Australia’s ARTC reported faster Sydney–Melbourne freight times after network maintenance works. Inland Rail started track laying on the Illabo–Stockinbingal section, Queensland Rail announced freight incentives from January 2027, Western Australia advanced legislation to buy back its freight network, and Transport for NSW opened an EOI for new electric multiple units under the Future Fleet programme.
Everything we read, routed to your cluster
VIA Rail will provide free train travel for young patients and families to six children’s hospitals in Ontario and Quebec under a three-year partnership with Canada’s Children’s Hospital Foundations. The program builds on a similar London, Ontario collaboration launched in April 2026.
Bala Lake Railway in North Wales will run two Santa steam trains on 12–13 December 2026. Pre-booked passengers will travel from Llanwchllyn to Bala Pen-y-Bont and visit Santa’s Grotto; children receive gifts and adults get a hot drink or cherry.
UIC and UIRR will present the 2026 Combined Transport report, covering freight market shifts, infrastructure constraints and evolving European policies.
ČD has launched a tender to sell six Taurus locomotives, offered individually or as a package with spare parts. The three-system units were built in 2007–2011, reach 230 km/h, and are approved for several Central European countries; two have ETCS, while two have Polish SHP equipment.
TRC Synergy said its subsidiary is part of a consortium awarded a RM2.69 billion contract for Penang LRT Mutiara Line Civil Main Contract 2. The 5.5km package includes a 3.05km sea bridge linking Macallum on Penang Island to Penang Sentral in Seberang Perai.
Penang’s Mutiara Line LRT Macallum–Penang Sentral alignment, including a 5.5km marine bridge across the Penang Strait, is scheduled to start construction in 3Q2027 after MRT Corp completes tender evaluation this month. The alignment is targeted for completion by December 2031.
Siemens Mobility and Lufthansa Technik Defense have proposed a medical evacuation train for more than 150 patients, including intensive-care cases. The concept uses Vectouro coaches and a Vectron X locomotive, with a dual-mode option under consideration, for cross-border use on Europe’s standard-gauge network.
Network Rail has appointed Hawkins\Brown, working with 5th Studio, to lead a masterplan for Oxford station. The plan will assess new entrances, improved onward travel links and capacity upgrades as passenger numbers rise, driven partly by East West Rail and other service increases.
Danish State Railways awarded ELL a EUR 26.35 million lease contract for up to 12 Siemens Vectron AC locomotives for regional and long-distance passenger services. The contract includes maintenance, spare parts and availability support, with initial entry into service expected from December 2026.
SRI Rail Invest ordered a Vectron Dual Mode locomotive for delivery in late 2027 or early 2028. In a separate deal, it arranged financing for Projektbahn to acquire former ICE 2 vehicles from DB Fernverkehr.
Porterbrook and GB Railfreight have signed a deal for 56 new MWA box wagons to be built by WH Davis in Nottinghamshire. The first wagon is due for completion by September 2027, and the wagons will carry recycled material to 7Steel’s Cardiff site.
Premium PSU will present its full auxiliary and services power conversion range for rolling stock at InnoTrans 2026 in Berlin, including AC/DC supplies, DC/DC converters, inverters, VFDs and DC-UPS. The products are engineered to EN 50155 and related railway standards and built in Barcelona.
MRT Corp has awarded a RM2.69 billion contract for CMC2, covering design and construction of a 5.5km Penang Mutiara Line extension from Macallum Street to Penang Sentral, including a 3.05km sea-crossing bridge. The 22-station project is 16% complete and is expected to open in 2031.
Transport for London has launched Operation Vector, an intelligence-led enforcement initiative with British Transport Police to target persistent fare evaders across London. In the first month, officers stopped more than 467 people, issued 156 penalty fares and made 24 arrests. TfL aims to cut fare evasion below 1.5% by 2030/31.
Network Rail will replace the 160-year-old Selhurst railway bridge in London over the Christmas period. The old bridge will be removed using self-propelled modular transporters, and Selhurst Road will be closed from 12 December to 10 January while the station remains open.
Batley station in West Yorkshire has been upgraded with a new footbridge and lifts, replacing the subway to provide step-free access as part of the Transpennine Route Upgrade. Further works, including waiting shelters and car park reopening, will continue into spring 2027.
British rail staff assaults rose 12% to 11,289 in 2025-26, with many incidents linked to late shifts. The article says operators can reduce risk through roster planning, station lighting, CCTV, body cameras, safe spaces and stronger incident reporting and follow-up.
MRT Corp awarded the RM2.69 billion Civil Main Contract 2 for the Penang LRT Mutiara Line. The package covers a 5.5km extension from Macallum to Penang Sentral, including a 3.05km sea-crossing bridge. The project is under construction and reported 16% complete.
Severn Valley Railway will host Class 55 Deltic D9015 Tulyar from 13 to 16 May 2027 during its Spring Diesel Festival, marking 40 years since the line’s first diesel gala. The locomotive returned to passenger service in 2026 after a 30-year restoration.