The California High-Speed Rail Authority approved Siemens’ contract to supply three AP220 high-speed trainsets, spare parts and 10 years of maintenance. The deal is worth USD 772.1 million, with options for up to 19 more trainsets. Initial manufacture and testing will be in Germany, with California testing planned from 2030.
Everything we read, routed to your cluster
Great Northern will increase off-peak services between Moorgate and Hertford North to four trains per hour from 14 December, creating a 15-minute turn-up-and-go frequency at most stations on the route.
Anthony Loke said the East Coast Rail Link (ECRL) is projected to generate RM418 million in operating revenue from passenger and cargo services by 2029.
Train services between Peterborough and London King’s Cross will be disrupted on 28–29 November due to digital signalling installation work on the East Coast Main Line. The work includes diagnostic system and software updates, track renewal, step-free access works, canopy work, and overhead line equipment upgrades.
The Malaysian government has approved over RM250 million to support ECRL development in Kelantan, including RM30 million for a new bus terminal at Kota Bharu ECRL Station and more than RM200 million for preliminary works on a proposed extension to Rantau Panjang.
MRT Corp awarded the RM2.69 billion Civil Main Contract 2 for the Penang LRT Mutiara Line. The package covers a 5.5km extension from Macallum to Penang Sentral, including a 3.05km sea-crossing bridge. The project is under construction and reported 16% complete.
Hitachi Rail opened a new C$30 million, 125,000-square-foot headquarters and center of excellence for signalling and systems in Toronto, Canada. The facility is intended to support the company’s signalling and systems work in the Canadian market.
ÖBB and SBB have extended their partnership to 2036 to continue daytime long-distance and joint night train services between Austria and Switzerland, including routes linking Vienna, Zurich, Innsbruck, Salzburg and other European cities. The companies say cross-border passenger numbers have grown over the past decade.
Sydney Metro Southwest has opened passenger services, completing Sydney’s 66 km metro line with 31 stations. Alstom supplied Metropolis trains, Urbalis CBTC signalling and maintenance services for the extension, and also maintains the fleet at Metro Trains Sydney’s Tallawong depot.
UIC released a report on how liberalisation affects high-speed rail affordability, using Spain as the main case study and comparing Italy, France and Germany. It finds lower average fares, wider service choice and higher ridership in Spain, while stressing that results depend on local market and regulatory conditions.
GBR Anglia is offering free return travel for veterans and serving military personnel attending Remembrance services on 7–8 November on c2c and Greater Anglia, with similar support from London Northwestern Railway. The offer also now includes one immediate bereaved family member, using proof of eligibility and a complimentary ticket process.
UIC lists the 43rd Regional Assembly Europe on 3 December 2026, scheduled from 14:30 to 17:00.
Freightliner renamed locomotive 90040 as The Railway Mission at a ceremony in Crewe. It is the first locomotive to carry Freightliner’s refreshed branding after the CMA CGM takeover, and Freightliner also donated £1,000 to Railway Mission.
ÖBB and SBB extended their passenger rail cooperation to 2036, covering more than 30 daily direct services and six night train routes from Zürich. Passenger numbers on the joint services have grown strongly over the past decade, alongside ÖBB’s rollout of new Siemens-built Nightjet trains.
Azerbaijan Railways signed a contract with CRRC Zhuzhou Locomotive to buy four new passenger trains.
Singapore and Malaysia conducted a joint exercise simulating a fire on a stranded Johor Bahru-Singapore RTS Link train. The drill tested firefighting, triage, casualty evacuation, and cross-border command and communication ahead of passenger operations targeted for February 2027.
India approved a proposed 1,500-km North Bullet Train Corridor from Delhi to Guwahati, with stops including Agra, Kanpur, Lucknow, Varanasi, Patna and Siliguri. Detailed alignment, stations, schedule and financing are not yet set. The government said the programme will emphasize Make in India and lower fares than air travel.
UIC lists an Executive Board meeting on 3 Dec 2026, scheduled from 11:30 to 13:30.
ZSSK plans to invest €43.9 million in six battery-electric shunting locomotives for Bratislava and Žilina, with delivery planned by end-2030. Slovakia’s finance ministry recommends battery traction over diesel on lifecycle-cost grounds, ahead of ETCS-only operation on key corridors from 2031.
Ukraine’s ministry, Ukrzaliznytsia and the PPP Agency signed a memorandum to prepare two railway projects in Zakarpattia: a 1,435 mm standard-gauge electrified line from Uzhhorod to the state border via Pavlovo, and modernisation of the Korolevo–Khust route. The work will be supported by the World Bank PREPARE programme.