Amorim Cork Solutions supplied under ballast mats for a railway infrastructure project in Pampilhosa do Botão, Portugal, to help control vibration in a track transition zone beside a bridge. The mats were selected for their elastic support and ability to reduce vibration transmission under repeated train loading.
Everything we read, routed to your cluster
Renfe named Siemens Mobility the winner of a tender for up to 40 high-speed trains in Spain, with a rendering shown of the Velaro Novo design.
Transport for London has launched Operation Vector, an intelligence-led enforcement initiative with British Transport Police to target persistent fare evaders across London. In the first month, officers stopped more than 467 people, issued 156 penalty fares and made 24 arrests. TfL aims to cut fare evasion below 1.5% by 2030/31.
ÖBB and SBB extended their passenger rail cooperation to 2036, covering more than 30 daily direct services and six night train routes from Zürich. Passenger numbers on the joint services have grown strongly over the past decade, alongside ÖBB’s rollout of new Siemens-built Nightjet trains.
Holmatro says it has developed and supplied rerailing hydraulic systems for trains, metros and trams over the past decade, with deployments in countries including the Netherlands, Australia, the United States, Spain, China and Thailand. It highlights lighter aluminum components, remote control, and safety features for faster recovery after derailments.
TRC Synergy said its subsidiary has a 30% interest in a joint venture awarded the RM2.69 billion Penang LRT CMC2 package. The five-year contract covers design and construction of a 5.5km sea-crossing viaduct, a navigation span, an elevated station and related works for the Mutiara Line.
Ares has agreed to acquire Infinity Transportation, a US railcar leasing business with about 50,000 railcars leased to more than 350 customers across the US, Canada and Mexico, for about $2.9 billion. Completion is expected in Q1 2027, subject to approvals.
Berlin-based Rail Unit received a Stadler EuroDual and an Alstom TRAXX MS3 in October 2026 as it expands from railway personnel services into its own freight operations in Germany. The locomotives were leased from European Loc Pool and Northrail, following the company’s railway undertaking licence and safety certification.
Robin Hood Line Community Partnership published its 2025 annual report, covering community engagement, rail safety education, station adoption, active travel, and local projects on the Nottinghamshire line. It also noted an award-winning Fusion Learning initiative and various community events and school visits.
Trafikverket outlined Sweden’s winter rail maintenance setup for 14,400 km of track, including 32 maintenance contracts, 3,200 workers, 960 vehicles, heated switches, snow-melting machines and new hot-air de-icing systems. Contractors must respond within 60 to 120 minutes depending on time and route.
Renfe has awarded Siemens a contract for 30 seven-car Velaro Novo high-speed trains. The trains will run up to 350 km/h, seat 520 passengers each, and be delivered over 62 months, with the first five due within 40 months.
Singapore will revamp its Rail Academy from November, partnering five educational institutions and consolidating training from LTA, SMRT and SBS Transit into a common curriculum. The scheme will create clearer pathways for rail workers to earn formal diplomas, degrees and new sector certifications, with WSQ certification starting in early 2027.
Siemens Mobility launched Tech Experience Launchpad, a UK work-experience programme for 11–16-year-olds that will offer more than 3,300 opportunities a year and 10,000 over three years. The initiative coincided with the opening of Siemens’s £100 million Rail Technology Centre in Chippenham and supports UK rail skills development.
A collision near Urda on Spain’s Madrid–Seville high-speed line is under investigation after an LZB control failure and an alleged decision to let one train resume normal running. The line remains closed while Renfe runs replacement services.
Transport for Greater Manchester will start redeveloping Bury Interchange later this month in two phases. The first phase includes a new footbridge, lift access to Metrolink platforms, platform resurfacing, canopy replacement, and upgrades to lighting, signage, CCTV, passenger information displays and ticketing facilities.
The Transport Minister said the East Coast Rail Link is projected to generate RM418 million in operating revenue from passenger and cargo services by 2029.
Premium PSU will present its full auxiliary and services power conversion range for rolling stock at InnoTrans 2026 in Berlin, including AC/DC supplies, DC/DC converters, inverters, VFDs and DC-UPS. The products are engineered to EN 50155 and related railway standards and built in Barcelona.
TRC Synergy said its subsidiary is part of a consortium awarded a RM2.69 billion contract for Penang LRT Mutiara Line Civil Main Contract 2. The 5.5km package includes a 3.05km sea bridge linking Macallum on Penang Island to Penang Sentral in Seberang Perai.
Anthony Loke said ECRL is projected to generate RM418 million in revenue by 2029, with cargo services contributing 70% and passenger services 30%.
MRT Corp has awarded a RM2.69 billion civil main contract to a JV of CCCC, TRC Construction and Ufuk Semarak for the Penang LRT Mutiara Line cross-sea extension. The 5.5km package includes a 3.05km sea bridge linking Macallum on Penang Island to Penang Sentral in Seberang Perai.
Siemens Mobility will supply three Pioneer 220 high-speed trains for California under a USD 772.1 million contract, with options included.
Finland will donate ten operational former VR Dv12 diesel locomotives and spare parts to Ukrzaliznytsia. The agreement was signed in Kyiv on 22 October 2026, and the locomotives were due for decommissioning but remain operational. Ukraine says it has lost nearly 600 locomotives since Russia’s full-scale invasion.
Malaysia and Singapore held a joint emergency response exercise for the Johor Bahru-Singapore RTS Link on 27–28 October 2026 at RTS Wadi Hana Depot. The drill tested firefighting, medical triage, casualty evacuation, and cross-border coordination by agencies from both countries ahead of passenger service start.
Ukraine’s ministry, Ukrzaliznytsia and the PPP Agency signed a memorandum to prepare two railway projects in Zakarpattia: a 1,435 mm standard-gauge electrified line from Uzhhorod to the state border via Pavlovo, and modernisation of the Korolevo–Khust route. The work will be supported by the World Bank PREPARE programme.
BBG Infrastructure won a ₹137.93 crore DMRC contract to design and construct seven elevated metro stations and a foot overbridge for Delhi Metro Phase 4. The tender had two bidders, but only BBG qualified technically. The work period is 660 days.