Modal Group and Dunkerque-Port opened a EUR 25 million intermodal terminal at Loon-Plage in Dunkirk, with four 750-metre rail tracks and services to Lyon. The terminal handles containers, semi-trailers and swap bodies, and a Lyon–Piacenza extension is planned for 2027.
Everything we read, routed to your cluster
Network Rail will replace a substandard railway bridge over Agbrigg Road in Wakefield for £5m over the Christmas period. The work will require a line closure between Doncaster and Leeds and road closures near Sandal and Agbrigg station.
VIA Rail Canada completed the modernisation of its Toronto Maintenance Centre, funded by a US$310 million Government of Canada investment. The upgraded facility supports maintenance of VIA Rail’s new Corridor fleet of 32 bidirectional trainsets and existing equipment, with expanded bays, heavy-maintenance tools and a new vehicle monitoring system.
LNER unveiled Azuma 801214 named ‘Remember’ at Newcastle Central Station as a Remembrance tribute to Armed Forces service members. The livery includes images of veterans from past and recent conflicts, with input from Reveille, Imperial War Museums curators and the UK Ministry of Defence.
Wensleydale Railway in Yorkshire received free track design support from TECS Ltd, which surveyed Leeming Bar yard and Bedale station curve and offered to complete design work for a yard reconfiguration and track relay.
Trafikverket outlined Sweden’s winter rail maintenance setup for 14,400 km of track, including 32 maintenance contracts, 3,200 workers, 960 vehicles, heated switches, snow-melting machines and new hot-air de-icing systems. Contractors must respond within 60 to 120 minutes depending on time and route.
The Rail Accident Investigation Branch said a train not in service hit the buffers at London Liverpool Street on 15 October 2026 at about 7 mph, derailing the first three carriages and damaging the train and buffer stop. A safety digest will follow.
Services between Leeds and York resumed after a nine-day closure for TransPennine Route Upgrade works. The works included replacing Common Lane Bridge at Church Fenton, installing new power lines for future electrification, and other track, overhead line and drainage upgrades on the East Coast Main Line.
Kenya Railways has begun vehicle transport on the Standard Gauge Railway between Mombasa and Nairobi, moving 21 cars on its first service. The operation uses adapted vehicle wagons alongside container trains and is being developed with Autobarn East Africa for about 700 vehicles a month.
UIC’s 2026 Asia-Pacific Web Meeting Series will run sessions on topics including advocacy, sustainability, resilience, security, passenger, infrastructure, rolling stock and energy, freight, and UIC publication tools. The programme aims to connect Asia-Pacific members more directly with UIC technical departments and working groups.
Train services between Peterborough and London King’s Cross will be disrupted on 28–29 November due to digital signalling installation work on the East Coast Main Line. The work includes diagnostic system and software updates, track renewal, step-free access works, canopy work, and overhead line equipment upgrades.
UIC describes rail-related climate work under COP action plans on freight modal shift, urban transport, and infrastructure resilience. It cites a new study on National Adaptation Plans showing rail is often mentioned but rarely backed by costs or funding, and says COP31 discussions will address green freight corridors and carbon markets.
Network Rail will renew more than 4 km of track and carry out maintenance and bridge works on Scotland’s West Highland Line between Helensburgh, Fort William and Mallaig from 6 to 17 November. The work will disrupt services, with replacement buses provided on affected sections.
At InnoTrans 2026 in Berlin, SOGECLAIR TRAINING & SIMULATION presented Oksygen® and LITE, simulation tools for driver and operator training. The platforms use real infrastructure data, digital twins, 2D/3D modelling and portable hardware to support training, assessment and operational readiness.
Transport for Greater Manchester will start redeveloping Bury Interchange later this month in two phases. The first phase includes a new footbridge, lift access to Metrolink platforms, platform resurfacing, canopy replacement, and upgrades to lighting, signage, CCTV, passenger information displays and ticketing facilities.
VIA Rail has completed a C$310 million modernization of its Toronto Maintenance Centre, adding expanded heavy-maintenance facilities and a Vehicle Equipment Measurement System for early fault detection. The federally funded project supports VIA’s new Siemens Venture Corridor fleet and existing trains.
Premium PSU will present its full auxiliary and services power conversion range for rolling stock at InnoTrans 2026 in Berlin, including AC/DC supplies, DC/DC converters, inverters, VFDs and DC-UPS. The products are engineered to EN 50155 and related railway standards and built in Barcelona.
ZF Aftermarket says its ProVia commercial vehicle spare parts brand will expand with transmission parts already added and clutches and air compressors next. By 2027, the range is planned to triple with more than 830 additional part numbers across Europe, IMEA and APAC.
GBR Anglia is offering free return travel for veterans and serving military personnel attending Remembrance services on 7–8 November on c2c and Greater Anglia, with similar support from London Northwestern Railway. The offer also now includes one immediate bereaved family member, using proof of eligibility and a complimentary ticket process.
Australia’s ARTC reported faster Sydney–Melbourne freight times after network maintenance works. Inland Rail started track laying on the Illabo–Stockinbingal section, Queensland Rail announced freight incentives from January 2027, Western Australia advanced legislation to buy back its freight network, and Transport for NSW opened an EOI for new electric multiple units under the Future Fleet programme.
SYSTRA, as part of the RMTC joint venture led by Parsons, has been awarded PMCM consultancy for the Riyadh Metro Red Line extension in Saudi Arabia. The project will add 5.4 km, eight stations, mostly underground tunnels, and connect Diriyah to the wider network.
Chiltern Railways said it will run over 90% of services on 12 November despite RMT industrial action, with some Birmingham, Stratford-upon-Avon and Leamington Spa services reduced or suspended. The operator also said all East West Rail services will have two staff on board.
Severn Valley Railway says its Halloween services sold out and Christmas steam specials are booking quickly. The heritage railway is offering Elf Express and Santa Steam experiences with live entertainment, storytelling and children’s gifts.
Network Rail has issued travel advice for Manchester Christmas Markets, which open on 6 November 2026 and are expected to draw heavy crowds on Northern and TransPennine Express services. Passengers are advised to plan ahead, use earlier return trains, and expect extra staff at Manchester Piccadilly.
At Austria’s Wels intermodal terminal, two new gantry cranes have been erected and are now in technical installation. The €68 million, ÖBB- and EU-financed upgrade also adds extended tracks, a longer crane runway, video gates and automated truck entry/exit, with completion expected in mid-2027.