At InnoTrans 2026, Vossloh launched new fastening systems for conventional, high-speed and urban rail, and added TrackStability software functions for track-buckling risk. The company also won about EUR 60 million in rail fastening contracts for two high-speed lines in Shandong, China, with deliveries from 2027.
Everything we read, routed to your cluster
At InnoTrans 2026 in Berlin, SOGECLAIR TRAINING & SIMULATION presented Oksygen® and LITE, simulation tools for driver and operator training. The platforms use real infrastructure data, digital twins, 2D/3D modelling and portable hardware to support training, assessment and operational readiness.
Leighton Buzzard Railway in Bedfordshire has announced a lineup of 2027 heritage railway events, including a Chaloner 150th birthday celebration, Easter activities, themed family days, a beer festival, and Christmas events. Full details will be posted on its website.
Network Rail will replace the 160-year-old Selhurst railway bridge in London over the Christmas period. The old bridge will be removed using self-propelled modular transporters, and Selhurst Road will be closed from 12 December to 10 January while the station remains open.
Southeastern held its annual Remembrance Service in Dover on 4 November, with veterans, cadets and railway colleagues attending. The operator also reminded veterans, serving personnel and bereaved family members that they can travel to Remembrance services for free.
Great Northern will increase off-peak services between Moorgate and Hertford North to four trains per hour from 14 December, creating a 15-minute turn-up-and-go frequency at most stations on the route.
UIC lists an event titled "Transport of Dangerous Goods Expert Group." No additional details were provided in the source text.
GBR Anglia is offering free return travel for veterans and serving military personnel attending Remembrance services on 7–8 November on c2c and Greater Anglia, with similar support from London Northwestern Railway. The offer also now includes one immediate bereaved family member, using proof of eligibility and a complimentary ticket process.
Network Rail completed nine days of work to renew and strengthen Saxmundham junction on East Suffolk Line, converting it from manual to powered operation and upgrading signalling and infrastructure. The improvements support increased freight traffic to the Sizewell C construction site and resumed Greater Anglia services between Halesworth and Ipswich.
Canada has shortened the timetable for Roberts Bank Terminal 2 at the Port of Vancouver to 2035, with a final investment decision expected by mid-2027. The project includes a widened causeway with road and railway infrastructure, while the federal government is also developing a broader rail strategy for the port.
Siemens completed its acquisition of MERMEC’s signaling, electrification, telecommunication, diagnostics and analytics businesses. The acquired perimeter includes about 1,700 employees and €430 million in fiscal 2025 revenue, with signaling contributing about 60% of revenue. Siemens said the businesses serve customers in more than 70 countries.
An incident between Crewe and Stafford blocked the line, disrupting trains with cancellations, diversions and delays of 60 minutes or more until about 3pm on 3 November 2026. Avanti West Coast, CrossCountry, London Northwestern Railway and Lumo services were affected.
Stadler has begun commissioning the first RBe 546 FLIRT EMU for Sihltal Zürich Uetliberg Bahn in Switzerland. The 17 three-car units were ordered in September 2024, with type testing in 2027 and commercial service planned from May 2028.
GWR and Transport for Wales will run extra trains and reservation-only services to Cardiff Central for Wales’ Autumn Rugby Internationals on 7, 14 and 21 November, with queueing and revenue checks in place due to expected crowding.
Porterbrook and GB Railfreight have signed a deal for 56 new MWA box wagons to be built by WH Davis in Nottinghamshire. The first wagon is due for completion by September 2027, and the wagons will carry recycled material to 7Steel’s Cardiff site.
Hitachi Rail opened a new C$30 million, 125,000-square-foot headquarters and center of excellence for signalling and systems in Toronto, Canada. The facility is intended to support the company’s signalling and systems work in the Canadian market.
Trafikverket outlined Sweden’s winter rail maintenance setup for 14,400 km of track, including 32 maintenance contracts, 3,200 workers, 960 vehicles, heated switches, snow-melting machines and new hot-air de-icing systems. Contractors must respond within 60 to 120 minutes depending on time and route.
UIC has released IRS 30345, a new non-binding standard for procuring new rolling stock with harmonised environmental specifications. It replaces UIC Leaflet 345 and sets guidance on energy use, emissions, noise, air quality, and circularity, including raising component recyclability targets from 85% to 95%.
Transport for London has launched Operation Vector, an intelligence-led enforcement initiative with British Transport Police to target persistent fare evaders across London. In the first month, officers stopped more than 467 people, issued 156 penalty fares and made 24 arrests. TfL aims to cut fare evasion below 1.5% by 2030/31.
Ground movement near Bentley on the South Western Railway line will require urgent embankment strengthening work from 6 to 8 November, with buses replacing trains between Farnham and Alton and speed restrictions in place before the work starts.