Network Rail has appointed Hawkins\Brown, working with 5th Studio, to lead a masterplan for Oxford station. The plan will assess new entrances, improved onward travel links and capacity upgrades as passenger numbers rise, driven partly by East West Rail and other service increases.
Everything we read, routed to your cluster
Siemens Mobility and Lufthansa Technik Defense have proposed a medical evacuation train for more than 150 patients, including intensive-care cases. The concept uses Vectouro coaches and a Vectron X locomotive, with a dual-mode option under consideration, for cross-border use on Europe’s standard-gauge network.
Siemens completed its acquisition of MERMEC’s signaling, electrification, telecommunication, diagnostics and analytics businesses. The acquired perimeter includes about 1,700 employees and €430 million in fiscal 2025 revenue, with signaling contributing about 60% of revenue. Siemens said the businesses serve customers in more than 70 countries.
Parsons, with Systra and Egis in the RMTC joint venture, has been awarded project and construction management services for the Riyadh Metro Red Line Extension in Saudi Arabia. The 8.4-km extension will add five stations and connect King Saud University to Diriyah South.
Kelantan says the ECRL station at Cherang Tuli, Pasir Puteh, will be supported by industrial, logistics and warehousing development, including a proposed dry port in Bandar Baru Tok Bali, to create jobs and local business opportunities.
Prime Minister Narendra Modi inaugurated Pune Metro Line 3 (23 km) and laid the foundation stone for Pune Metro Phase-II projects worth about ₹13,500 crore. The new phase covers four corridors: Lines 2A, 2B, 4 and 4A, aimed at expanding metro connectivity across Pune.
Severn Valley Railway will host Class 55 Deltic D9015 Tulyar from 13 to 16 May 2027 during its Spring Diesel Festival, marking 40 years since the line’s first diesel gala. The locomotive returned to passenger service in 2026 after a 30-year restoration.
UIC’s Global Level Crossing Network met in London on 28 October 2026 to share research and measures on level crossing safety, including youth risk perception, pedestrian fatalities, enforcement using drones, and human-factors assessment on low-frequency lines. UIC said a consolidated IRS on level crossing safety will be published by early 2027.
Transport for London has launched Operation Vector, an intelligence-led enforcement initiative with British Transport Police to target persistent fare evaders across London. In the first month, officers stopped more than 467 people, issued 156 penalty fares and made 24 arrests. TfL aims to cut fare evasion below 1.5% by 2030/31.
Llangollen and Corwen Railway is seeking volunteers from North Wales for customer-facing roles during its Christmas Santa Special services. The appeal covers roles such as stewards, greeters, Welsh-speaking volunteers and Santa’s elves, with festive operations starting on 28 November 2026.
A Southco guide explains monitor mounts, torque control methods, and selection factors such as weight, vibration, safety factor, and end-use environment for applications including kiosks, vehicles, and industrial equipment.
At Wandsworth Town station, piling for new lift shafts has been completed as part of a £19.8 million step-free access upgrade. The island platform is back in use, and the station is expected to become fully accessible in summer 2027. The project is funded by the UK Department for Transport and Wandsworth Council.
Alstom announced the first ETCS Level 2 passenger service in Romania, using a Traxx Passenger electric locomotive and ETCS Level 2 trackside infrastructure between Buftea and Brazi on the Bucharest–Budapest line. The service began after the locomotives entered passenger operation in September 2026.
Freightliner renamed locomotive 90040 as The Railway Mission at a ceremony in Crewe. It is the first locomotive to carry Freightliner’s refreshed branding after the CMA CGM takeover, and Freightliner also donated £1,000 to Railway Mission.
Network Rail completed nine days of work to renew and strengthen Saxmundham junction on East Suffolk Line, converting it from manual to powered operation and upgrading signalling and infrastructure. The improvements support increased freight traffic to the Sizewell C construction site and resumed Greater Anglia services between Halesworth and Ipswich.
UIC will hold its 9th Zero Waste Workshop in Paris and online on 19 January 2027 on critical raw materials and rail resilience. The event will discuss rail supply-chain dependencies, circular economy approaches, and draft EU Agency for Railways findings on circular economy in rail.
Services between Leeds and York resumed after a nine-day closure for TransPennine Route Upgrade works. The works included replacing Common Lane Bridge at Church Fenton, installing new power lines for future electrification, and other track, overhead line and drainage upgrades on the East Coast Main Line.
Berlin-based Rail Unit received a Stadler EuroDual and an Alstom TRAXX MS3 in October 2026 as it expands from railway personnel services into its own freight operations in Germany. The locomotives were leased from European Loc Pool and Northrail, following the company’s railway undertaking licence and safety certification.
UIC reported that GCU Joint Committee members and rail freight experts met in Mainz on 29 October 2026 for a workshop on the future of the GCU, focusing on contract application, governance, organisation and digitalisation. The work will continue into concrete next steps.
GMRC has invited bids for the ₹197.14 crore development and construction of the Gyaspur Depot for the Ahmedabad Metro Rail Project in Gujarat. The package covers depot infrastructure, an Operations Control Centre, and associated electrical and mechanical works. Bid submission closes on 20 November 2026.
At InnoTrans 2026 in Berlin, SOGECLAIR TRAINING & SIMULATION presented Oksygen® and LITE, simulation tools for driver and operator training. The platforms use real infrastructure data, digital twins, 2D/3D modelling and portable hardware to support training, assessment and operational readiness.
East Midlands Railway says the Derwent Valley Line between Derby and Matlock will close from 14 to 22 November 2026 for £3m of Network Rail upgrade works, mainly track renewals at Whatstandwell, Cromford and Matlock Bath. Over 3,500 sleepers and 6,400 tonnes of ballast will be installed.
ČD has launched a tender to sell six Taurus locomotives, offered individually or as a package with spare parts. The three-system units were built in 2007–2011, reach 230 km/h, and are approved for several Central European countries; two have ETCS, while two have Polish SHP equipment.
A Kuala Lumpur feature shows Sivabalan Arumugam creating intricate kolam art grain by grain with rice grains.
Siemens Mobility will supply three Pioneer 220 high-speed trains for California under a USD 772.1 million contract, with options included.