Ports & Rail Week 2026 will be held on 24-25 November 2026 in Durban, South Africa. The event will focus on port and rail infrastructure, intermodal connectivity, green transport, digitalization, AI, automation, PPPs, and safety in African transport corridors.
Everything we read, routed to your cluster
Singapore will expand the Singapore Rail Academy’s role from November with standardised training, wider eligibility, and new certification pathways for engineers, technicians and operations staff. The changes, developed with LTA and rail operators, are meant to support MRT network expansion, upgrades and future technology adoption.
Siemens Mobility launched Tech Experience Launchpad, a UK work-experience programme for 11–16-year-olds that will offer more than 3,300 opportunities a year and 10,000 over three years. The initiative coincided with the opening of Siemens’s £100 million Rail Technology Centre in Chippenham and supports UK rail skills development.
Renfe named Siemens Mobility the winner of a tender for up to 40 high-speed trains in Spain, with a rendering shown of the Velaro Novo design.
ÖBB and SBB have extended their partnership to 2036 to continue daytime long-distance and joint night train services between Austria and Switzerland, including routes linking Vienna, Zurich, Innsbruck, Salzburg and other European cities. The companies say cross-border passenger numbers have grown over the past decade.
UK Railtours will run December trips in East Anglia, London and Kent using paired Class 37 locomotives. Swietelsky and Europhoenix will provide traction, RailAdventure will operate the locomotives, and Eastern Rail Services will provide Mark 2 coaches. Tickets are available through the UK Railtours website.
Renfe has awarded Siemens a contract for 30 seven-car Velaro Novo high-speed trains. The trains will run up to 350 km/h, seat 520 passengers each, and be delivered over 62 months, with the first five due within 40 months.
Alstom announced the first ETCS Level 2 passenger service in Romania, using a Traxx Passenger electric locomotive and ETCS Level 2 trackside infrastructure between Buftea and Brazi on the Bucharest–Budapest line. The service began after the locomotives entered passenger operation in September 2026.
Robin Hood Line Community Partnership published its 2025 annual report, covering community engagement, rail safety education, station adoption, active travel, and local projects on the Nottinghamshire line. It also noted an award-winning Fusion Learning initiative and various community events and school visits.
Eurostar appointed Christophe Fanichet, former CEO of SNCF Voyageurs, as its new CEO. He will oversee a EUR 2 billion fleet investment programme, including up to 50 Alstom double-decker high-speed trains under the Celestia programme, with first service expected in May 2031.
African rail updates include a EUR 355 million Wabtec support agreement for Transnet locomotives, TAZARA’s five-year recovery plan, Ghana opening Tema–Mpakadan to private freight operators, TransNamib revising fleet renewal plans, and Algeria inviting bids for a 310 km railway section.
VIA Rail Canada completed the modernisation of its Toronto Maintenance Centre, funded by a US$310 million Government of Canada investment. The upgraded facility supports maintenance of VIA Rail’s new Corridor fleet of 32 bidirectional trainsets and existing equipment, with expanded bays, heavy-maintenance tools and a new vehicle monitoring system.
Hitachi Rail opened its new Canadian headquarters in Scarborough, Toronto, to serve its signalling and systems business. The company is delivering the Ontario Line and Hazel McCallion Line, and modernizing TTC Line 2 signalling after a $400 million contract award in July.
Siemens Mobility will supply three Pioneer 220 high-speed trains for California under a USD 772.1 million contract, with options included.
Transport for Wales has opened consultation on Swansea Bay Metro proposals, including a possible new Cockett station, a reopened platform at Swansea, and more frequent services between Swansea, Pembrey & Burry Port, and possibly Ammanford via Neath. Comments are open until 13 December 2026.
Modal Group and Dunkerque-Port opened a EUR 25 million intermodal terminal at Loon-Plage in Dunkirk, with four 750-metre rail tracks and services to Lyon. The terminal handles containers, semi-trailers and swap bodies, and a Lyon–Piacenza extension is planned for 2027.
UIC will hold its 9th Zero Waste Workshop in Paris and online on 19 January 2027 on critical raw materials and rail resilience. The event will discuss rail supply-chain dependencies, circular economy approaches, and draft EU Agency for Railways findings on circular economy in rail.
Alstom says the new-generation TGV, known in France as TGV M, has entered commercial service. It is the first train based on Alstom's Avelia Horizon very high-speed platform and builds on the company's long history in high-speed rail.
Freightliner has introduced a new logo after CMA CGM completed its acquisition of the UK intermodal business on 29 January 2026. The deal covered rail and road operations, inland terminals and the Freightliner brand, while heavy haul, Rotterdam Rail Feeding, and operations in Poland and Germany were excluded.
Trafikverket outlined Sweden’s winter rail maintenance setup for 14,400 km of track, including 32 maintenance contracts, 3,200 workers, 960 vehicles, heated switches, snow-melting machines and new hot-air de-icing systems. Contractors must respond within 60 to 120 minutes depending on time and route.
MCMC is testing internet coverage along the 378km Phase 1 East Coast Rail Link route from Gombak to Kota Baru, including 16 stations and tunnels, ahead of the Dec 12 launch. Maxis, appointed by MRL as the 4G infrastructure provider, has presented its implementation plan.
Hitachi Rail marked the opening of the first operational section of Chennai Metro Phase II, a 15 km, 11-station elevated corridor powered by its CBTC signalling for GoA4 driverless operation. The wider Phase II signalling contract, awarded in 2023, covers 119 km of metro lines.
Malaysia has approved funding for preliminary work to extend the under-construction East Coast Rail Link by 32km to the Thai border.
At InnoTrans 2026 in Berlin, SOGECLAIR TRAINING & SIMULATION presented Oksygen® and LITE, simulation tools for driver and operator training. The platforms use real infrastructure data, digital twins, 2D/3D modelling and portable hardware to support training, assessment and operational readiness.
Chiltern Railways said it will run over 90% of services on 12 November despite RMT industrial action, with some Birmingham, Stratford-upon-Avon and Leamington Spa services reduced or suspended. The operator also said all East West Rail services will have two staff on board.