UIC lists an event titled "Transport of Dangerous Goods Expert Group." No additional details were provided in the source text.
Everything we read, routed to your cluster
KORAIL won the 2026 UIC Sustainability Impact Awards’ Modal Shift category for its “Love Regional Rail Travel” initiative, which promotes rail tourism with local partners and a 50% fare discount. The programme launched in August 2024 and had about 470,000 passengers by July 2026.
Anthony Loke said ECRL is projected to generate RM418 million in revenue by 2029, with cargo services contributing 70% and passenger services 30%.
Ukraine’s ministry, Ukrzaliznytsia and the PPP Agency signed a memorandum to prepare two railway projects in Zakarpattia: a 1,435 mm standard-gauge electrified line from Uzhhorod to the state border via Pavlovo, and modernisation of the Korolevo–Khust route. The work will be supported by the World Bank PREPARE programme.
PKP PLK is considering converting some existing Polish electrified main lines from 3 kV DC to 2×25 kV AC. The programme has two phases through 2045, with consultations planned in November 2026 and a final programme expected by year-end, subject to financing.
UIC Rail System Forum held a plenary in Paris on 22 October 2026 to update its governance and work programme. Members agreed to a new architecture from 2027, with greater focus on rolling stock and energy strategies, stronger safety integration, and more member-driven priorities.
Anthony Loke said the East Coast Rail Link (ECRL) is projected to generate RM418 million in operating revenue from passenger and cargo services by 2029.
BASF InfraService & Solutions Lausitz will haul quartz sand between Hohenbocka and Schwarzheide for Captrain subsidiary RBB using its industrial railway, locomotives and staff. BASF also plans to use spare rail capacity for further third-party freight contracts.
Chiltern Railways will offer free travel to serving military personnel and veterans travelling to Remembrance events on 7-8 November, with free return travel from London on 8 November. Veterans can use a Veterans Railcard, Veterans Oyster card, or other ID.
Freightliner renamed locomotive 90040 as The Railway Mission at a ceremony in Crewe. It is the first locomotive to carry Freightliner’s refreshed branding after the CMA CGM takeover, and Freightliner also donated £1,000 to Railway Mission.
Train services between Peterborough and London King’s Cross will be disrupted on 28–29 November due to digital signalling installation work on the East Coast Main Line. The work includes diagnostic system and software updates, track renewal, step-free access works, canopy work, and overhead line equipment upgrades.
Hitachi Rail marked the opening of the first operational section of Chennai Metro Phase II, a 15 km, 11-station elevated corridor powered by its CBTC signalling for GoA4 driverless operation. The wider Phase II signalling contract, awarded in 2023, covers 119 km of metro lines.
Modal Group and Dunkerque-Port opened a EUR 25 million intermodal terminal at Loon-Plage in Dunkirk, with four 750-metre rail tracks and services to Lyon. The terminal handles containers, semi-trailers and swap bodies, and a Lyon–Piacenza extension is planned for 2027.
Spanish infrastructure manager Adif has awarded the operation of the Vitoria-Jundiz intermodal terminal to Terminal Intermodal Jundiz, a consortium led by Medlog Spain Logistic with port and regional partners. The terminal covers 55,000 m² and is expected to grow from 4,723 ITUs in 2025 to 60,000 annually from year three.
A signalling fault caused by a power issue is disrupting trains on the West of England main line between London Waterloo, Salisbury, Yeovil Junction and Exeter St Davids. Engineers are replacing a cable, with delays, cancellations, diversions and rail replacement buses expected until about 3 pm.
UIC lists the 27th Africa Regional Assembly on 2 December 2026, from 15:00 to 17:00.
SYSTRA, as part of the RMTC joint venture led by Parsons, has been awarded PMCM consultancy for the Riyadh Metro Red Line extension in Saudi Arabia. The project will add 5.4 km, eight stations, mostly underground tunnels, and connect Diriyah to the wider network.
Alstom says the new-generation TGV M, based on its Avelia Horizon platform, has entered commercial service in France on SNCF’s Paris–Marseille route. The train offers higher capacity, lower energy use and predictive maintenance features, and is the first operational reference for the platform.
Schneider National will shift its primary eastern US intermodal rail service from CSX to Norfolk Southern under an agreement announced on 29 October 2026. Freight is expected to move in November 2026, and Norfolk Southern says it has been preparing terminal capacity and track adjustments for the added traffic.
Freightliner has introduced a new logo after CMA CGM completed its acquisition of the UK intermodal business on 29 January 2026. The deal covered rail and road operations, inland terminals and the Freightliner brand, while heavy haul, Rotterdam Rail Feeding, and operations in Poland and Germany were excluded.