FS Logistix ordered six more CZ LOKO EffiShunter 1000 diesel-electric locomotives for Mercitalia Shunting & Terminal. The four-axle Class D744 units will be used for shunting at ports and terminals, freight on non-electrified lines, and rescue duties. The group already operates earlier EffiShunter orders.
Everything we read, routed to your cluster
Berlin-based Rail Unit received a Stadler EuroDual and an Alstom TRAXX MS3 in October 2026 as it expands from railway personnel services into its own freight operations in Germany. The locomotives were leased from European Loc Pool and Northrail, following the company’s railway undertaking licence and safety certification.
CFL multimodal launched an intermodal rail service between Bettembourg-Dudelange and Wrocław on 20 October 2026, operating four round trips per week. It also increased its Bettembourg–Lübeck service from three to four weekly round trips after recent operational disruption.
India’s Railway Board granted conditional clearance for a 16-car Vande Bharat Chair Car trainset built by RCF Kapurthala with Alstom propulsion, allowing operation up to 160 km/h subject to technical conditions. The Board raised issues on displays, protection, cabling, equipment mounting and traction motor rating.
ÖBB and SBB extended their passenger rail cooperation to 2036, covering more than 30 daily direct services and six night train routes from Zürich. Passenger numbers on the joint services have grown strongly over the past decade, alongside ÖBB’s rollout of new Siemens-built Nightjet trains.
UIC Rail Expert Group meeting 2026 will be held on 18–19 November 2026 in Hamburg, Germany, hosted by DB InfraGo.
Great Northern will increase off-peak services between Moorgate and Hertford North to four trains per hour from 14 December, creating a 15-minute turn-up-and-go frequency at most stations on the route.
Amtrak has launched its Winter Wanderlust sale, offering up to 30% off fares on U.S. routes for travel between 1 December 2026 and 14 March 2027. The sale runs until 12 November and applies to Coach and Acela Business Class bookings.
Malaysia and Singapore held a joint emergency response exercise for the Johor Bahru-Singapore RTS Link on 27–28 October 2026 at RTS Wadi Hana Depot. The drill tested firefighting, medical triage, casualty evacuation, and cross-border coordination by agencies from both countries ahead of passenger service start.
Belgian freight operator Lineas has extended lease contracts with Ermewa for about 4,000 freight wagons across its European network. The renewal continues a sale-and-leaseback arrangement first agreed in 2021 and comes as Lineas works through financial restructuring after government rescue support.
Siemens Mobility will supply three Pioneer 220 high-speed trains for California under a USD 772.1 million contract, with options included.
GMRC has invited bids for the ₹197.14 crore development and construction of the Gyaspur Depot for the Ahmedabad Metro Rail Project in Gujarat. The package covers depot infrastructure, an Operations Control Centre, and associated electrical and mechanical works. Bid submission closes on 20 November 2026.
VIA Rail has completed a C$310 million modernization of its Toronto Maintenance Centre, adding expanded heavy-maintenance facilities and a Vehicle Equipment Measurement System for early fault detection. The federally funded project supports VIA’s new Siemens Venture Corridor fleet and existing trains.
ZSSK plans to invest €43.9 million in six battery-electric shunting locomotives for Bratislava and Žilina, with delivery planned by end-2030. Slovakia’s finance ministry recommends battery traction over diesel on lifecycle-cost grounds, ahead of ETCS-only operation on key corridors from 2031.
Freightliner has introduced a new logo after CMA CGM completed its acquisition of the UK intermodal business on 29 January 2026. The deal covered rail and road operations, inland terminals and the Freightliner brand, while heavy haul, Rotterdam Rail Feeding, and operations in Poland and Germany were excluded.
Anthony Loke said the East Coast Rail Link (ECRL) is projected to generate RM418 million in operating revenue from passenger and cargo services by 2029.
Great Northern will double off-peak train frequency between Moorgate and Hertford North from 14 December. Services will run every 15 minutes on weekdays and Saturdays, with faster running into London and limited stops at Bayford and Crews Hill.
Batley station in West Yorkshire has been upgraded with a new footbridge and lifts, replacing the subway to provide step-free access as part of the Transpennine Route Upgrade. Further works, including waiting shelters and car park reopening, will continue into spring 2027.
SRI Rail Invest ordered a Vectron Dual Mode locomotive for delivery in late 2027 or early 2028. In a separate deal, it arranged financing for Projektbahn to acquire former ICE 2 vehicles from DB Fernverkehr.
VIA Rail Canada completed the modernisation of its Toronto Maintenance Centre, funded by a US$310 million Government of Canada investment. The upgraded facility supports maintenance of VIA Rail’s new Corridor fleet of 32 bidirectional trainsets and existing equipment, with expanded bays, heavy-maintenance tools and a new vehicle monitoring system.
ÖBB and SBB have extended their partnership to 2036 to continue daytime long-distance and joint night train services between Austria and Switzerland, including routes linking Vienna, Zurich, Innsbruck, Salzburg and other European cities. The companies say cross-border passenger numbers have grown over the past decade.
Azerbaijan Railways signed a contract with CRRC Zhuzhou Locomotive to buy four new passenger trains.
Transport for Wales has proposed a Swansea Bay and West Wales Metro with new stations, extra services, a new platform at Swansea, track links and signalling-related enabling works. Phase A and Phase B plans are open for public feedback until 13 December 2026, with funding still to be secured.
Canada has shortened the timetable for Roberts Bank Terminal 2 at the Port of Vancouver to 2035, with a final investment decision expected by mid-2027. The project includes a widened causeway with road and railway infrastructure, while the federal government is also developing a broader rail strategy for the port.
Singapore and Malaysia conducted a joint exercise simulating a fire on a stranded Johor Bahru-Singapore RTS Link train. The drill tested firefighting, triage, casualty evacuation, and cross-border command and communication ahead of passenger operations targeted for February 2027.