UIC’s Global Level Crossing Network met in London on 28 October 2026 to share research and measures on level crossing safety, including youth risk perception, pedestrian fatalities, enforcement using drones, and human-factors assessment on low-frequency lines. UIC said a consolidated IRS on level crossing safety will be published by early 2027.
Everything we read, routed to your cluster
UIC Rail Expert Group meeting 2026 will be held on 18–19 November 2026 in Hamburg, Germany, hosted by DB InfraGo.
The article argues that rail emergency exit systems should still function without connectivity or power, citing EU interoperability rules and the IEC RAMS framework. It says physically independent mechanisms can complement digitally enabled systems in trains.
Network Rail completed drainage renewal and related maintenance on the East Coast Main Line in North Yorkshire after two weekend possessions. The programme included 300 metres of drainage at Chapman’s Bridge near Shipton, work on track, power lines and points, vegetation management, and a new bridge at Church Fenton for overhead line preparation.
Ports & Rail Week 2026 will be held on 24-25 November 2026 in Durban, South Africa. The event will focus on port and rail infrastructure, intermodal connectivity, green transport, digitalization, AI, automation, PPPs, and safety in African transport corridors.
At IRSC Lisbon 2026, UIC presented work on safety culture, cyber resilience, risk assessment harmonisation, wayside monitoring, AI for level crossings, and safety management for Portugal’s future Lisbon-Porto high-speed line. The conference highlighted international cooperation on railway safety and innovation.
Hitachi Rail opened a new C$30 million, 125,000-square-foot headquarters and center of excellence for signalling and systems in Toronto, Canada. The facility is intended to support the company’s signalling and systems work in the Canadian market.
Singapore and Malaysia conducted a joint exercise simulating a fire on a stranded Johor Bahru-Singapore RTS Link train. The drill tested firefighting, triage, casualty evacuation, and cross-border command and communication ahead of passenger operations targeted for February 2027.
An incident between Crewe and Stafford blocked the line, disrupting trains with cancellations, diversions and delays of 60 minutes or more until about 3pm on 3 November 2026. Avanti West Coast, CrossCountry, London Northwestern Railway and Lumo services were affected.
UIC said it will participate in COP31 to promote rail’s role in climate action, focusing on carbon-credit methodologies and including rail in national adaptation planning. It also highlighted the MoveCredits Coalition and joint work with UITP and Alstom on rail and public transport climate finance and resilience.
Network Rail will replace the 160-year-old Selhurst railway bridge in London over the Christmas period. The old bridge will be removed using self-propelled modular transporters, and Selhurst Road will be closed from 12 December to 10 January while the station remains open.
East Midlands Railway says the Derwent Valley Line between Derby and Matlock will close from 14 to 22 November 2026 for £3m of Network Rail upgrade works, mainly track renewals at Whatstandwell, Cromford and Matlock Bath. Over 3,500 sleepers and 6,400 tonnes of ballast will be installed.
Indian Railways reported higher coal and overall freight loading in October, CONCOR ordered 12 rakes of container wagons from Golden Rock Workshop, DP World expanded double-stack services from JNPA, and the Rowghat iron ore line was commissioned. A new East-West dedicated freight corridor is under study.
KORAIL won the 2026 UIC Sustainability Impact Awards’ Modal Shift category for its “Love Regional Rail Travel” initiative, which promotes rail tourism with local partners and a 50% fare discount. The programme launched in August 2024 and had about 470,000 passengers by July 2026.
Opinion piece on the East Coast Rail Link (ECRL), saying the project is approaching a defining moment in Malaysia’s infrastructure development and discussing benefits for passengers.
India’s Railway Board granted conditional clearance for a 16-car Vande Bharat Chair Car trainset built by RCF Kapurthala with Alstom propulsion, allowing operation up to 160 km/h subject to technical conditions. The Board raised issues on displays, protection, cabling, equipment mounting and traction motor rating.
UIC describes rail-related climate work under COP action plans on freight modal shift, urban transport, and infrastructure resilience. It cites a new study on National Adaptation Plans showing rail is often mentioned but rarely backed by costs or funding, and says COP31 discussions will address green freight corridors and carbon markets.
Chiltern Railways said it will run over 90% of services on 12 November despite RMT industrial action, with some Birmingham, Stratford-upon-Avon and Leamington Spa services reduced or suspended. The operator also said all East West Rail services will have two staff on board.
Malaysia has approved funding for preliminary work to extend the under-construction East Coast Rail Link by 32km to the Thai border.
The Transport Minister said the East Coast Rail Link is projected to generate RM418 million in operating revenue from passenger and cargo services by 2029.
MCMC is testing internet coverage along the 378km Phase 1 East Coast Rail Link route from Gombak to Kota Baru, including 16 stations and tunnels, ahead of the Dec 12 launch. Maxis, appointed by MRL as the 4G infrastructure provider, has presented its implementation plan.
Hitachi Rail marked the opening of the first operational section of Chennai Metro Phase II, a 15 km, 11-station elevated corridor powered by its CBTC signalling for GoA4 driverless operation. The wider Phase II signalling contract, awarded in 2023, covers 119 km of metro lines.
The California High-Speed Rail Authority approved Siemens’ contract to supply three AP220 high-speed trainsets, spare parts and 10 years of maintenance. The deal is worth USD 772.1 million, with options for up to 19 more trainsets. Initial manufacture and testing will be in Germany, with California testing planned from 2030.
At InnoTrans 2026, Vossloh launched new fastening systems for conventional, high-speed and urban rail, and added TrackStability software functions for track-buckling risk. The company also won about EUR 60 million in rail fastening contracts for two high-speed lines in Shandong, China, with deliveries from 2027.
Network Rail completed nine days of work to renew and strengthen Saxmundham junction on East Suffolk Line, converting it from manual to powered operation and upgrading signalling and infrastructure. The improvements support increased freight traffic to the Sizewell C construction site and resumed Greater Anglia services between Halesworth and Ipswich.