A commentary says Alstom shares fell sharply after two profit warnings, with the company still weighed down by delayed projects, cost overruns and integration issues after the Bombardier Transportation deal. It says another warning cannot be ruled out as the new CEO prepares a future strategy update in 2027.
Everything we read, routed to your cluster
Network Rail will spend £1.75m to renew 1,300 metres of track, sleepers and ballast on a bridge between Rishton and Accrington in East Lancashire. The East Lancashire line will close on 22, 28 and 29 November, with rail replacement buses operating during the work.
Network Rail has appointed Hawkins\Brown, working with 5th Studio, to lead a masterplan for Oxford station. The plan will assess new entrances, improved onward travel links and capacity upgrades as passenger numbers rise, driven partly by East West Rail and other service increases.
Hyderabad Airport Metro Limited received bids from two international consortiums for the General Consultancy contract for Package 1 of Hyderabad Metro Phase 2. The consultant will support tendering, construction supervision, systems integration, testing and commissioning for four corridors totalling 63 km and 44 stations.
UIC said it will participate in COP31 to promote rail’s role in climate action, focusing on carbon-credit methodologies and including rail in national adaptation planning. It also highlighted the MoveCredits Coalition and joint work with UITP and Alstom on rail and public transport climate finance and resilience.
UIC Statistics Platform plenary meeting held on 19 Nov 2026 from 09:30 to 16:00.
UIC WG1 Station & Urban Design meeting will be held online on 1 December 2026.
The Mutiara Line LRT link from Macallum to Penang Sentral, including a 5.5 km marine bridge across the Penang Strait, is expected to start construction in Q3 2027 after MRT Corp completes tender evaluation this month. Completion is targeted for December 2031.
EBRD will fund €50 million for rehabilitation of Montenegro’s 39 km Golubovci–Bar railway section, including track, stations, bridges, signalling, telecommunications and power upgrades. Separately, ŽPCG and Stadler are progressing discussions on the design of three new electric multiple units.
UIC’s 2026 Asia-Pacific Web Meeting Series will run sessions on topics including advocacy, sustainability, resilience, security, passenger, infrastructure, rolling stock and energy, freight, and UIC publication tools. The programme aims to connect Asia-Pacific members more directly with UIC technical departments and working groups.
MCMC is testing internet coverage along the 378km Phase 1 East Coast Rail Link route from Gombak to Kota Baru, including 16 stations and tunnels, ahead of the Dec 12 launch. Maxis, appointed by MRL as the 4G infrastructure provider, has presented its implementation plan.
At IRSC Lisbon 2026, UIC presented work on safety culture, cyber resilience, risk assessment harmonisation, wayside monitoring, AI for level crossings, and safety management for Portugal’s future Lisbon-Porto high-speed line. The conference highlighted international cooperation on railway safety and innovation.
Robin Hood Line Community Partnership published its 2025 annual report, covering community engagement, rail safety education, station adoption, active travel, and local projects on the Nottinghamshire line. It also noted an award-winning Fusion Learning initiative and various community events and school visits.
Alstom cut its 2026/27 forecasts, with expected operating margin reduced from 6.5% to 1%, and delivery delays pushing some revenue into later years.
Australia’s ARTC reported faster Sydney–Melbourne freight times after network maintenance works. Inland Rail started track laying on the Illabo–Stockinbingal section, Queensland Rail announced freight incentives from January 2027, Western Australia advanced legislation to buy back its freight network, and Transport for NSW opened an EOI for new electric multiple units under the Future Fleet programme.
Great Northern will increase off-peak services between Moorgate and Hertford North to four trains per hour from 14 December, creating a 15-minute turn-up-and-go frequency at most stations on the route.
Siemens Mobility will supply three Pioneer 220 high-speed trains for California under a USD 772.1 million contract, with options included.
Singapore will expand the Singapore Rail Academy’s role from November with standardised training, wider eligibility, and new certification pathways for engineers, technicians and operations staff. The changes, developed with LTA and rail operators, are meant to support MRT network expansion, upgrades and future technology adoption.
Siemens Mobility launched Tech Experience Launchpad, a UK work-experience programme for 11–16-year-olds that will offer more than 3,300 opportunities a year and 10,000 over three years. The initiative coincided with the opening of Siemens’s £100 million Rail Technology Centre in Chippenham and supports UK rail skills development.
Anthony Loke said ECRL is projected to generate RM418 million in revenue by 2029, with cargo services contributing 70% and passenger services 30%.
Alstom said first-half revenue rose 3% to €9.3 billion and orders rose to €11.0 billion, but it cut its 2026/27 outlook. The company cited technical issues and testing requirements on the Coradia Max platform and revised margins on selected rolling stock projects.
UIC lists an event titled "Transport of Dangerous Goods Expert Group." No additional details were provided in the source text.
British rail staff assaults rose 12% to 11,289 in 2025-26, with many incidents linked to late shifts. The article says operators can reduce risk through roster planning, station lighting, CCTV, body cameras, safe spaces and stronger incident reporting and follow-up.
UIC lists the 43rd Regional Assembly Europe on 3 December 2026, scheduled from 14:30 to 17:00.
Spain’s transport minister and Adif president resigned after a fatal high-speed collision on the Madrid–Seville line. The line remains closed while investigators examine LZB protection failures and control-centre actions. Spain plans additional safety measures, including second-controller validation, new software, more staff training, and future ERTMS Level 2 installation.