MRT Corp awarded a RM2.69 billion civil main contract to a CCCC-TRC Construction-Ufuk Semarak joint venture for the Penang LRT Mutiara Line cross-sea extension from Macallum to Penang Sentral. The 5.5km package includes a 3.05km bridge and is targeted for completion by December 2031.
Everything we read, routed to your cluster
MRT Corp awarded the RM2.69 billion Civil Main Contract 2 for the Penang LRT Mutiara Line. The package covers a 5.5km extension from Macallum to Penang Sentral, including a 3.05km sea-crossing bridge. The project is under construction and reported 16% complete.
MRT Corp has awarded a RM2.69 billion civil main contract to a JV of CCCC, TRC Construction and Ufuk Semarak for the Penang LRT Mutiara Line cross-sea extension. The 5.5km package includes a 3.05km sea bridge linking Macallum on Penang Island to Penang Sentral in Seberang Perai.
Severn Valley Railway will host Class 55 Deltic D9015 Tulyar from 13 to 16 May 2027 during its Spring Diesel Festival, marking 40 years since the line’s first diesel gala. The locomotive returned to passenger service in 2026 after a 30-year restoration.
Robin Hood Line Community Partnership published its 2025 annual report, covering community engagement, rail safety education, station adoption, active travel, and local projects on the Nottinghamshire line. It also noted an award-winning Fusion Learning initiative and various community events and school visits.
Indian Railways reported higher coal and overall freight loading in October, CONCOR ordered 12 rakes of container wagons from Golden Rock Workshop, DP World expanded double-stack services from JNPA, and the Rowghat iron ore line was commissioned. A new East-West dedicated freight corridor is under study.
UIC says the ERPC main group meeting in Rome will bring together procurement leaders from across the European rail sector.
Hitachi Rail opened its new Canadian headquarters in Scarborough, Toronto, to serve its signalling and systems business. The company is delivering the Ontario Line and Hazel McCallion Line, and modernizing TTC Line 2 signalling after a $400 million contract award in July.
TRC Synergy said its subsidiary is part of a consortium awarded a RM2.69 billion contract for Penang LRT Mutiara Line Civil Main Contract 2. The 5.5km package includes a 3.05km sea bridge linking Macallum on Penang Island to Penang Sentral in Seberang Perai.
Sydney Metro Southwest has opened passenger services, completing Sydney’s 66 km metro line with 31 stations. Alstom supplied Metropolis trains, Urbalis CBTC signalling and maintenance services for the extension, and also maintains the fleet at Metro Trains Sydney’s Tallawong depot.
The Mutiara Line LRT link from Macallum to Penang Sentral, including a 5.5 km marine bridge across the Penang Strait, is expected to start construction in Q3 2027 after MRT Corp completes tender evaluation this month. Completion is targeted for December 2031.
PKP PLK is considering converting some existing Polish electrified main lines from 3 kV DC to 2×25 kV AC. The programme has two phases through 2045, with consultations planned in November 2026 and a final programme expected by year-end, subject to financing.
The Malaysian government has approved over RM250 million to support ECRL development in Kelantan, including RM30 million for a new bus terminal at Kota Bharu ECRL Station and more than RM200 million for preliminary works on a proposed extension to Rantau Panjang.
Kelantan says the ECRL station at Cherang Tuli, Pasir Puteh, will be supported by industrial, logistics and warehousing development, including a proposed dry port in Bandar Baru Tok Bali, to create jobs and local business opportunities.
Hitachi Rail Spain and Hitachi Rail Turkey signed a contract to supply, install and commission signalling systems on Turkey’s Ankara-Istanbul line at T26 and Bilecik depot. The scope includes interlockings, the Traffic Control Centre, telecommunications expansion, and ETCS Level 1 and 2.
MRT Corp has awarded a RM2.69 billion contract for CMC2, covering design and construction of a 5.5km Penang Mutiara Line extension from Macallum Street to Penang Sentral, including a 3.05km sea-crossing bridge. The 22-station project is 16% complete and is expected to open in 2031.
Network Rail will replace a substandard railway bridge over Agbrigg Road in Wakefield for £5m over the Christmas period. The work will require a line closure between Doncaster and Leeds and road closures near Sandal and Agbrigg station.
At InnoTrans 2026, Vossloh launched new fastening systems for conventional, high-speed and urban rail, and added TrackStability software functions for track-buckling risk. The company also won about EUR 60 million in rail fastening contracts for two high-speed lines in Shandong, China, with deliveries from 2027.
Hitachi Rail signed a contract to supply railway signalling systems for the T26 tunnel and Bilecik depot on Turkey’s Ankara–Istanbul line.
Spain’s transport minister and Adif president resigned after a fatal high-speed collision on the Madrid–Seville line. The line remains closed while investigators examine LZB protection failures and control-centre actions. Spain plans additional safety measures, including second-controller validation, new software, more staff training, and future ERTMS Level 2 installation.
Kelantan plans industrial and logistics development around the ECRL station in Cherang Tuli, Pasir Puteh, including processing industries, warehousing, a logistics hub and a proposed dry port in Bandar Baru Tok Bali. The state also wants supporting roads, distribution centres and last-mile logistics facilities.
Great Northern will double off-peak train frequency between Moorgate and Hertford North from 14 December. Services will run every 15 minutes on weekdays and Saturdays, with faster running into London and limited stops at Bayford and Crews Hill.
Great Northern will increase off-peak services between Moorgate and Hertford North to four trains per hour from 14 December, creating a 15-minute turn-up-and-go frequency at most stations on the route.
Penang’s Mutiara Line LRT Macallum–Penang Sentral alignment, including a 5.5km marine bridge across the Penang Strait, is scheduled to start construction in 3Q2027 after MRT Corp completes tender evaluation this month. The alignment is targeted for completion by December 2031.
Kenya Railways has begun vehicle transport on the Standard Gauge Railway between Mombasa and Nairobi, moving 21 cars on its first service. The operation uses adapted vehicle wagons alongside container trains and is being developed with Autobarn East Africa for about 700 vehicles a month.