TRC Synergy said its subsidiary is part of a consortium awarded a RM2.69 billion contract for Penang LRT Mutiara Line Civil Main Contract 2. The 5.5km package includes a 3.05km sea bridge linking Macallum on Penang Island to Penang Sentral in Seberang Perai.
Everything we read, routed to your cluster
UIC’s Global Level Crossing Network met in London on 28 October 2026 to share research and measures on level crossing safety, including youth risk perception, pedestrian fatalities, enforcement using drones, and human-factors assessment on low-frequency lines. UIC said a consolidated IRS on level crossing safety will be published by early 2027.
Premium PSU will present its full auxiliary and services power conversion range for rolling stock at InnoTrans 2026 in Berlin, including AC/DC supplies, DC/DC converters, inverters, VFDs and DC-UPS. The products are engineered to EN 50155 and related railway standards and built in Barcelona.
TRC Synergy said its subsidiary has a 30% interest in a joint venture awarded the RM2.69 billion Penang LRT CMC2 package. The five-year contract covers design and construction of a 5.5km sea-crossing viaduct, a navigation span, an elevated station and related works for the Mutiara Line.
Pune Metro Line 3, a 23.2-km PPP corridor linking Hinjawadi and Shivajinagar, opened on 3 November as the first metro project under India’s 2017 New Metro Rail Policy. Siemens supplied systems integration, CBTC, electrification and depot equipment; Alstom supplied 22 three-car trainsets.
Bala Lake Railway in North Wales will run two Santa steam trains on 12–13 December 2026. Pre-booked passengers will travel from Llanwchllyn to Bala Pen-y-Bont and visit Santa’s Grotto; children receive gifts and adults get a hot drink or cherry.
Penang’s Mutiara Line LRT Macallum–Penang Sentral alignment, including a 5.5km marine bridge across the Penang Strait, is scheduled to start construction in 3Q2027 after MRT Corp completes tender evaluation this month. The alignment is targeted for completion by December 2031.
Robin Hood Line Community Partnership published its 2025 annual report, covering community engagement, rail safety education, station adoption, active travel, and local projects on the Nottinghamshire line. It also noted an award-winning Fusion Learning initiative and various community events and school visits.
Parsons, with Systra and Egis in the RMTC joint venture, has been awarded project and construction management services for the Riyadh Metro Red Line Extension in Saudi Arabia. The 8.4-km extension will add five stations and connect King Saud University to Diriyah South.
The Mutiara Line LRT link from Macallum to Penang Sentral, including a 5.5 km marine bridge across the Penang Strait, is expected to start construction in Q3 2027 after MRT Corp completes tender evaluation this month. Completion is targeted for December 2031.
KORAIL won the 2026 UIC Sustainability Impact Awards’ Modal Shift category for its “Love Regional Rail Travel” initiative, which promotes rail tourism with local partners and a 50% fare discount. The programme launched in August 2024 and had about 470,000 passengers by July 2026.
The Vale of Rheidol Railway has completed its acquisition of the Brecon Mountain Railway in Wales. The two heritage narrow-gauge railways will keep their separate identities and locomotive fleets, while sharing engineering knowledge, maintenance, restoration work and facilities at Aberystwyth.
Amtrak has launched its Winter Wanderlust sale, offering up to 30% off fares on U.S. routes for travel between 1 December 2026 and 14 March 2027. The sale runs until 12 November and applies to Coach and Acela Business Class bookings.
TRC Synergy’s JV CCCC-TRC-UFUK accepted a RM2.69 billion contract from MRT Mutiara Sdn Bhd for Penang LRT Mutiara Line Package CMC2. The five-year scope covers a sea crossing viaduct with navigation spans, an elevated station, and associated works from Macallum to Penang Sentral.
British Transport Police released an image and appealed for information after a fight involving three people and weapons at Worthing station in West Sussex on 11 October 2026. Two men, aged 18 and 22, have been arrested and charged.
Anthony Loke said ECRL is projected to generate RM418 million in revenue by 2029, with cargo services contributing 70% and passenger services 30%.
Kelantan says the ECRL station at Cherang Tuli, Pasir Puteh, will be supported by industrial, logistics and warehousing development, including a proposed dry port in Bandar Baru Tok Bali, to create jobs and local business opportunities.
UIC WG1 Station & Urban Design meeting will be held online on 1 December 2026.
Anthony Loke said the East Coast Rail Link (ECRL) is projected to generate RM418 million in operating revenue from passenger and cargo services by 2029.
Opinion piece on the East Coast Rail Link (ECRL), saying the project is approaching a defining moment in Malaysia’s infrastructure development and discussing benefits for passengers.
ČD has launched a tender to sell six Taurus locomotives, offered individually or as a package with spare parts. The three-system units were built in 2007–2011, reach 230 km/h, and are approved for several Central European countries; two have ETCS, while two have Polish SHP equipment.
The Malaysian government has approved over RM250 million to support ECRL development in Kelantan, including RM30 million for a new bus terminal at Kota Bharu ECRL Station and more than RM200 million for preliminary works on a proposed extension to Rantau Panjang.
Garw Valley Railway in Wales will host a Santa’s Grotto on 5 December, with tickets at £5 per child. Families can meet Santa, receive gifts and refreshments, and see Christmas displays, a miniature train and shed tours.
SYSTRA, as part of the RMTC joint venture led by Parsons, has been awarded PMCM consultancy for the Riyadh Metro Red Line extension in Saudi Arabia. The project will add 5.4 km, eight stations, mostly underground tunnels, and connect Diriyah to the wider network.
Network Rail will renew more than 4 km of track and carry out maintenance and bridge works on Scotland’s West Highland Line between Helensburgh, Fort William and Mallaig from 6 to 17 November. The work will disrupt services, with replacement buses provided on affected sections.