Bachmann Europe announced its winter 2026 model railway releases, led by an OO-scale exclusive of LNER A2 No. 60532 Blue Peter in Express Blue. The range also includes new N and OO scale locomotives, wagons, coaches, buildings and accessories.
Everything we read, routed to your cluster
Batley station in West Yorkshire has been upgraded with a new footbridge and lifts, replacing the subway to provide step-free access as part of the Transpennine Route Upgrade. Further works, including waiting shelters and car park reopening, will continue into spring 2027.
Lappa Valley Railway in Cornwall held sold-out Fireworks Spectaculars on 30 and 31 October, attracting thousands. The railway said the 2026 event was its most successful yet and that tickets for the next event, expected in 2027, will go on sale later in the summer.
Transport for Wales has proposed a Swansea Bay and West Wales Metro with new stations, extra services, a new platform at Swansea, track links and signalling-related enabling works. Phase A and Phase B plans are open for public feedback until 13 December 2026, with funding still to be secured.
Robin Hood Line Community Partnership published its 2025 annual report, covering community engagement, rail safety education, station adoption, active travel, and local projects on the Nottinghamshire line. It also noted an award-winning Fusion Learning initiative and various community events and school visits.
East Midlands Railway says the Derwent Valley Line between Derby and Matlock will close from 14 to 22 November 2026 for £3m of Network Rail upgrade works, mainly track renewals at Whatstandwell, Cromford and Matlock Bath. Over 3,500 sleepers and 6,400 tonnes of ballast will be installed.
MCMC is testing internet coverage along the 378km Phase 1 East Coast Rail Link route from Gombak to Kota Baru, including 16 stations and tunnels, ahead of the Dec 12 launch. Maxis, appointed by MRL as the 4G infrastructure provider, has presented its implementation plan.
Siemens Mobility launched Tech Experience Launchpad, a UK work-experience programme for 11–16-year-olds that will offer more than 3,300 opportunities a year and 10,000 over three years. The initiative coincided with the opening of Siemens’s £100 million Rail Technology Centre in Chippenham and supports UK rail skills development.
Network Rail will replace a substandard railway bridge over Agbrigg Road in Wakefield for £5m over the Christmas period. The work will require a line closure between Doncaster and Leeds and road closures near Sandal and Agbrigg station.
Schneider National will shift its primary eastern US intermodal rail service from CSX to Norfolk Southern under an agreement announced on 29 October 2026. Freight is expected to move in November 2026, and Norfolk Southern says it has been preparing terminal capacity and track adjustments for the added traffic.
Amtrak says Thanksgiving travel will set another record and will add Northeast Regional cars from November 20 to 30, plus two extra Washington–New York round trips on November 24–25 and 28–29. It also says 15 NextGen Acela trains are now in service and Amtrak Cascades is using Airo trains on four daily trips.
Berlin-based Rail Unit received a Stadler EuroDual and an Alstom TRAXX MS3 in October 2026 as it expands from railway personnel services into its own freight operations in Germany. The locomotives were leased from European Loc Pool and Northrail, following the company’s railway undertaking licence and safety certification.
Premium PSU will present its full auxiliary and services power conversion range for rolling stock at InnoTrans 2026 in Berlin, including AC/DC supplies, DC/DC converters, inverters, VFDs and DC-UPS. The products are engineered to EN 50155 and related railway standards and built in Barcelona.
The Northampton and Lamport Railway will run its Winter Warmer event on 3 January 2027, with two steam locomotives in service and Bagnall No. 2 making its last operating day before leaving the railway.
Chiltern Railways said it will run over 90% of services on 12 November despite RMT industrial action, with some Birmingham, Stratford-upon-Avon and Leamington Spa services reduced or suspended. The operator also said all East West Rail services will have two staff on board.
Severn Valley Railway says its Halloween services sold out and Christmas steam specials are booking quickly. The heritage railway is offering Elf Express and Santa Steam experiences with live entertainment, storytelling and children’s gifts.
Anthony Loke said the East Coast Rail Link (ECRL) is projected to generate RM418 million in operating revenue from passenger and cargo services by 2029.
Hitachi Rail opened its new Canadian headquarters in Scarborough, Toronto, to serve its signalling and systems business. The company is delivering the Ontario Line and Hazel McCallion Line, and modernizing TTC Line 2 signalling after a $400 million contract award in July.
Eurostar appointed Christophe Fanichet, former CEO of SNCF Voyageurs, as its new CEO. He will oversee a EUR 2 billion fleet investment programme, including up to 50 Alstom double-decker high-speed trains under the Celestia programme, with first service expected in May 2031.
Transport for Wales has opened consultation on Swansea Bay Metro proposals, including a possible new Cockett station, a reopened platform at Swansea, and more frequent services between Swansea, Pembrey & Burry Port, and possibly Ammanford via Neath. Comments are open until 13 December 2026.
The European Commission approved €29.3 million in German state aid for a new intermodal freight terminal at Stolberg Hauptbahnhof near Aachen. The terminal, part of the Euregio Railport project, is planned to open in 2035 and handle 740-metre freight trains, supporting rail freight flows to and from Benelux ports.
LNER unveiled Azuma 801214 named ‘Remember’ at Newcastle Central Station as a Remembrance tribute to Armed Forces service members. The livery includes images of veterans from past and recent conflicts, with input from Reveille, Imperial War Museums curators and the UK Ministry of Defence.
The Malaysian government has approved over RM250 million to support ECRL development in Kelantan, including RM30 million for a new bus terminal at Kota Bharu ECRL Station and more than RM200 million for preliminary works on a proposed extension to Rantau Panjang.
Network Rail has appointed Hawkins\Brown, working with 5th Studio, to lead a masterplan for Oxford station. The plan will assess new entrances, improved onward travel links and capacity upgrades as passenger numbers rise, driven partly by East West Rail and other service increases.
Opinion piece argues that ECRL’s high cost, loan burden and limited ridership or cargo capacity make its financial return doubtful, and says its value should be judged by wider economic spillovers rather than operating profits.