Danish State Railways awarded ELL a EUR 26.35 million lease contract for up to 12 Siemens Vectron AC locomotives for regional and long-distance passenger services. The contract includes maintenance, spare parts and availability support, with initial entry into service expected from December 2026.
Everything we read, routed to your cluster
UK Railtours will run December trips in East Anglia, London and Kent using paired Class 37 locomotives. Swietelsky and Europhoenix will provide traction, RailAdventure will operate the locomotives, and Eastern Rail Services will provide Mark 2 coaches. Tickets are available through the UK Railtours website.
Train services between Peterborough and London King’s Cross will be disrupted on 28–29 November due to digital signalling installation work on the East Coast Main Line. The work includes diagnostic system and software updates, track renewal, step-free access works, canopy work, and overhead line equipment upgrades.
Siemens Mobility and Lufthansa Technik Defense have proposed a medical evacuation train for more than 150 patients, including intensive-care cases. The concept uses Vectouro coaches and a Vectron X locomotive, with a dual-mode option under consideration, for cross-border use on Europe’s standard-gauge network.
EAO will host a webinar on 12 November 2026 to review product innovations shown at InnoTrans 2026, including a third-generation Series 56 push button, a Universal Sound Module, charging solutions, Seat Reservation System updates, touchless operation and LED indicator strips.
Belgian freight operator Lineas has extended lease contracts with Ermewa for about 4,000 freight wagons across its European network. The renewal continues a sale-and-leaseback arrangement first agreed in 2021 and comes as Lineas works through financial restructuring after government rescue support.
Holmatro says it has developed and supplied rerailing hydraulic systems for trains, metros and trams over the past decade, with deployments in countries including the Netherlands, Australia, the United States, Spain, China and Thailand. It highlights lighter aluminum components, remote control, and safety features for faster recovery after derailments.
Penang’s Mutiara Line LRT Macallum–Penang Sentral alignment, including a 5.5km marine bridge across the Penang Strait, is scheduled to start construction in 3Q2027 after MRT Corp completes tender evaluation this month. The alignment is targeted for completion by December 2031.
RailStock Finland has ordered 21 additional Stadler FLIRT electric multiple units, expanding a programme launched in 2022. The four-car trains will be built at Stadler’s Siedlce plant in Poland for Finland’s broad-gauge network and winter conditions, bringing the total fleet under the programme to 41 units.
Indian Railways reported higher coal and overall freight loading in October, CONCOR ordered 12 rakes of container wagons from Golden Rock Workshop, DP World expanded double-stack services from JNPA, and the Rowghat iron ore line was commissioned. A new East-West dedicated freight corridor is under study.
UIC lists an event titled "Transport of Dangerous Goods Expert Group." No additional details were provided in the source text.
UIC will hold the 5th Global FRMCS Conference on 24–25 November 2026 in Paris. The event will cover FRMCS technical developments, V3p specifications, large-scale testing under FP2 MORANE 2, and global deployment challenges for next-generation railway communications.
ČD has launched a tender to sell six Taurus locomotives, offered individually or as a package with spare parts. The three-system units were built in 2007–2011, reach 230 km/h, and are approved for several Central European countries; two have ETCS, while two have Polish SHP equipment.
The Watercress Line in Hampshire will run Steam Illuminations from 27 November 2026 to 2 January 2027, featuring a steam train with synchronised LED lights, music, interactive activities, and festive station attractions.
CFL multimodal launched an intermodal rail service between Bettembourg-Dudelange and Wrocław on 20 October 2026, operating four round trips per week. It also increased its Bettembourg–Lübeck service from three to four weekly round trips after recent operational disruption.
Schneider National will shift its primary eastern US intermodal rail service from CSX to Norfolk Southern under an agreement announced on 29 October 2026. Freight is expected to move in November 2026, and Norfolk Southern says it has been preparing terminal capacity and track adjustments for the added traffic.
Leighton Buzzard Railway in Bedfordshire has announced a lineup of 2027 heritage railway events, including a Chaloner 150th birthday celebration, Easter activities, themed family days, a beer festival, and Christmas events. Full details will be posted on its website.
At InnoTrans 2026 in Berlin, SOGECLAIR TRAINING & SIMULATION presented Oksygen® and LITE, simulation tools for driver and operator training. The platforms use real infrastructure data, digital twins, 2D/3D modelling and portable hardware to support training, assessment and operational readiness.
CRRC Dalian and Temoinsa won an order in Chile for four CDA3 diesel locomotives. The locomotives have a maximum speed of 120 km/h, are intended for routine infrastructure maintenance, and will replace ageing equipment. First delivery is expected in about 18 months.
Eurostar appointed Christophe Fanichet, former CEO of SNCF Voyageurs, as its new CEO. He will oversee a EUR 2 billion fleet investment programme, including up to 50 Alstom double-decker high-speed trains under the Celestia programme, with first service expected in May 2031.
ZSSK plans to invest €43.9 million in six battery-electric shunting locomotives for Bratislava and Žilina, with delivery planned by end-2030. Slovakia’s finance ministry recommends battery traction over diesel on lifecycle-cost grounds, ahead of ETCS-only operation on key corridors from 2031.
Canada has shortened the timetable for Roberts Bank Terminal 2 at the Port of Vancouver to 2035, with a final investment decision expected by mid-2027. The project includes a widened causeway with road and railway infrastructure, while the federal government is also developing a broader rail strategy for the port.
UIC Rail Expert Group meeting 2026 will be held on 18–19 November 2026 in Hamburg, Germany, hosted by DB InfraGo.
UIC Rail System Forum held a plenary in Paris on 22 October 2026 to update its governance and work programme. Members agreed to a new architecture from 2027, with greater focus on rolling stock and energy strategies, stronger safety integration, and more member-driven priorities.
At InnoTrans 2026, Vossloh launched new fastening systems for conventional, high-speed and urban rail, and added TrackStability software functions for track-buckling risk. The company also won about EUR 60 million in rail fastening contracts for two high-speed lines in Shandong, China, with deliveries from 2027.