Spanish infrastructure manager Adif has awarded the operation of the Vitoria-Jundiz intermodal terminal to Terminal Intermodal Jundiz, a consortium led by Medlog Spain Logistic with port and regional partners. The terminal covers 55,000 m² and is expected to grow from 4,723 ITUs in 2025 to 60,000 annually from year three.
Everything we read, routed to your cluster
CPKC signed a five-year agreement to increase steelmaking coal shipments from British Columbia to Vancouver export terminals. CN expanded its Vaughan, Ontario fuel terminal to handle more than 15,000 railcars a year. Audi chose a Norfolk Southern-served site in Georgia for a EUR 3.6 billion factory.
Siemens Mobility and Lufthansa Technik Defense have proposed a medical evacuation train for more than 150 patients, including intensive-care cases. The concept uses Vectouro coaches and a Vectron X locomotive, with a dual-mode option under consideration, for cross-border use on Europe’s standard-gauge network.
Network Rail has advised passengers to plan ahead for heavy festive travel in Birmingham. Christmas markets and events are expected to increase use of Birmingham stations, with staff available at New Street, Moor Street and Snow Hill, while some services to New Street will be suspended from 24 to 28 December 2026.
Hitachi Rail signed a contract to supply railway signalling systems for the T26 tunnel and Bilecik depot on Turkey’s Ankara–Istanbul line.
Anthony Loke said the East Coast Rail Link (ECRL) is projected to generate RM418 million in operating revenue from passenger and cargo services by 2029.
Modal Group and Dunkerque-Port opened a EUR 25 million intermodal terminal at Loon-Plage in Dunkirk, with four 750-metre rail tracks and services to Lyon. The terminal handles containers, semi-trailers and swap bodies, and a Lyon–Piacenza extension is planned for 2027.
The California High-Speed Rail Authority approved Siemens’ contract to supply three AP220 high-speed trainsets, spare parts and 10 years of maintenance. The deal is worth USD 772.1 million, with options for up to 19 more trainsets. Initial manufacture and testing will be in Germany, with California testing planned from 2030.
Prime Minister Narendra Modi inaugurated Pune Metro Line 3 (23 km) and laid the foundation stone for Pune Metro Phase-II projects worth about ₹13,500 crore. The new phase covers four corridors: Lines 2A, 2B, 4 and 4A, aimed at expanding metro connectivity across Pune.
Parsons, with Systra and Egis in the RMTC joint venture, has been awarded project and construction management services for the Riyadh Metro Red Line Extension in Saudi Arabia. The 8.4-km extension will add five stations and connect King Saud University to Diriyah South.
UIC lists a Regional Chair Meeting on 3 Dec 2026 from 09:30 to 10:30. No further agenda or location details are provided in the text.
Montenegro’s transport ministry has opened a World Bank-financed tender for the design, supply and installation of safety equipment at 22 railway level crossings.
Batley station in West Yorkshire has been upgraded with a new footbridge and lifts, replacing the subway to provide step-free access as part of the Transpennine Route Upgrade. Further works, including waiting shelters and car park reopening, will continue into spring 2027.
The Watercress Line in Hampshire will run Steam Illuminations from 27 November 2026 to 2 January 2027, featuring a steam train with synchronised LED lights, music, interactive activities, and festive station attractions.
SRI Rail Invest ordered a Vectron Dual Mode locomotive for delivery in late 2027 or early 2028. In a separate deal, it arranged financing for Projektbahn to acquire former ICE 2 vehicles from DB Fernverkehr.
Kia Sales Malaysia said three future models for Malaysia will use a turbocharged petrol hybrid powertrain. The Sportage facelift is confirmed as one, while the Carnival is likely another and the K4 sedan/fastback may be the third.
Avanti West Coast has released tickets through the new year and is advising customers to book Christmas travel early for the best fares. Peak restrictions will be lifted from 18 December to 3 January. Planned engineering work on the West Coast Main Line includes a five-day closure of Birmingham New Street.
UIC held a webinar on 3 November 2026 on rail’s role in suicide prevention, covering effective interventions, means restriction, staff training, data sharing and new technologies such as fencing, lighting, CCTV and real-time track intrusion alerts.
Leighton Buzzard Railway in Bedfordshire has announced a lineup of 2027 heritage railway events, including a Chaloner 150th birthday celebration, Easter activities, themed family days, a beer festival, and Christmas events. Full details will be posted on its website.
PKP PLK is considering converting some existing Polish electrified main lines from 3 kV DC to 2×25 kV AC. The programme has two phases through 2045, with consultations planned in November 2026 and a final programme expected by year-end, subject to financing.