Train services between Peterborough and London King’s Cross will be disrupted on 28–29 November due to digital signalling installation work on the East Coast Main Line. The work includes diagnostic system and software updates, track renewal, step-free access works, canopy work, and overhead line equipment upgrades.
Everything we read, routed to your cluster
UIC will hold an online New Technologies Working Group Meeting on 24 Nov 2026 from 14:00 to 17:00.
Wabtec has reached 1,000 locomotives built at its Contagem plant in Brazil. Vale ordered 50 Evolution Series locomotives in 2025, and Wabtec also signed a USD 254 million deal with MRS Logística in September 2026 for locomotives, spare parts and maintenance through 2032. Some units are exported to Australia and Uruguay.
The Watercress Line in Hampshire will run Steam Illuminations from 27 November 2026 to 2 January 2027, featuring a steam train with synchronised LED lights, music, interactive activities, and festive station attractions.
Track work and tamping at Mossley Hill will affect most train services at Liverpool Lime Street on Sunday, 8 November. Avanti West Coast will divert via Earlestown, while several other operators will terminate short or run amended services. Merseyrail services are unaffected.
The Hampton Kempton Waterworks Railway in Middlesex will run Santa Specials on 12-13 and 19-20 December, with tickets booked in advance. The article also notes the railway won a 2023 HRA Infrastructure Award for a new coach shed and maintenance facility.
UIC will hold the 5th Global FRMCS Conference on 24–25 November 2026 in Paris. The event will cover FRMCS technical developments, V3p specifications, large-scale testing under FP2 MORANE 2, and global deployment challenges for next-generation railway communications.
Spain’s transport minister and Adif president resigned after a fatal high-speed collision on the Madrid–Seville line. The line remains closed while investigators examine LZB protection failures and control-centre actions. Spain plans additional safety measures, including second-controller validation, new software, more staff training, and future ERTMS Level 2 installation.
UIC says the ERPC main group meeting in Rome will bring together procurement leaders from across the European rail sector.
Services between Leeds and York resumed after a nine-day closure for TransPennine Route Upgrade works. The works included replacing Common Lane Bridge at Church Fenton, installing new power lines for future electrification, and other track, overhead line and drainage upgrades on the East Coast Main Line.
Pune Metro Line 3, a 23.2-km PPP corridor linking Hinjawadi and Shivajinagar, opened on 3 November as the first metro project under India’s 2017 New Metro Rail Policy. Siemens supplied systems integration, CBTC, electrification and depot equipment; Alstom supplied 22 three-car trainsets.
Trafikverket outlined Sweden’s winter rail maintenance setup for 14,400 km of track, including 32 maintenance contracts, 3,200 workers, 960 vehicles, heated switches, snow-melting machines and new hot-air de-icing systems. Contractors must respond within 60 to 120 minutes depending on time and route.
UIC lists the Regional Assembly Europe Assistants (RAEA) meeting on 24 Nov 2026 from 13:00 to 15:00.
SYSTRA, as part of the RMTC joint venture led by Parsons, has been awarded PMCM consultancy for the Riyadh Metro Red Line extension in Saudi Arabia. The project will add 5.4 km, eight stations, mostly underground tunnels, and connect Diriyah to the wider network.
An opinion piece says the ECRL is nearing a defining moment in Malaysia, with passenger service due to start on 12 December 2026. It highlights expected travel-time savings, dynamic fare pricing, concessions and the importance of first- and last-mile connectivity around stations.
Schneider National will shift its primary eastern US intermodal rail service from CSX to Norfolk Southern under an agreement announced on 29 October 2026. Freight is expected to move in November 2026, and Norfolk Southern says it has been preparing terminal capacity and track adjustments for the added traffic.
Batley station in West Yorkshire has been upgraded with a new footbridge and lifts, replacing the subway to provide step-free access as part of the Transpennine Route Upgrade. Further works, including waiting shelters and car park reopening, will continue into spring 2027.
UIC Africa Region training session on security of major events, with case studies from SNCF, FS, RPF, SENTER and ONCF on managing crowds for Olympics, religious processions, the Africa Nations Cup and World Cup 2030.
Hitachi Rail opened a new C$30 million, 125,000-square-foot headquarters and center of excellence for signalling and systems in Toronto, Canada. The facility is intended to support the company’s signalling and systems work in the Canadian market.
MRT Corp awarded a RM2.69 billion civil main contract to a CCCC-TRC Construction-Ufuk Semarak joint venture for the Penang LRT Mutiara Line cross-sea extension from Macallum to Penang Sentral. The 5.5km package includes a 3.05km bridge and is targeted for completion by December 2031.