UIC’s 2026 Asia-Pacific Web Meeting Series will run sessions on topics including advocacy, sustainability, resilience, security, passenger, infrastructure, rolling stock and energy, freight, and UIC publication tools. The programme aims to connect Asia-Pacific members more directly with UIC technical departments and working groups.
Everything we read, routed to your cluster
VIA Rail Canada completed the modernisation of its Toronto Maintenance Centre, funded by a US$310 million Government of Canada investment. The upgraded facility supports maintenance of VIA Rail’s new Corridor fleet of 32 bidirectional trainsets and existing equipment, with expanded bays, heavy-maintenance tools and a new vehicle monitoring system.
Freightliner has introduced a new logo after CMA CGM completed its acquisition of the UK intermodal business on 29 January 2026. The deal covered rail and road operations, inland terminals and the Freightliner brand, while heavy haul, Rotterdam Rail Feeding, and operations in Poland and Germany were excluded.
Premium PSU will present its full auxiliary and services power conversion range for rolling stock at InnoTrans 2026 in Berlin, including AC/DC supplies, DC/DC converters, inverters, VFDs and DC-UPS. The products are engineered to EN 50155 and related railway standards and built in Barcelona.
Australia’s ARTC reported faster Sydney–Melbourne freight times after network maintenance works. Inland Rail started track laying on the Illabo–Stockinbingal section, Queensland Rail announced freight incentives from January 2027, Western Australia advanced legislation to buy back its freight network, and Transport for NSW opened an EOI for new electric multiple units under the Future Fleet programme.
UIC and UIRR will present the 2026 Combined Transport report, covering freight market shifts, infrastructure constraints and evolving European policies.
Services between Leeds and York resumed after a nine-day closure for TransPennine Route Upgrade works. The works included replacing Common Lane Bridge at Church Fenton, installing new power lines for future electrification, and other track, overhead line and drainage upgrades on the East Coast Main Line.
The article says ETCS timeline changes should be managed through connected asset data, scenario planning and workbank updates so infrastructure, fleet and renewal plans stay aligned. It argues that planning tools can help identify affected assets, compare sequencing options and track assumptions as delivery milestones move.
Belgian freight operator Lineas has extended lease contracts with Ermewa for about 4,000 freight wagons across its European network. The renewal continues a sale-and-leaseback arrangement first agreed in 2021 and comes as Lineas works through financial restructuring after government rescue support.
Transport for Wales has proposed a Swansea Bay and West Wales Metro with new stations, extra services, a new platform at Swansea, track links and signalling-related enabling works. Phase A and Phase B plans are open for public feedback until 13 December 2026, with funding still to be secured.
UIC lists the Regional Assembly Europe Assistants (RAEA) meeting on 24 Nov 2026 from 13:00 to 15:00.
At IRSC Lisbon 2026, UIC presented work on safety culture, cyber resilience, risk assessment harmonisation, wayside monitoring, AI for level crossings, and safety management for Portugal’s future Lisbon-Porto high-speed line. The conference highlighted international cooperation on railway safety and innovation.
Alstom cut its 2026/27 forecasts, with expected operating margin reduced from 6.5% to 1%, and delivery delays pushing some revenue into later years.
Freightliner renamed locomotive 90040 as The Railway Mission at a ceremony in Crewe. It is the first locomotive to carry Freightliner’s refreshed branding after the CMA CGM takeover, and Freightliner also donated £1,000 to Railway Mission.
Alstom says the new-generation TGV, known in France as TGV M, has entered commercial service. It is the first train based on Alstom's Avelia Horizon very high-speed platform and builds on the company's long history in high-speed rail.
Stadler has started construction of a new commissioning facility in Weinfelden, Switzerland, to relieve capacity constraints at its Erlen site. The EUR 44 million project includes indoor and outdoor test tracks, final assembly areas and technical space. Operations are expected to begin in the first half of 2028.
UIC Rail System Forum held a plenary in Paris on 22 October 2026 to update its governance and work programme. Members agreed to a new architecture from 2027, with greater focus on rolling stock and energy strategies, stronger safety integration, and more member-driven priorities.
Pune Metro Line 3, a 23.2-km PPP corridor linking Hinjawadi and Shivajinagar, opened on 3 November as the first metro project under India’s 2017 New Metro Rail Policy. Siemens supplied systems integration, CBTC, electrification and depot equipment; Alstom supplied 22 three-car trainsets.
Kent’s Romney, Hythe and Dymchurch Railway says it will mark its 100th anniversary in 2027 with galas, a golden ticket competition, and the return of locomotives Typhoon, Hurricane and the Armoured Wagon.
Alstom said first-half revenue rose 3% to €9.3 billion and orders rose to €11.0 billion, but it cut its 2026/27 outlook. The company cited technical issues and testing requirements on the Coradia Max platform and revised margins on selected rolling stock projects.
Eurostar appointed Christophe Fanichet, former CEO of SNCF Voyageurs, as its new CEO. He will oversee a EUR 2 billion fleet investment programme, including up to 50 Alstom double-decker high-speed trains under the Celestia programme, with first service expected in May 2031.
UK Railtours will run December trips in East Anglia, London and Kent using paired Class 37 locomotives. Swietelsky and Europhoenix will provide traction, RailAdventure will operate the locomotives, and Eastern Rail Services will provide Mark 2 coaches. Tickets are available through the UK Railtours website.
ZSSK plans to invest €43.9 million in six battery-electric shunting locomotives for Bratislava and Žilina, with delivery planned by end-2030. Slovakia’s finance ministry recommends battery traction over diesel on lifecycle-cost grounds, ahead of ETCS-only operation on key corridors from 2031.
Modal Group and Dunkerque-Port opened a EUR 25 million intermodal terminal at Loon-Plage in Dunkirk, with four 750-metre rail tracks and services to Lyon. The terminal handles containers, semi-trailers and swap bodies, and a Lyon–Piacenza extension is planned for 2027.
Network Rail will spend £1.75m to renew 1,300 metres of track, sleepers and ballast on a bridge between Rishton and Accrington in East Lancashire. The East Lancashire line will close on 22, 28 and 29 November, with rail replacement buses operating during the work.