Hitachi Rail Spain and Hitachi Rail Turkey signed a contract to supply, install and commission signalling systems on Turkey’s Ankara-Istanbul line at T26 and Bilecik depot. The scope includes interlockings, the Traffic Control Centre, telecommunications expansion, and ETCS Level 1 and 2.
Everything we read, routed to your cluster
At InnoTrans 2026, Vossloh launched new fastening systems for conventional, high-speed and urban rail, and added TrackStability software functions for track-buckling risk. The company also won about EUR 60 million in rail fastening contracts for two high-speed lines in Shandong, China, with deliveries from 2027.
Network Rail will spend £1.75m to renew 1,300 metres of track, sleepers and ballast on a bridge between Rishton and Accrington in East Lancashire. The East Lancashire line will close on 22, 28 and 29 November, with rail replacement buses operating during the work.
Hitachi Rail signed a contract to supply railway signalling systems for the T26 tunnel and Bilecik depot on Turkey’s Ankara–Istanbul line.
Alstom announced the first ETCS Level 2 passenger service in Romania, using a Traxx Passenger electric locomotive and ETCS Level 2 trackside infrastructure between Buftea and Brazi on the Bucharest–Budapest line. The service began after the locomotives entered passenger operation in September 2026.
Hitachi Rail opened its new Canadian headquarters in Scarborough, Toronto, to serve its signalling and systems business. The company is delivering the Ontario Line and Hazel McCallion Line, and modernizing TTC Line 2 signalling after a $400 million contract award in July.
KORAIL won the 2026 UIC Sustainability Impact Awards’ Modal Shift category for its “Love Regional Rail Travel” initiative, which promotes rail tourism with local partners and a 50% fare discount. The programme launched in August 2024 and had about 470,000 passengers by July 2026.
UIC held a webinar on 3 November 2026 on rail’s role in suicide prevention, covering effective interventions, means restriction, staff training, data sharing and new technologies such as fencing, lighting, CCTV and real-time track intrusion alerts.
Ports & Rail Week 2026 will be held on 24-25 November 2026 in Durban, South Africa. The event will focus on port and rail infrastructure, intermodal connectivity, green transport, digitalization, AI, automation, PPPs, and safety in African transport corridors.
UIC Rail Expert Group meeting 2026 will be held on 18–19 November 2026 in Hamburg, Germany, hosted by DB InfraGo.
Spain’s transport minister and Adif president resigned after a fatal high-speed collision on the Madrid–Seville line. The line remains closed while investigators examine LZB protection failures and control-centre actions. Spain plans additional safety measures, including second-controller validation, new software, more staff training, and future ERTMS Level 2 installation.
A collision near Urda on Spain’s Madrid–Seville high-speed line is under investigation after an LZB control failure and an alleged decision to let one train resume normal running. The line remains closed while Renfe runs replacement services.
The Northampton and Lamport Railway will run its Winter Warmer event on 3 January 2027, with two steam locomotives in service and Bagnall No. 2 making its last operating day before leaving the railway.
VIA Rail Canada completed the modernisation of its Toronto Maintenance Centre, funded by a US$310 million Government of Canada investment. The upgraded facility supports maintenance of VIA Rail’s new Corridor fleet of 32 bidirectional trainsets and existing equipment, with expanded bays, heavy-maintenance tools and a new vehicle monitoring system.
UIC Rail System Forum held a plenary in Paris on 22 October 2026 to update its governance and work programme. Members agreed to a new architecture from 2027, with greater focus on rolling stock and energy strategies, stronger safety integration, and more member-driven priorities.
The article says ETCS timeline changes should be managed through connected asset data, scenario planning and workbank updates so infrastructure, fleet and renewal plans stay aligned. It argues that planning tools can help identify affected assets, compare sequencing options and track assumptions as delivery milestones move.
British rail staff assaults rose 12% to 11,289 in 2025-26, with many incidents linked to late shifts. The article says operators can reduce risk through roster planning, station lighting, CCTV, body cameras, safe spaces and stronger incident reporting and follow-up.
Bala Lake Railway in North Wales will run two Santa steam trains on 12–13 December 2026. Pre-booked passengers will travel from Llanwchllyn to Bala Pen-y-Bont and visit Santa’s Grotto; children receive gifts and adults get a hot drink or cherry.
The Vale of Rheidol Railway has completed its acquisition of the Brecon Mountain Railway in Wales. The two heritage narrow-gauge railways will keep their separate identities and locomotive fleets, while sharing engineering knowledge, maintenance, restoration work and facilities at Aberystwyth.
The Watercress Line in Hampshire will run Steam Illuminations from 27 November 2026 to 2 January 2027, featuring a steam train with synchronised LED lights, music, interactive activities, and festive station attractions.
Weardale Railway in County Durham will host steam locomotive Flying Scotsman from 13 to 15 November, with scheduled arrivals at Stanhope station, paid viewing areas at five stations, and safety restrictions around platforms and footbridges.
Malaysia has approved funding for preliminary work to extend the under-construction East Coast Rail Link by 32km to the Thai border.
Tracsis says predictive rail asset maintenance is moving from concept to operational use by combining remote condition monitoring data with machine learning. The company is testing a field-deployable predictive platform with selected client partners on busy rail networks to refine model accuracy and reliability.
Trafikverket outlined Sweden’s winter rail maintenance setup for 14,400 km of track, including 32 maintenance contracts, 3,200 workers, 960 vehicles, heated switches, snow-melting machines and new hot-air de-icing systems. Contractors must respond within 60 to 120 minutes depending on time and route.
Network Rail will replace the 160-year-old Selhurst railway bridge in London over the Christmas period. The old bridge will be removed using self-propelled modular transporters, and Selhurst Road will be closed from 12 December to 10 January while the station remains open.