UIC Statistics Platform plenary meeting held on 19 Nov 2026 from 09:30 to 16:00.
Everything we read, routed to your cluster
A collision near Urda on Spain’s Madrid–Seville high-speed line is under investigation after an LZB control failure and an alleged decision to let one train resume normal running. The line remains closed while Renfe runs replacement services.
Siemens Mobility and Lufthansa Technik Defense have proposed a medical evacuation train for more than 150 patients, including intensive-care cases. The concept uses Vectouro coaches and a Vectron X locomotive, with a dual-mode option under consideration, for cross-border use on Europe’s standard-gauge network.
British rail staff assaults rose 12% to 11,289 in 2025-26, with many incidents linked to late shifts. The article says operators can reduce risk through roster planning, station lighting, CCTV, body cameras, safe spaces and stronger incident reporting and follow-up.
Network Rail will renew more than 4 km of track and carry out maintenance and bridge works on Scotland’s West Highland Line between Helensburgh, Fort William and Mallaig from 6 to 17 November. The work will disrupt services, with replacement buses provided on affected sections.
At IRSC Lisbon 2026, UIC presented work on safety culture, cyber resilience, risk assessment harmonisation, wayside monitoring, AI for level crossings, and safety management for Portugal’s future Lisbon-Porto high-speed line. The conference highlighted international cooperation on railway safety and innovation.
ZSSK plans to invest €43.9 million in six battery-electric shunting locomotives for Bratislava and Žilina, with delivery planned by end-2030. Slovakia’s finance ministry recommends battery traction over diesel on lifecycle-cost grounds, ahead of ETCS-only operation on key corridors from 2031.
EBRD will fund €50 million for rehabilitation of Montenegro’s 39 km Golubovci–Bar railway section, including track, stations, bridges, signalling, telecommunications and power upgrades. Separately, ŽPCG and Stadler are progressing discussions on the design of three new electric multiple units.
Spanish infrastructure manager Adif has awarded the operation of the Vitoria-Jundiz intermodal terminal to Terminal Intermodal Jundiz, a consortium led by Medlog Spain Logistic with port and regional partners. The terminal covers 55,000 m² and is expected to grow from 4,723 ITUs in 2025 to 60,000 annually from year three.
East Midlands Railway says the Derwent Valley Line between Derby and Matlock will close from 14 to 22 November 2026 for £3m of Network Rail upgrade works, mainly track renewals at Whatstandwell, Cromford and Matlock Bath. Over 3,500 sleepers and 6,400 tonnes of ballast will be installed.
At InnoTrans 2026, Vossloh launched new fastening systems for conventional, high-speed and urban rail, and added TrackStability software functions for track-buckling risk. The company also won about EUR 60 million in rail fastening contracts for two high-speed lines in Shandong, China, with deliveries from 2027.
UIC Rail System Forum held a plenary in Paris on 22 October 2026 to update its governance and work programme. Members agreed to a new architecture from 2027, with greater focus on rolling stock and energy strategies, stronger safety integration, and more member-driven priorities.
MCMC is testing internet coverage along the 378km Phase 1 East Coast Rail Link route from Gombak to Kota Baru, including 16 stations and tunnels, ahead of the Dec 12 launch. Maxis, appointed by MRL as the 4G infrastructure provider, has presented its implementation plan.
Australia’s ARTC reported faster Sydney–Melbourne freight times after network maintenance works. Inland Rail started track laying on the Illabo–Stockinbingal section, Queensland Rail announced freight incentives from January 2027, Western Australia advanced legislation to buy back its freight network, and Transport for NSW opened an EOI for new electric multiple units under the Future Fleet programme.
Severn Valley Railway says its Halloween services sold out and Christmas steam specials are booking quickly. The heritage railway is offering Elf Express and Santa Steam experiences with live entertainment, storytelling and children’s gifts.
UIC’s Global Level Crossing Network met in London on 28 October 2026 to share research and measures on level crossing safety, including youth risk perception, pedestrian fatalities, enforcement using drones, and human-factors assessment on low-frequency lines. UIC said a consolidated IRS on level crossing safety will be published by early 2027.
ČD has launched a tender to sell six Taurus locomotives, offered individually or as a package with spare parts. The three-system units were built in 2007–2011, reach 230 km/h, and are approved for several Central European countries; two have ETCS, while two have Polish SHP equipment.
Hitachi Rail Spain and Hitachi Rail Turkey signed a contract to supply, install and commission signalling systems on Turkey’s Ankara-Istanbul line at T26 and Bilecik depot. The scope includes interlockings, the Traffic Control Centre, telecommunications expansion, and ETCS Level 1 and 2.
Opinion piece on the East Coast Rail Link (ECRL), saying the project is approaching a defining moment in Malaysia’s infrastructure development and discussing benefits for passengers.
India approved a proposed 1,500-km North Bullet Train Corridor from Delhi to Guwahati, with stops including Agra, Kanpur, Lucknow, Varanasi, Patna and Siliguri. Detailed alignment, stations, schedule and financing are not yet set. The government said the programme will emphasize Make in India and lower fares than air travel.
A coal train derailed near Otira on New Zealand’s Midland Line, damaging the track and rolling stock and prompting a TAIC investigation. TranzAlpine passenger services are cut back to Arthur’s Pass with bus connections to Greymouth until an estimated Nov. 20.
African rail updates include a EUR 355 million Wabtec support agreement for Transnet locomotives, TAZARA’s five-year recovery plan, Ghana opening Tema–Mpakadan to private freight operators, TransNamib revising fleet renewal plans, and Algeria inviting bids for a 310 km railway section.
Network Rail will spend £1.75m to renew 1,300 metres of track, sleepers and ballast on a bridge between Rishton and Accrington in East Lancashire. The East Lancashire line will close on 22, 28 and 29 November, with rail replacement buses operating during the work.
At Austria’s Wels intermodal terminal, two new gantry cranes have been erected and are now in technical installation. The €68 million, ÖBB- and EU-financed upgrade also adds extended tracks, a longer crane runway, video gates and automated truck entry/exit, with completion expected in mid-2027.
UIC lists an event titled "Transport of Dangerous Goods Expert Group." No additional details were provided in the source text.