction of the Gyaspur Depot for the Ahmedabad Metro Rail Project in Gujarat. The package covers depot infrastructure, an Operations Control Centre, and associated electrical and mechanical works. Bid submission closes on 20 November 2026.
ZSSK plans to invest €43.9 million in six battery-electric shunting locomotives for Bratislava and Žilina, with delivery planned by end-2030. Slovakia’s finance ministry recommends battery traction over diesel on lifecycle-cost grounds, ahead of ETCS-only operation on key corridors from 2031.
Severn Valley Railway will host Class 55 Deltic D9015 Tulyar from 13 to 16 May 2027 during its Spring Diesel Festival, marking 40 years since the line’s first diesel gala. The locomotive returned to passenger service in 2026 after a 30-year restoration.
Network Rail completed drainage renewal and related maintenance on the East Coast Main Line in North Yorkshire after two weekend possessions. The programme included 300 metres of drainage at Chapman’s Bridge near Shipton, work on track, power lines and points, vegetation management, and a new bridge at Church Fenton for overhead line preparation.
Stadler has begun commissioning the first RBe 546 FLIRT EMU for Sihltal Zürich Uetliberg Bahn in Switzerland. The 17 three-car units were ordered in September 2024, with type testing in 2027 and commercial service planned from May 2028.
Transport for Greater Manchester will start redeveloping Bury Interchange later this month in two phases. The first phase includes a new footbridge, lift access to Metrolink platforms, platform resurfacing, canopy replacement, and upgrades to lighting, signage, CCTV, passenger information displays and ticketing facilities.
Siemens Mobility launched Tech Experience Launchpad, a UK work-experience programme for 11–16-year-olds that will offer more than 3,300 opportunities a year and 10,000 over three years. The initiative coincided with the opening of Siemens’s £100 million Rail Technology Centre in Chippenham and supports UK rail skills development.
BBG Infrastructure won a ₹137.93 crore DMRC contract to design and construct seven elevated metro stations and a foot overbridge for Delhi Metro Phase 4. The tender had two bidders, but only BBG qualified technically. The work period is 660 days.
Stadler has started construction of a new commissioning facility in Weinfelden, Switzerland, to relieve capacity constraints at its Erlen site. The EUR 44 million project includes indoor and outdoor test tracks, final assembly areas and technical space. Operations are expected to begin in the first half of 2028.
The Polar Express train ride will return to South Devon Railway from 27 November to 23 December, with themed journeys, characters, entertainment, and visits to Father Christmas. Tickets are expected to sell quickly.
The Merchant Navy Locomotive Preservation Society has formally taken ownership of steam locomotive 35025 Brocklebank Line. The group is assessing required restoration work, available parts and storage plans, with major components still needed for a future mainline return.
Trafikverket outlined Sweden’s winter rail maintenance setup for 14,400 km of track, including 32 maintenance contracts, 3,200 workers, 960 vehicles, heated switches, snow-melting machines and new hot-air de-icing systems. Contractors must respond within 60 to 120 minutes depending on time and route.
Financial Times article on Alstom says the French rail company is facing a series of disruptions and knock-on problems. The provided text is only a partial excerpt.
Chiltern Railways will offer free travel to serving military personnel and veterans travelling to Remembrance events on 7-8 November, with free return travel from London on 8 November. Veterans can use a Veterans Railcard, Veterans Oyster card, or other ID.
EdgeProp profiles Summer Suites, a freehold serviced residence in Johor Bahru by Connoisseur Properties, about 850m from JB CIQ and the future Bukit Chagar RTS Station. The 44-storey project has 748 units, smart-home features, more than 20 facilities, and a target completion in 2029.
Wensleydale Railway in Yorkshire received free track design support from TECS Ltd, which surveyed Leeming Bar yard and Bedale station curve and offered to complete design work for a yard reconfiguration and track relay.
Berlin-based Rail Unit received a Stadler EuroDual and an Alstom TRAXX MS3 in October 2026 as it expands from railway personnel services into its own freight operations in Germany. The locomotives were leased from European Loc Pool and Northrail, following the company’s railway undertaking licence and safety certification.
Hitachi Rail marked the opening of the first operational section of Chennai Metro Phase II, a 15 km, 11-station elevated corridor powered by its CBTC signalling for GoA4 driverless operation. The wider Phase II signalling contract, awarded in 2023, covers 119 km of metro lines.
The California High-Speed Rail Authority approved Siemens’ contract to supply three AP220 high-speed trainsets, spare parts and 10 years of maintenance. The deal is worth USD 772.1 million, with options for up to 19 more trainsets. Initial manufacture and testing will be in Germany, with California testing planned from 2030.
Talyllyn Railway Preservation Society and Vintage Trains Charitable Trust have formed a partnership to mark the society’s 75th anniversary. The collaboration was highlighted by twinning two Birmingham-built carriages during a heritage steam special. The Talyllyn Railway also received a £3.7m National Lottery Heritage Fund grant in January for engineering facility upgrades.