African rail updates include a EUR 355 million Wabtec support agreement for Transnet locomotives, TAZARA’s five-year recovery plan, Ghana opening Tema–Mpakadan to private freight operators, TransNamib revising fleet renewal plans, and Algeria inviting bids for a 310 km railway section.
Everything we read, routed to your cluster
Renfe named Siemens Mobility the winner of a tender for up to 40 high-speed trains in Spain, with a rendering shown of the Velaro Novo design.
Amtrak has launched its Winter Wanderlust sale, offering up to 30% off fares on U.S. routes for travel between 1 December 2026 and 14 March 2027. The sale runs until 12 November and applies to Coach and Acela Business Class bookings.
Transport for Wales has proposed a Swansea Bay and West Wales Metro with new stations, extra services, a new platform at Swansea, track links and signalling-related enabling works. Phase A and Phase B plans are open for public feedback until 13 December 2026, with funding still to be secured.
UIC and UIRR will present the 2026 Combined Transport report, covering freight market shifts, infrastructure constraints and evolving European policies.
Siemens Mobility will supply three Pioneer 220 high-speed trains for California under a USD 772.1 million contract, with options included.
UIC lists the 27th Africa Regional Assembly on 2 December 2026, from 15:00 to 17:00.
UIC lists an online WG3 Retail & Commercial Affairs meeting. No agenda or technical details are provided in the text.
Transport for Greater Manchester will start redeveloping Bury Interchange later this month in two phases. The first phase includes a new footbridge, lift access to Metrolink platforms, platform resurfacing, canopy replacement, and upgrades to lighting, signage, CCTV, passenger information displays and ticketing facilities.
Maersk is launching a twice-weekly intermodal rail service between Haparanda on the Swedish-Finnish border and APM Terminals Gothenburg, with plans to increase frequency to six round trips per week. The electric rail link will move containerised freight from northern Sweden and Finland to Gothenburg for onward ocean connections, including Asia.
A Southco guide explains monitor mounts, torque control methods, and selection factors such as weight, vibration, safety factor, and end-use environment for applications including kiosks, vehicles, and industrial equipment.
UIC WG1 Station & Urban Design meeting will be held online on 1 December 2026.
Summer Suites is a freehold serviced apartment project in Johor Bahru by Connoisseur Properties, about 850m from JB CIQ and the future Bukit Chagar RTS Station. The 44-storey tower has 748 units, smart-home features and more than 20 facilities, with completion targeted for 2029.
Pune Metro Line 3, a 23.2-km PPP corridor linking Hinjawadi and Shivajinagar, opened on 3 November as the first metro project under India’s 2017 New Metro Rail Policy. Siemens supplied systems integration, CBTC, electrification and depot equipment; Alstom supplied 22 three-car trainsets.
BBG Infrastructure won a ₹137.93 crore DMRC contract to design and construct seven elevated metro stations and a foot overbridge for Delhi Metro Phase 4. The tender had two bidders, but only BBG qualified technically. The work period is 660 days.
UIC will hold an online New Technologies Working Group Meeting on 24 Nov 2026 from 14:00 to 17:00.
EAO will host a webinar on 12 November 2026 to review product innovations shown at InnoTrans 2026, including a third-generation Series 56 push button, a Universal Sound Module, charging solutions, Seat Reservation System updates, touchless operation and LED indicator strips.
Renfe has awarded Siemens a contract for 30 seven-car Velaro Novo high-speed trains. The trains will run up to 350 km/h, seat 520 passengers each, and be delivered over 62 months, with the first five due within 40 months.
Parsons, with Systra and Egis in the RMTC joint venture, has been awarded project and construction management services for the Riyadh Metro Red Line Extension in Saudi Arabia. The 8.4-km extension will add five stations and connect King Saud University to Diriyah South.
UIC lists a Regional Chair Meeting on 3 Dec 2026 from 09:30 to 10:30. No further agenda or location details are provided in the text.
Wabtec has reached 1,000 locomotives built at its Contagem plant in Brazil. Vale ordered 50 Evolution Series locomotives in 2025, and Wabtec also signed a USD 254 million deal with MRS Logística in September 2026 for locomotives, spare parts and maintenance through 2032. Some units are exported to Australia and Uruguay.
SYSTRA, as part of the RMTC joint venture led by Parsons, has been awarded PMCM consultancy for the Riyadh Metro Red Line extension in Saudi Arabia. The project will add 5.4 km, eight stations, mostly underground tunnels, and connect Diriyah to the wider network.
Prime Minister Narendra Modi inaugurated Pune Metro Line 3 (23 km) and laid the foundation stone for Pune Metro Phase-II projects worth about ₹13,500 crore. The new phase covers four corridors: Lines 2A, 2B, 4 and 4A, aimed at expanding metro connectivity across Pune.
UIC reported that GCU Joint Committee members and rail freight experts met in Mainz on 29 October 2026 for a workshop on the future of the GCU, focusing on contract application, governance, organisation and digitalisation. The work will continue into concrete next steps.
Freightliner has introduced a new logo after CMA CGM completed its acquisition of the UK intermodal business on 29 January 2026. The deal covered rail and road operations, inland terminals and the Freightliner brand, while heavy haul, Rotterdam Rail Feeding, and operations in Poland and Germany were excluded.