BASF InfraService & Solutions Lausitz will haul quartz sand between Hohenbocka and Schwarzheide for Captrain subsidiary RBB using its industrial railway, locomotives and staff. BASF also plans to use spare rail capacity for further third-party freight contracts.
Everything we read, routed to your cluster
Anthony Loke said the East Coast Rail Link (ECRL) is projected to generate RM418 million in operating revenue from passenger and cargo services by 2029.
Schneider National will shift its primary eastern US intermodal rail service from CSX to Norfolk Southern under an agreement announced on 29 October 2026. Freight is expected to move in November 2026, and Norfolk Southern says it has been preparing terminal capacity and track adjustments for the added traffic.
Network Rail has issued travel advice for Manchester Christmas Markets, which open on 6 November 2026 and are expected to draw heavy crowds on Northern and TransPennine Express services. Passengers are advised to plan ahead, use earlier return trains, and expect extra staff at Manchester Piccadilly.
CPKC signed a five-year agreement to increase steelmaking coal shipments from British Columbia to Vancouver export terminals. CN expanded its Vaughan, Ontario fuel terminal to handle more than 15,000 railcars a year. Audi chose a Norfolk Southern-served site in Georgia for a EUR 3.6 billion factory.
East Midlands Railway says the Derwent Valley Line between Derby and Matlock will close from 14 to 22 November 2026 for £3m of Network Rail upgrade works, mainly track renewals at Whatstandwell, Cromford and Matlock Bath. Over 3,500 sleepers and 6,400 tonnes of ballast will be installed.
Renfe named Siemens Mobility the winner of a tender for up to 40 high-speed trains in Spain, with a rendering shown of the Velaro Novo design.
Ports & Rail Week 2026 will be held on 24-25 November 2026 in Durban, South Africa. The event will focus on port and rail infrastructure, intermodal connectivity, green transport, digitalization, AI, automation, PPPs, and safety in African transport corridors.
Renfe has awarded Siemens a contract for 30 seven-car Velaro Novo high-speed trains. The trains will run up to 350 km/h, seat 520 passengers each, and be delivered over 62 months, with the first five due within 40 months.
GMRC has invited bids for the ₹197.14 crore development and construction of the Gyaspur Depot for the Ahmedabad Metro Rail Project in Gujarat. The package covers depot infrastructure, an Operations Control Centre, and associated electrical and mechanical works. Bid submission closes on 20 November 2026.
Network Rail has advised passengers to plan ahead for heavy festive travel in Birmingham. Christmas markets and events are expected to increase use of Birmingham stations, with staff available at New Street, Moor Street and Snow Hill, while some services to New Street will be suspended from 24 to 28 December 2026.
Tracsis says predictive rail asset maintenance is moving from concept to operational use by combining remote condition monitoring data with machine learning. The company is testing a field-deployable predictive platform with selected client partners on busy rail networks to refine model accuracy and reliability.
Hitachi Rail signed a contract to supply railway signalling systems for the T26 tunnel and Bilecik depot on Turkey’s Ankara–Istanbul line.
VIA Rail Canada completed the modernisation of its Toronto Maintenance Centre, funded by a US$310 million Government of Canada investment. The upgraded facility supports maintenance of VIA Rail’s new Corridor fleet of 32 bidirectional trainsets and existing equipment, with expanded bays, heavy-maintenance tools and a new vehicle monitoring system.
ÖBB and SBB extended their passenger rail cooperation to 2036, covering more than 30 daily direct services and six night train routes from Zürich. Passenger numbers on the joint services have grown strongly over the past decade, alongside ÖBB’s rollout of new Siemens-built Nightjet trains.
The European Commission approved €29.3 million in German state aid for a new intermodal freight terminal at Stolberg Hauptbahnhof near Aachen. The terminal, part of the Euregio Railport project, is planned to open in 2035 and handle 740-metre freight trains, supporting rail freight flows to and from Benelux ports.
UIC will hold the 5th Global FRMCS Conference on 24–25 November 2026 in Paris. The event will cover FRMCS technical developments, V3p specifications, large-scale testing under FP2 MORANE 2, and global deployment challenges for next-generation railway communications.
VIA Rail will provide free train travel for young patients and families to six children’s hospitals in Ontario and Quebec under a three-year partnership with Canada’s Children’s Hospital Foundations. The program builds on a similar London, Ontario collaboration launched in April 2026.
Robin Hood Line Community Partnership published its 2025 annual report, covering community engagement, rail safety education, station adoption, active travel, and local projects on the Nottinghamshire line. It also noted an award-winning Fusion Learning initiative and various community events and school visits.
Siemens Mobility launched Tech Experience Launchpad, a UK work-experience programme for 11–16-year-olds that will offer more than 3,300 opportunities a year and 10,000 over three years. The initiative coincided with the opening of Siemens’s £100 million Rail Technology Centre in Chippenham and supports UK rail skills development.
UIC and UIRR will present the 2026 Combined Transport report, covering freight market shifts, infrastructure constraints and evolving European policies.
At InnoTrans 2026 in Berlin, SOGECLAIR TRAINING & SIMULATION presented Oksygen® and LITE, simulation tools for driver and operator training. The platforms use real infrastructure data, digital twins, 2D/3D modelling and portable hardware to support training, assessment and operational readiness.
Indian Railways reported higher coal and overall freight loading in October, CONCOR ordered 12 rakes of container wagons from Golden Rock Workshop, DP World expanded double-stack services from JNPA, and the Rowghat iron ore line was commissioned. A new East-West dedicated freight corridor is under study.
VIA Rail has completed a C$310 million modernization of its Toronto Maintenance Centre, adding expanded heavy-maintenance facilities and a Vehicle Equipment Measurement System for early fault detection. The federally funded project supports VIA’s new Siemens Venture Corridor fleet and existing trains.
UIC has released IRS 30345, a new non-binding standard for procuring new rolling stock with harmonised environmental specifications. It replaces UIC Leaflet 345 and sets guidance on energy use, emissions, noise, air quality, and circularity, including raising component recyclability targets from 85% to 95%.