Alstom announced the first ETCS Level 2 passenger service in Romania, using a Traxx Passenger electric locomotive and ETCS Level 2 trackside infrastructure between Buftea and Brazi on the Bucharest–Budapest line. The service began after the locomotives entered passenger operation in September 2026.
Everything we read, routed to your cluster
Track work and tamping at Mossley Hill will affect most train services at Liverpool Lime Street on Sunday, 8 November. Avanti West Coast will divert via Earlestown, while several other operators will terminate short or run amended services. Merseyrail services are unaffected.
Transport for Wales has proposed a Swansea Bay and West Wales Metro with new stations, extra services, a new platform at Swansea, track links and signalling-related enabling works. Phase A and Phase B plans are open for public feedback until 13 December 2026, with funding still to be secured.
BASF InfraService & Solutions Lausitz will haul quartz sand between Hohenbocka and Schwarzheide for Captrain subsidiary RBB using its industrial railway, locomotives and staff. BASF also plans to use spare rail capacity for further third-party freight contracts.
Freightliner renamed locomotive 90040 as The Railway Mission at a ceremony in Crewe. It is the first locomotive to carry Freightliner’s refreshed branding after the CMA CGM takeover, and Freightliner also donated £1,000 to Railway Mission.
Bachmann Europe announced its winter 2026 model railway releases, led by an OO-scale exclusive of LNER A2 No. 60532 Blue Peter in Express Blue. The range also includes new N and OO scale locomotives, wagons, coaches, buildings and accessories.
African rail updates include a EUR 355 million Wabtec support agreement for Transnet locomotives, TAZARA’s five-year recovery plan, Ghana opening Tema–Mpakadan to private freight operators, TransNamib revising fleet renewal plans, and Algeria inviting bids for a 310 km railway section.
Network Rail will replace the 160-year-old Selhurst railway bridge in London over the Christmas period. The old bridge will be removed using self-propelled modular transporters, and Selhurst Road will be closed from 12 December to 10 January while the station remains open.
Garw Valley Railway in Wales will host a Santa’s Grotto on 5 December, with tickets at £5 per child. Families can meet Santa, receive gifts and refreshments, and see Christmas displays, a miniature train and shed tours.
Amorim Cork Solutions supplied under ballast mats for a railway infrastructure project in Pampilhosa do Botão, Portugal, to help control vibration in a track transition zone beside a bridge. The mats were selected for their elastic support and ability to reduce vibration transmission under repeated train loading.
A signalling fault caused by a power issue is disrupting trains on the West of England main line between London Waterloo, Salisbury, Yeovil Junction and Exeter St Davids. Engineers are replacing a cable, with delays, cancellations, diversions and rail replacement buses expected until about 3 pm.
India’s Railway Board granted conditional clearance for a 16-car Vande Bharat Chair Car trainset built by RCF Kapurthala with Alstom propulsion, allowing operation up to 160 km/h subject to technical conditions. The Board raised issues on displays, protection, cabling, equipment mounting and traction motor rating.
GBR Anglia is offering free return travel for veterans and serving military personnel attending Remembrance services on 7–8 November on c2c and Greater Anglia, with similar support from London Northwestern Railway. The offer also now includes one immediate bereaved family member, using proof of eligibility and a complimentary ticket process.
Montenegro’s transport ministry has opened a World Bank-financed tender for the design, supply and installation of safety equipment at 22 railway level crossings.
Hitachi Rail signed a contract to supply railway signalling systems for the T26 tunnel and Bilecik depot on Turkey’s Ankara–Istanbul line.
Network Rail will replace a substandard railway bridge over Agbrigg Road in Wakefield for £5m over the Christmas period. The work will require a line closure between Doncaster and Leeds and road closures near Sandal and Agbrigg station.
Robin Hood Line Community Partnership published its 2025 annual report, covering community engagement, rail safety education, station adoption, active travel, and local projects on the Nottinghamshire line. It also noted an award-winning Fusion Learning initiative and various community events and school visits.
Llangollen and Corwen Railway is seeking volunteers from North Wales for customer-facing roles during its Christmas Santa Special services. The appeal covers roles such as stewards, greeters, Welsh-speaking volunteers and Santa’s elves, with festive operations starting on 28 November 2026.
Indian Railways reported higher coal and overall freight loading in October, CONCOR ordered 12 rakes of container wagons from Golden Rock Workshop, DP World expanded double-stack services from JNPA, and the Rowghat iron ore line was commissioned. A new East-West dedicated freight corridor is under study.
Chiltern Railways will offer free travel to serving military personnel and veterans travelling to Remembrance events on 7-8 November, with free return travel from London on 8 November. Veterans can use a Veterans Railcard, Veterans Oyster card, or other ID.
Network Rail will spend £1.75m to renew 1,300 metres of track, sleepers and ballast on a bridge between Rishton and Accrington in East Lancashire. The East Lancashire line will close on 22, 28 and 29 November, with rail replacement buses operating during the work.
CSX expanded its Chambersburg intermodal terminal after volumes rose from 159,000 units in 2023 to 192,000 in 2025. The railway added a rubber-tyred gantry crane, two reach stackers and more parking space, and is now enlarging the maintenance facility. Further expansion options are under review.
LNER unveiled Azuma 801214 named ‘Remember’ at Newcastle Central Station as a Remembrance tribute to Armed Forces service members. The livery includes images of veterans from past and recent conflicts, with input from Reveille, Imperial War Museums curators and the UK Ministry of Defence.
Network Rail completed drainage renewal and related maintenance on the East Coast Main Line in North Yorkshire after two weekend possessions. The programme included 300 metres of drainage at Chapman’s Bridge near Shipton, work on track, power lines and points, vegetation management, and a new bridge at Church Fenton for overhead line preparation.
At Wandsworth Town station, piling for new lift shafts has been completed as part of a £19.8 million step-free access upgrade. The island platform is back in use, and the station is expected to become fully accessible in summer 2027. The project is funded by the UK Department for Transport and Wandsworth Council.