Stadler has started construction of a new commissioning facility in Weinfelden, Switzerland, to relieve capacity constraints at its Erlen site. The EUR 44 million project includes indoor and outdoor test tracks, final assembly areas and technical space. Operations are expected to begin in the first half of 2028.
Everything we read, routed to your cluster
ScotRail will add extra carriages and staff, and manage queuing at Haymarket, for the Scotland v New Zealand rugby international at Murrayfield on 7 November 2026. Services on several routes are expected to be very busy, and passengers are advised to buy tickets in advance.
Modal Group and Dunkerque-Port opened a EUR 25 million intermodal terminal at Loon-Plage in Dunkirk, with four 750-metre rail tracks and services to Lyon. The terminal handles containers, semi-trailers and swap bodies, and a Lyon–Piacenza extension is planned for 2027.
Spain’s transport minister and Adif president resigned after a fatal high-speed collision on the Madrid–Seville line. The line remains closed while investigators examine LZB protection failures and control-centre actions. Spain plans additional safety measures, including second-controller validation, new software, more staff training, and future ERTMS Level 2 installation.
SJ has opened bookings for its 2026/27 winter timetable. Direct sleeper trains between Stockholm and Narvik will return from 13 December 2026 under a new agreement with Trafikverket. SJ also plans overnight services to Umeå and Duved, plus a new train-and-bus connection from Stockholm to Sälen.
UIC said it will participate in COP31 to promote rail’s role in climate action, focusing on carbon-credit methodologies and including rail in national adaptation planning. It also highlighted the MoveCredits Coalition and joint work with UITP and Alstom on rail and public transport climate finance and resilience.
At InnoTrans 2026, Vossloh launched new fastening systems for conventional, high-speed and urban rail, and added TrackStability software functions for track-buckling risk. The company also won about EUR 60 million in rail fastening contracts for two high-speed lines in Shandong, China, with deliveries from 2027.
UIC Rail Expert Group meeting 2026 will be held on 18–19 November 2026 in Hamburg, Germany, hosted by DB InfraGo.
ÖBB and SBB have extended their partnership to 2036 to continue daytime long-distance and joint night train services between Austria and Switzerland, including routes linking Vienna, Zurich, Innsbruck, Salzburg and other European cities. The companies say cross-border passenger numbers have grown over the past decade.
MRT Corp awarded a RM2.69 billion civil main contract to a CCCC-TRC Construction-Ufuk Semarak joint venture for the Penang LRT Mutiara Line cross-sea extension from Macallum to Penang Sentral. The 5.5km package includes a 3.05km bridge and is targeted for completion by December 2031.
Holmatro says it has developed and supplied rerailing hydraulic systems for trains, metros and trams over the past decade, with deployments in countries including the Netherlands, Australia, the United States, Spain, China and Thailand. It highlights lighter aluminum components, remote control, and safety features for faster recovery after derailments.
Kelantan says the ECRL station at Cherang Tuli, Pasir Puteh, will be supported by industrial, logistics and warehousing development, including a proposed dry port in Bandar Baru Tok Bali, to create jobs and local business opportunities.
Amtrak has launched its Winter Wanderlust sale, offering up to 30% off fares on U.S. routes for travel between 1 December 2026 and 14 March 2027. The sale runs until 12 November and applies to Coach and Acela Business Class bookings.
A collision near Urda on Spain’s Madrid–Seville high-speed line is under investigation after an LZB control failure and an alleged decision to let one train resume normal running. The line remains closed while Renfe runs replacement services.
UIC lists the 38th RAME event.
TRC Synergy’s JV CCCC-TRC-UFUK accepted a RM2.69 billion contract from MRT Mutiara Sdn Bhd for Penang LRT Mutiara Line Package CMC2. The five-year scope covers a sea crossing viaduct with navigation spans, an elevated station, and associated works from Macallum to Penang Sentral.
MRT Corp has awarded a RM2.69 billion contract for CMC2, covering design and construction of a 5.5km Penang Mutiara Line extension from Macallum Street to Penang Sentral, including a 3.05km sea-crossing bridge. The 22-station project is 16% complete and is expected to open in 2031.
Jupiter Wagons said it won about EUR 138 million in new business in India for 2,583 freight wagons for Indian Railways and 405 ACT2 automobile carriers for GATX India and Chetak International. The Ministry of Railways also issued a separate tender for 5,800 BOBRN wagons, with no award yet announced.
MRT Corp awarded the RM2.69 billion Civil Main Contract 2 for the Penang LRT Mutiara Line. The package covers a 5.5km extension from Macallum to Penang Sentral, including a 3.05km sea-crossing bridge. The project is under construction and reported 16% complete.
ČD has launched a tender to sell six Taurus locomotives, offered individually or as a package with spare parts. The three-system units were built in 2007–2011, reach 230 km/h, and are approved for several Central European countries; two have ETCS, while two have Polish SHP equipment.