An incident between Crewe and Stafford blocked the line, disrupting trains with cancellations, diversions and delays of 60 minutes or more until about 3pm on 3 November 2026. Avanti West Coast, CrossCountry, London Northwestern Railway and Lumo services were affected.
Everything we read, routed to your cluster
Berlin-based Rail Unit received a Stadler EuroDual and an Alstom TRAXX MS3 in October 2026 as it expands from railway personnel services into its own freight operations in Germany. The locomotives were leased from European Loc Pool and Northrail, following the company’s railway undertaking licence and safety certification.
BASF InfraService & Solutions Lausitz will haul quartz sand between Hohenbocka and Schwarzheide for Captrain subsidiary RBB using its industrial railway, locomotives and staff. BASF also plans to use spare rail capacity for further third-party freight contracts.
India’s first indigenous bullet trainset, B28, is taking shape at BEML’s Bengaluru facility for the Mumbai–Ahmedabad High-Speed Rail corridor. The train is designed for a maximum test speed of 280 km/h, with rollout expected by end-2026 or early 2027 and a tentative inaugural run on the Surat–Vapi section in August 2027.
GB Railfreight has appointed Jude Winstanley as CEO from 2 November 2026. John Smith will stay on in an advisory role on UK rail reform. The company says it continues investing in locomotives, maintenance facilities and depots, including Class 99 bi-mode locomotives.
India’s Railway Board granted conditional clearance for a 16-car Vande Bharat Chair Car trainset built by RCF Kapurthala with Alstom propulsion, allowing operation up to 160 km/h subject to technical conditions. The Board raised issues on displays, protection, cabling, equipment mounting and traction motor rating.
Indian Railways reported higher coal and overall freight loading in October, CONCOR ordered 12 rakes of container wagons from Golden Rock Workshop, DP World expanded double-stack services from JNPA, and the Rowghat iron ore line was commissioned. A new East-West dedicated freight corridor is under study.
Alstom announced the first ETCS Level 2 passenger service in Romania, using a Traxx Passenger electric locomotive and ETCS Level 2 trackside infrastructure between Buftea and Brazi on the Bucharest–Budapest line. The service began after the locomotives entered passenger operation in September 2026.
Spanish infrastructure manager Adif has awarded the operation of the Vitoria-Jundiz intermodal terminal to Terminal Intermodal Jundiz, a consortium led by Medlog Spain Logistic with port and regional partners. The terminal covers 55,000 m² and is expected to grow from 4,723 ITUs in 2025 to 60,000 annually from year three.
Kent’s Romney, Hythe and Dymchurch Railway says it will mark its 100th anniversary in 2027 with galas, a golden ticket competition, and the return of locomotives Typhoon, Hurricane and the Armoured Wagon.
Danish State Railways awarded ELL a EUR 26.35 million lease contract for up to 12 Siemens Vectron AC locomotives for regional and long-distance passenger services. The contract includes maintenance, spare parts and availability support, with initial entry into service expected from December 2026.
ČD has launched a tender to sell six Taurus locomotives, offered individually or as a package with spare parts. The three-system units were built in 2007–2011, reach 230 km/h, and are approved for several Central European countries; two have ETCS, while two have Polish SHP equipment.
UK Railtours will run December trips in East Anglia, London and Kent using paired Class 37 locomotives. Swietelsky and Europhoenix will provide traction, RailAdventure will operate the locomotives, and Eastern Rail Services will provide Mark 2 coaches. Tickets are available through the UK Railtours website.
Northern is supporting the Poppy Express on trains in Yorkshire, with volunteers selling poppies to raise funds for the Royal British Legion ahead of Remembrance Day. Free travel is also being offered to veterans and military personnel for remembrance services on 8 November.
CRRC Dalian and Temoinsa won an order in Chile for four CDA3 diesel locomotives. The locomotives have a maximum speed of 120 km/h, are intended for routine infrastructure maintenance, and will replace ageing equipment. First delivery is expected in about 18 months.
African rail updates include a EUR 355 million Wabtec support agreement for Transnet locomotives, TAZARA’s five-year recovery plan, Ghana opening Tema–Mpakadan to private freight operators, TransNamib revising fleet renewal plans, and Algeria inviting bids for a 310 km railway section.
Bachmann Europe announced its winter 2026 model railway releases, led by an OO-scale exclusive of LNER A2 No. 60532 Blue Peter in Express Blue. The range also includes new N and OO scale locomotives, wagons, coaches, buildings and accessories.
Chiltern Railways said it will run over 90% of services on 12 November despite RMT industrial action, with some Birmingham, Stratford-upon-Avon and Leamington Spa services reduced or suspended. The operator also said all East West Rail services will have two staff on board.
GBR Anglia is offering free return travel for veterans and serving military personnel attending Remembrance services on 7–8 November on c2c and Greater Anglia, with similar support from London Northwestern Railway. The offer also now includes one immediate bereaved family member, using proof of eligibility and a complimentary ticket process.
The European Commission approved €29.3 million in German state aid for a new intermodal freight terminal at Stolberg Hauptbahnhof near Aachen. The terminal, part of the Euregio Railport project, is planned to open in 2035 and handle 740-metre freight trains, supporting rail freight flows to and from Benelux ports.
Stadler has started construction of a new commissioning facility in Weinfelden, Switzerland, to relieve capacity constraints at its Erlen site. The EUR 44 million project includes indoor and outdoor test tracks, final assembly areas and technical space. Operations are expected to begin in the first half of 2028.
GMRC has invited bids for the ₹197.14 crore development and construction of the Gyaspur Depot for the Ahmedabad Metro Rail Project in Gujarat. The package covers depot infrastructure, an Operations Control Centre, and associated electrical and mechanical works. Bid submission closes on 20 November 2026.
A Scottish fatal accident inquiry found that an off-design drain, missing as-built records, and maintenance and weather-management gaps contributed to the 2020 Carmont derailment. The inquiry said building the drain to its approved design might realistically have prevented the crash. No new recommendations were made.
Pune Metro Line 3, a 23.2-km PPP corridor linking Hinjawadi and Shivajinagar, opened on 3 November as the first metro project under India’s 2017 New Metro Rail Policy. Siemens supplied systems integration, CBTC, electrification and depot equipment; Alstom supplied 22 three-car trainsets.
Hitachi Rail signed a contract to supply railway signalling systems for the T26 tunnel and Bilecik depot on Turkey’s Ankara–Istanbul line.