The Mutiara Line LRT link from Macallum to Penang Sentral, including a 5.5 km marine bridge across the Penang Strait, is expected to start construction in Q3 2027 after MRT Corp completes tender evaluation this month. Completion is targeted for December 2031.
Everything we read, routed to your cluster
Penang’s Mutiara Line LRT Macallum–Penang Sentral alignment, including a 5.5km marine bridge across the Penang Strait, is scheduled to start construction in 3Q2027 after MRT Corp completes tender evaluation this month. The alignment is targeted for completion by December 2031.
MRT Corp has awarded a RM2.69 billion contract for CMC2, covering design and construction of a 5.5km Penang Mutiara Line extension from Macallum Street to Penang Sentral, including a 3.05km sea-crossing bridge. The 22-station project is 16% complete and is expected to open in 2031.
MRT Corp awarded a RM2.69 billion civil main contract to a CCCC-TRC Construction-Ufuk Semarak joint venture for the Penang LRT Mutiara Line cross-sea extension from Macallum to Penang Sentral. The 5.5km package includes a 3.05km bridge and is targeted for completion by December 2031.
MRT Corp awarded the RM2.69 billion Civil Main Contract 2 for the Penang LRT Mutiara Line. The package covers a 5.5km extension from Macallum to Penang Sentral, including a 3.05km sea-crossing bridge. The project is under construction and reported 16% complete.
TRC Synergy’s JV CCCC-TRC-UFUK accepted a RM2.69 billion contract from MRT Mutiara Sdn Bhd for Penang LRT Mutiara Line Package CMC2. The five-year scope covers a sea crossing viaduct with navigation spans, an elevated station, and associated works from Macallum to Penang Sentral.
TRC Synergy said its subsidiary is part of a consortium awarded a RM2.69 billion contract for Penang LRT Mutiara Line Civil Main Contract 2. The 5.5km package includes a 3.05km sea bridge linking Macallum on Penang Island to Penang Sentral in Seberang Perai.
MRT Corp has awarded a RM2.69 billion civil main contract to a JV of CCCC, TRC Construction and Ufuk Semarak for the Penang LRT Mutiara Line cross-sea extension. The 5.5km package includes a 3.05km sea bridge linking Macallum on Penang Island to Penang Sentral in Seberang Perai.
TRC Synergy said its subsidiary has a 30% interest in a joint venture awarded the RM2.69 billion Penang LRT CMC2 package. The five-year contract covers design and construction of a 5.5km sea-crossing viaduct, a navigation span, an elevated station and related works for the Mutiara Line.
East Midlands Railway says the Derwent Valley Line between Derby and Matlock will close from 14 to 22 November 2026 for £3m of Network Rail upgrade works, mainly track renewals at Whatstandwell, Cromford and Matlock Bath. Over 3,500 sleepers and 6,400 tonnes of ballast will be installed.
Hitachi Rail signed a contract to supply railway signalling systems for the T26 tunnel and Bilecik depot on Turkey’s Ankara–Istanbul line.
Robin Hood Line Community Partnership published its 2025 annual report, covering community engagement, rail safety education, station adoption, active travel, and local projects on the Nottinghamshire line. It also noted an award-winning Fusion Learning initiative and various community events and school visits.
An incident between Crewe and Stafford blocked the line, disrupting trains with cancellations, diversions and delays of 60 minutes or more until about 3pm on 3 November 2026. Avanti West Coast, CrossCountry, London Northwestern Railway and Lumo services were affected.
Train services between Peterborough and London King’s Cross will be disrupted on 28–29 November due to digital signalling installation work on the East Coast Main Line. The work includes diagnostic system and software updates, track renewal, step-free access works, canopy work, and overhead line equipment upgrades.
Services between Leeds and York resumed after a nine-day closure for TransPennine Route Upgrade works. The works included replacing Common Lane Bridge at Church Fenton, installing new power lines for future electrification, and other track, overhead line and drainage upgrades on the East Coast Main Line.
Hitachi Rail Spain and Hitachi Rail Turkey signed a contract to supply, install and commission signalling systems on Turkey’s Ankara-Istanbul line at T26 and Bilecik depot. The scope includes interlockings, the Traffic Control Centre, telecommunications expansion, and ETCS Level 1 and 2.
Network Rail will spend £1.75m to renew 1,300 metres of track, sleepers and ballast on a bridge between Rishton and Accrington in East Lancashire. The East Lancashire line will close on 22, 28 and 29 November, with rail replacement buses operating during the work.
Pune Metro Line 3, a 23.2-km PPP corridor linking Hinjawadi and Shivajinagar, opened on 3 November as the first metro project under India’s 2017 New Metro Rail Policy. Siemens supplied systems integration, CBTC, electrification and depot equipment; Alstom supplied 22 three-car trainsets.
Hitachi Rail opened its new Canadian headquarters in Scarborough, Toronto, to serve its signalling and systems business. The company is delivering the Ontario Line and Hazel McCallion Line, and modernizing TTC Line 2 signalling after a $400 million contract award in July.
Ground movement near Bentley on the South Western Railway line will require urgent embankment strengthening work from 6 to 8 November, with buses replacing trains between Farnham and Alton and speed restrictions in place before the work starts.
Prime Minister Narendra Modi inaugurated Pune Metro Line 3 (23 km) and laid the foundation stone for Pune Metro Phase-II projects worth about ₹13,500 crore. The new phase covers four corridors: Lines 2A, 2B, 4 and 4A, aimed at expanding metro connectivity across Pune.
The Watercress Line in Hampshire will run Steam Illuminations from 27 November 2026 to 2 January 2027, featuring a steam train with synchronised LED lights, music, interactive activities, and festive station attractions.
Alstom announced the first ETCS Level 2 passenger service in Romania, using a Traxx Passenger electric locomotive and ETCS Level 2 trackside infrastructure between Buftea and Brazi on the Bucharest–Budapest line. The service began after the locomotives entered passenger operation in September 2026.
Network Rail will renew more than 4 km of track and carry out maintenance and bridge works on Scotland’s West Highland Line between Helensburgh, Fort William and Mallaig from 6 to 17 November. The work will disrupt services, with replacement buses provided on affected sections.
Parsons, with Systra and Egis in the RMTC joint venture, has been awarded project and construction management services for the Riyadh Metro Red Line Extension in Saudi Arabia. The 8.4-km extension will add five stations and connect King Saud University to Diriyah South.