Freightliner renamed locomotive 90040 as The Railway Mission at a ceremony in Crewe. It is the first locomotive to carry Freightliner’s refreshed branding after the CMA CGM takeover, and Freightliner also donated £1,000 to Railway Mission.
Everything we read, routed to your cluster
PKP PLK is considering converting some existing Polish electrified main lines from 3 kV DC to 2×25 kV AC. The programme has two phases through 2045, with consultations planned in November 2026 and a final programme expected by year-end, subject to financing.
Garw Valley Railway in Wales will host a Santa’s Grotto on 5 December, with tickets at £5 per child. Families can meet Santa, receive gifts and refreshments, and see Christmas displays, a miniature train and shed tours.
Montenegro’s transport ministry has opened a World Bank-financed tender for the design, supply and installation of safety equipment at 22 railway level crossings.
Berlin-based Rail Unit received a Stadler EuroDual and an Alstom TRAXX MS3 in October 2026 as it expands from railway personnel services into its own freight operations in Germany. The locomotives were leased from European Loc Pool and Northrail, following the company’s railway undertaking licence and safety certification.
Robin Hood Line Community Partnership published its 2025 annual report, covering community engagement, rail safety education, station adoption, active travel, and local projects on the Nottinghamshire line. It also noted an award-winning Fusion Learning initiative and various community events and school visits.
The Northampton and Lamport Railway will run its Winter Warmer event on 3 January 2027, with two steam locomotives in service and Bagnall No. 2 making its last operating day before leaving the railway.
The Watercress Line in Hampshire will run Steam Illuminations from 27 November 2026 to 2 January 2027, featuring a steam train with synchronised LED lights, music, interactive activities, and festive station attractions.
Ukraine’s ministry, Ukrzaliznytsia and the PPP Agency signed a memorandum to prepare two railway projects in Zakarpattia: a 1,435 mm standard-gauge electrified line from Uzhhorod to the state border via Pavlovo, and modernisation of the Korolevo–Khust route. The work will be supported by the World Bank PREPARE programme.
India approved a proposed 1,500-km North Bullet Train Corridor from Delhi to Guwahati, with stops including Agra, Kanpur, Lucknow, Varanasi, Patna and Siliguri. Detailed alignment, stations, schedule and financing are not yet set. The government said the programme will emphasize Make in India and lower fares than air travel.
Weardale Railway in County Durham will host steam locomotive Flying Scotsman from 13 to 15 November, with scheduled arrivals at Stanhope station, paid viewing areas at five stations, and safety restrictions around platforms and footbridges.
An incident between Crewe and Stafford blocked the line, disrupting trains with cancellations, diversions and delays of 60 minutes or more until about 3pm on 3 November 2026. Avanti West Coast, CrossCountry, London Northwestern Railway and Lumo services were affected.
Llangollen and Corwen Railway is seeking volunteers from North Wales for customer-facing roles during its Christmas Santa Special services. The appeal covers roles such as stewards, greeters, Welsh-speaking volunteers and Santa’s elves, with festive operations starting on 28 November 2026.
Ground movement near Bentley on the South Western Railway line will require urgent embankment strengthening work from 6 to 8 November, with buses replacing trains between Farnham and Alton and speed restrictions in place before the work starts.
Canada has shortened the timetable for Roberts Bank Terminal 2 at the Port of Vancouver to 2035, with a final investment decision expected by mid-2027. The project includes a widened causeway with road and railway infrastructure, while the federal government is also developing a broader rail strategy for the port.
A World Bank Kenya Economic Update says the Mombasa–Nairobi SGR could have saved up to US$900 million if built at Tanzania-like costs. The report cites procurement irregularities, land speculation and corruption, and says governance weaknesses have raised public spending and borrowing costs.
Network Rail will replace a substandard railway bridge over Agbrigg Road in Wakefield for £5m over the Christmas period. The work will require a line closure between Doncaster and Leeds and road closures near Sandal and Agbrigg station.
GBR Anglia is offering free return travel for veterans and serving military personnel attending Remembrance services on 7–8 November on c2c and Greater Anglia, with similar support from London Northwestern Railway. The offer also now includes one immediate bereaved family member, using proof of eligibility and a complimentary ticket process.
UIC will hold the 5th Global FRMCS Conference on 24–25 November 2026 in Paris. The event will cover FRMCS technical developments, V3p specifications, large-scale testing under FP2 MORANE 2, and global deployment challenges for next-generation railway communications.
Hitachi Rail marked the opening of the first operational section of Chennai Metro Phase II, a 15 km, 11-station elevated corridor powered by its CBTC signalling for GoA4 driverless operation. The wider Phase II signalling contract, awarded in 2023, covers 119 km of metro lines.
Train services between Peterborough and London King’s Cross will be disrupted on 28–29 November due to digital signalling installation work on the East Coast Main Line. The work includes diagnostic system and software updates, track renewal, step-free access works, canopy work, and overhead line equipment upgrades.
Trafikverket outlined Sweden’s winter rail maintenance setup for 14,400 km of track, including 32 maintenance contracts, 3,200 workers, 960 vehicles, heated switches, snow-melting machines and new hot-air de-icing systems. Contractors must respond within 60 to 120 minutes depending on time and route.
Renfe has awarded Siemens a contract for 30 seven-car Velaro Novo high-speed trains. The trains will run up to 350 km/h, seat 520 passengers each, and be delivered over 62 months, with the first five due within 40 months.
Bachmann Europe announced its winter 2026 model railway releases, led by an OO-scale exclusive of LNER A2 No. 60532 Blue Peter in Express Blue. The range also includes new N and OO scale locomotives, wagons, coaches, buildings and accessories.
Network Rail completed nine days of work to renew and strengthen Saxmundham junction on East Suffolk Line, converting it from manual to powered operation and upgrading signalling and infrastructure. The improvements support increased freight traffic to the Sizewell C construction site and resumed Greater Anglia services between Halesworth and Ipswich.