Modal Group and Dunkerque-Port opened a EUR 25 million intermodal terminal at Loon-Plage in Dunkirk, with four 750-metre rail tracks and services to Lyon. The terminal handles containers, semi-trailers and swap bodies, and a Lyon–Piacenza extension is planned for 2027.
Everything we read, routed to your cluster
EBRD will fund €50 million for rehabilitation of Montenegro’s 39 km Golubovci–Bar railway section, including track, stations, bridges, signalling, telecommunications and power upgrades. Separately, ŽPCG and Stadler are progressing discussions on the design of three new electric multiple units.
VIA Rail Canada completed the modernisation of its Toronto Maintenance Centre, funded by a US$310 million Government of Canada investment. The upgraded facility supports maintenance of VIA Rail’s new Corridor fleet of 32 bidirectional trainsets and existing equipment, with expanded bays, heavy-maintenance tools and a new vehicle monitoring system.
Hitachi Rail opened a new C$30 million, 125,000-square-foot headquarters and center of excellence for signalling and systems in Toronto, Canada. The facility is intended to support the company’s signalling and systems work in the Canadian market.
Alstom announced the first ETCS Level 2 passenger service in Romania, using a Traxx Passenger electric locomotive and ETCS Level 2 trackside infrastructure between Buftea and Brazi on the Bucharest–Budapest line. The service began after the locomotives entered passenger operation in September 2026.
An opinion piece says the ECRL is nearing a defining moment in Malaysia, with passenger service due to start on 12 December 2026. It highlights expected travel-time savings, dynamic fare pricing, concessions and the importance of first- and last-mile connectivity around stations.
Amorim Cork Solutions supplied under ballast mats for a railway infrastructure project in Pampilhosa do Botão, Portugal, to help control vibration in a track transition zone beside a bridge. The mats were selected for their elastic support and ability to reduce vibration transmission under repeated train loading.
UIC lists a Regional Chair Meeting on 3 Dec 2026 from 09:30 to 10:30. No further agenda or location details are provided in the text.
UIC says the ERPC main group meeting in Rome will bring together procurement leaders from across the European rail sector.
Transport for Wales has proposed a Swansea Bay and West Wales Metro with new stations, extra services, a new platform at Swansea, track links and signalling-related enabling works. Phase A and Phase B plans are open for public feedback until 13 December 2026, with funding still to be secured.
Singapore will expand the Singapore Rail Academy’s role from November with standardised training, wider eligibility, and new certification pathways for engineers, technicians and operations staff. The changes, developed with LTA and rail operators, are meant to support MRT network expansion, upgrades and future technology adoption.
Eurostar appointed Christophe Fanichet, former CEO of SNCF Voyageurs, as its new CEO. He will oversee a EUR 2 billion fleet investment programme, including up to 50 Alstom double-decker high-speed trains under the Celestia programme, with first service expected in May 2031.
Montenegro’s transport ministry has opened a World Bank-financed tender for the design, supply and installation of safety equipment at 22 railway level crossings.
Hitachi Rail signed a contract to supply railway signalling systems for the T26 tunnel and Bilecik depot on Turkey’s Ankara–Istanbul line.
Transport for Wales has opened consultation on Swansea Bay Metro proposals, including a possible new Cockett station, a reopened platform at Swansea, and more frequent services between Swansea, Pembrey & Burry Port, and possibly Ammanford via Neath. Comments are open until 13 December 2026.
Holmatro says it has developed and supplied rerailing hydraulic systems for trains, metros and trams over the past decade, with deployments in countries including the Netherlands, Australia, the United States, Spain, China and Thailand. It highlights lighter aluminum components, remote control, and safety features for faster recovery after derailments.
Kelantan plans industrial and logistics development around the ECRL station in Cherang Tuli, Pasir Puteh, including processing industries, warehousing, a logistics hub and a proposed dry port in Bandar Baru Tok Bali. The state also wants supporting roads, distribution centres and last-mile logistics facilities.
Sydney Metro Southwest has opened passenger services, completing Sydney’s 66 km metro line with 31 stations. Alstom supplied Metropolis trains, Urbalis CBTC signalling and maintenance services for the extension, and also maintains the fleet at Metro Trains Sydney’s Tallawong depot.
At InnoTrans 2026 in Berlin, SOGECLAIR TRAINING & SIMULATION presented Oksygen® and LITE, simulation tools for driver and operator training. The platforms use real infrastructure data, digital twins, 2D/3D modelling and portable hardware to support training, assessment and operational readiness.
Penang’s Mutiara Line LRT Macallum–Penang Sentral alignment, including a 5.5km marine bridge across the Penang Strait, is scheduled to start construction in 3Q2027 after MRT Corp completes tender evaluation this month. The alignment is targeted for completion by December 2031.