Danish State Railways awarded ELL a EUR 26.35 million lease contract for up to 12 Siemens Vectron AC locomotives for regional and long-distance passenger services. The contract includes maintenance, spare parts and availability support, with initial entry into service expected from December 2026.
Everything we read, routed to your cluster
MRT Corp awarded a RM2.69 billion civil main contract to a CCCC-TRC Construction-Ufuk Semarak joint venture for the Penang LRT Mutiara Line cross-sea extension from Macallum to Penang Sentral. The 5.5km package includes a 3.05km bridge and is targeted for completion by December 2031.
UIC said it will participate in COP31 to promote rail’s role in climate action, focusing on carbon-credit methodologies and including rail in national adaptation planning. It also highlighted the MoveCredits Coalition and joint work with UITP and Alstom on rail and public transport climate finance and resilience.
TRC Synergy’s JV CCCC-TRC-UFUK accepted a RM2.69 billion contract from MRT Mutiara Sdn Bhd for Penang LRT Mutiara Line Package CMC2. The five-year scope covers a sea crossing viaduct with navigation spans, an elevated station, and associated works from Macallum to Penang Sentral.
The Transport Minister said the East Coast Rail Link is projected to generate RM418 million in operating revenue from passenger and cargo services by 2029.
Network Rail has appointed Hawkins\Brown, working with 5th Studio, to lead a masterplan for Oxford station. The plan will assess new entrances, improved onward travel links and capacity upgrades as passenger numbers rise, driven partly by East West Rail and other service increases.
Avanti West Coast has released tickets through the new year and is advising customers to book Christmas travel early for the best fares. Peak restrictions will be lifted from 18 December to 3 January. Planned engineering work on the West Coast Main Line includes a five-day closure of Birmingham New Street.
Porterbrook and GB Railfreight have signed a deal for 56 new MWA box wagons to be built by WH Davis in Nottinghamshire. The first wagon is due for completion by September 2027, and the wagons will carry recycled material to 7Steel’s Cardiff site.
Hitachi Rail signed a contract to supply railway signalling systems for the T26 tunnel and Bilecik depot on Turkey’s Ankara–Istanbul line.
Porterbrook will supply 56 new box wagons to GB Railfreight, with the wagons built by WH Davis in Nottinghamshire. The fleet is due to start completion in September 2027 and will be used to move recycled material to 7Steel’s Cardiff site for UK steel production.
VIA Rail will provide free train travel for young patients and families to six children’s hospitals in Ontario and Quebec under a three-year partnership with Canada’s Children’s Hospital Foundations. The program builds on a similar London, Ontario collaboration launched in April 2026.
British Transport Police released an image and appealed for information after a fight involving three people and weapons at Worthing station in West Sussex on 11 October 2026. Two men, aged 18 and 22, have been arrested and charged.
FS Logistix ordered six more CZ LOKO EffiShunter 1000 diesel-electric locomotives for Mercitalia Shunting & Terminal. The four-axle Class D744 units will be used for shunting at ports and terminals, freight on non-electrified lines, and rescue duties. The group already operates earlier EffiShunter orders.
British Transport Police have released a CCTV image after a racially aggravated assault at Harold Wood station in East London on 9 October. The victim was abused on the platform and later followed outside the station, where they were hit and kicked. Police are asking for information.
An opinion piece says the ECRL is nearing a defining moment in Malaysia, with passenger service due to start on 12 December 2026. It highlights expected travel-time savings, dynamic fare pricing, concessions and the importance of first- and last-mile connectivity around stations.
VIA Rail Canada completed the modernisation of its Toronto Maintenance Centre, funded by a US$310 million Government of Canada investment. The upgraded facility supports maintenance of VIA Rail’s new Corridor fleet of 32 bidirectional trainsets and existing equipment, with expanded bays, heavy-maintenance tools and a new vehicle monitoring system.
Siemens Mobility launched Tech Experience Launchpad, a UK work-experience programme for 11–16-year-olds that will offer more than 3,300 opportunities a year and 10,000 over three years. The initiative coincided with the opening of Siemens’s £100 million Rail Technology Centre in Chippenham and supports UK rail skills development.
Transport for London has launched Operation Vector, an intelligence-led enforcement initiative with British Transport Police to target persistent fare evaders across London. In the first month, officers stopped more than 467 people, issued 156 penalty fares and made 24 arrests. TfL aims to cut fare evasion below 1.5% by 2030/31.
The Merchant Navy Locomotive Preservation Society has formally taken ownership of steam locomotive 35025 Brocklebank Line. The group is assessing required restoration work, available parts and storage plans, with major components still needed for a future mainline return.
Alstom says the new-generation TGV M, based on its Avelia Horizon platform, has entered commercial service in France on SNCF’s Paris–Marseille route. The train offers higher capacity, lower energy use and predictive maintenance features, and is the first operational reference for the platform.