Network Rail will spend £1.75m to renew 1,300 metres of track, sleepers and ballast on a bridge between Rishton and Accrington in East Lancashire. The East Lancashire line will close on 22, 28 and 29 November, with rail replacement buses operating during the work.
Everything we read, routed to your cluster
East Midlands Railway says the Derwent Valley Line between Derby and Matlock will close from 14 to 22 November 2026 for £3m of Network Rail upgrade works, mainly track renewals at Whatstandwell, Cromford and Matlock Bath. Over 3,500 sleepers and 6,400 tonnes of ballast will be installed.
Network Rail completed drainage renewal and related maintenance on the East Coast Main Line in North Yorkshire after two weekend possessions. The programme included 300 metres of drainage at Chapman’s Bridge near Shipton, work on track, power lines and points, vegetation management, and a new bridge at Church Fenton for overhead line preparation.
Services between Leeds and York resumed after a nine-day closure for TransPennine Route Upgrade works. The works included replacing Common Lane Bridge at Church Fenton, installing new power lines for future electrification, and other track, overhead line and drainage upgrades on the East Coast Main Line.
An incident between Crewe and Stafford blocked the line, disrupting trains with cancellations, diversions and delays of 60 minutes or more until about 3pm on 3 November 2026. Avanti West Coast, CrossCountry, London Northwestern Railway and Lumo services were affected.
Train services between Peterborough and London King’s Cross will be disrupted on 28–29 November due to digital signalling installation work on the East Coast Main Line. The work includes diagnostic system and software updates, track renewal, step-free access works, canopy work, and overhead line equipment upgrades.
Network Rail completed nine days of work to renew and strengthen Saxmundham junction on East Suffolk Line, converting it from manual to powered operation and upgrading signalling and infrastructure. The improvements support increased freight traffic to the Sizewell C construction site and resumed Greater Anglia services between Halesworth and Ipswich.
The Merchant Navy Locomotive Preservation Society has formally taken ownership of steam locomotive 35025 Brocklebank Line. The group is assessing required restoration work, available parts and storage plans, with major components still needed for a future mainline return.
The Watercress Line in Hampshire will run Steam Illuminations from 27 November 2026 to 2 January 2027, featuring a steam train with synchronised LED lights, music, interactive activities, and festive station attractions.
Robin Hood Line Community Partnership published its 2025 annual report, covering community engagement, rail safety education, station adoption, active travel, and local projects on the Nottinghamshire line. It also noted an award-winning Fusion Learning initiative and various community events and school visits.
Chiltern Railways said it will run over 90% of services on 12 November despite RMT industrial action, with some Birmingham, Stratford-upon-Avon and Leamington Spa services reduced or suspended. The operator also said all East West Rail services will have two staff on board.
Opinion piece on the East Coast Rail Link (ECRL), saying the project is approaching a defining moment in Malaysia’s infrastructure development and discussing benefits for passengers.
MCMC is testing internet coverage along the 378km Phase 1 East Coast Rail Link route from Gombak to Kota Baru, including 16 stations and tunnels, ahead of the Dec 12 launch. Maxis, appointed by MRL as the 4G infrastructure provider, has presented its implementation plan.
Network Rail will renew more than 4 km of track and carry out maintenance and bridge works on Scotland’s West Highland Line between Helensburgh, Fort William and Mallaig from 6 to 17 November. The work will disrupt services, with replacement buses provided on affected sections.
Track work and tamping at Mossley Hill will affect most train services at Liverpool Lime Street on Sunday, 8 November. Avanti West Coast will divert via Earlestown, while several other operators will terminate short or run amended services. Merseyrail services are unaffected.
Anthony Loke said the East Coast Rail Link (ECRL) is projected to generate RM418 million in operating revenue from passenger and cargo services by 2029.
Ground movement near Bentley on the South Western Railway line will require urgent embankment strengthening work from 6 to 8 November, with buses replacing trains between Farnham and Alton and speed restrictions in place before the work starts.
Network Rail will replace a substandard railway bridge over Agbrigg Road in Wakefield for £5m over the Christmas period. The work will require a line closure between Doncaster and Leeds and road closures near Sandal and Agbrigg station.
Opinion piece argues that ECRL’s high cost, loan burden and limited ridership or cargo capacity make its financial return doubtful, and says its value should be judged by wider economic spillovers rather than operating profits.
The Transport Minister said the East Coast Rail Link is projected to generate RM418 million in operating revenue from passenger and cargo services by 2029.
Indian Railways reported higher coal and overall freight loading in October, CONCOR ordered 12 rakes of container wagons from Golden Rock Workshop, DP World expanded double-stack services from JNPA, and the Rowghat iron ore line was commissioned. A new East-West dedicated freight corridor is under study.
Malaysia has approved funding for preliminary work to extend the under-construction East Coast Rail Link by 32km to the Thai border.
Hitachi Rail opened its new Canadian headquarters in Scarborough, Toronto, to serve its signalling and systems business. The company is delivering the Ontario Line and Hazel McCallion Line, and modernizing TTC Line 2 signalling after a $400 million contract award in July.
Severn Valley Railway will host Class 55 Deltic D9015 Tulyar from 13 to 16 May 2027 during its Spring Diesel Festival, marking 40 years since the line’s first diesel gala. The locomotive returned to passenger service in 2026 after a 30-year restoration.
A signalling fault caused by a power issue is disrupting trains on the West of England main line between London Waterloo, Salisbury, Yeovil Junction and Exeter St Davids. Engineers are replacing a cable, with delays, cancellations, diversions and rail replacement buses expected until about 3 pm.