GWR and Transport for Wales will run extra trains and reservation-only services to Cardiff Central for Wales’ Autumn Rugby Internationals on 7, 14 and 21 November, with queueing and revenue checks in place due to expected crowding.
Everything we read, routed to your cluster
A signalling fault caused by a power issue is disrupting trains on the West of England main line between London Waterloo, Salisbury, Yeovil Junction and Exeter St Davids. Engineers are replacing a cable, with delays, cancellations, diversions and rail replacement buses expected until about 3 pm.
GBR Anglia is offering free return travel for veterans and serving military personnel attending Remembrance services on 7–8 November on c2c and Greater Anglia, with similar support from London Northwestern Railway. The offer also now includes one immediate bereaved family member, using proof of eligibility and a complimentary ticket process.
Montenegro’s transport ministry has opened a World Bank-financed tender for the design, supply and installation of safety equipment at 22 railway level crossings.
Network Rail will spend £1.75m to renew 1,300 metres of track, sleepers and ballast on a bridge between Rishton and Accrington in East Lancashire. The East Lancashire line will close on 22, 28 and 29 November, with rail replacement buses operating during the work.
India’s Railway Board granted conditional clearance for a 16-car Vande Bharat Chair Car trainset built by RCF Kapurthala with Alstom propulsion, allowing operation up to 160 km/h subject to technical conditions. The Board raised issues on displays, protection, cabling, equipment mounting and traction motor rating.
Network Rail will replace a substandard railway bridge over Agbrigg Road in Wakefield for £5m over the Christmas period. The work will require a line closure between Doncaster and Leeds and road closures near Sandal and Agbrigg station.
Paul Middleton returns with a new five-episode Steam Train Diaries series on More4 from 12 November. The programme visits several heritage railways, including North Yorkshire Moors Railway, where bridge repairs are under way and locomotive Omaha is being converted from coal to oil.
Freightliner renamed locomotive 90040 as The Railway Mission at a ceremony in Crewe. It is the first locomotive to carry Freightliner’s refreshed branding after the CMA CGM takeover, and Freightliner also donated £1,000 to Railway Mission.
Bachmann Europe announced its winter 2026 model railway releases, led by an OO-scale exclusive of LNER A2 No. 60532 Blue Peter in Express Blue. The range also includes new N and OO scale locomotives, wagons, coaches, buildings and accessories.
Kenya Railways has begun vehicle transport on the Standard Gauge Railway between Mombasa and Nairobi, moving 21 cars on its first service. The operation uses adapted vehicle wagons alongside container trains and is being developed with Autobarn East Africa for about 700 vehicles a month.
Robin Hood Line Community Partnership published its 2025 annual report, covering community engagement, rail safety education, station adoption, active travel, and local projects on the Nottinghamshire line. It also noted an award-winning Fusion Learning initiative and various community events and school visits.
Network Rail will replace the 160-year-old Selhurst railway bridge in London over the Christmas period. The old bridge will be removed using self-propelled modular transporters, and Selhurst Road will be closed from 12 December to 10 January while the station remains open.
Chiltern Railways will offer free travel to serving military personnel and veterans travelling to Remembrance events on 7-8 November, with free return travel from London on 8 November. Veterans can use a Veterans Railcard, Veterans Oyster card, or other ID.
BASF InfraService & Solutions Lausitz will haul quartz sand between Hohenbocka and Schwarzheide for Captrain subsidiary RBB using its industrial railway, locomotives and staff. BASF also plans to use spare rail capacity for further third-party freight contracts.
LNER unveiled Azuma 801214 named ‘Remember’ at Newcastle Central Station as a Remembrance tribute to Armed Forces service members. The livery includes images of veterans from past and recent conflicts, with input from Reveille, Imperial War Museums curators and the UK Ministry of Defence.
Network Rail completed nine days of work to renew and strengthen Saxmundham junction on East Suffolk Line, converting it from manual to powered operation and upgrading signalling and infrastructure. The improvements support increased freight traffic to the Sizewell C construction site and resumed Greater Anglia services between Halesworth and Ipswich.
Berlin-based Rail Unit received a Stadler EuroDual and an Alstom TRAXX MS3 in October 2026 as it expands from railway personnel services into its own freight operations in Germany. The locomotives were leased from European Loc Pool and Northrail, following the company’s railway undertaking licence and safety certification.
Track work and tamping at Mossley Hill will affect most train services at Liverpool Lime Street on Sunday, 8 November. Avanti West Coast will divert via Earlestown, while several other operators will terminate short or run amended services. Merseyrail services are unaffected.
Amorim Cork Solutions supplied under ballast mats for a railway infrastructure project in Pampilhosa do Botão, Portugal, to help control vibration in a track transition zone beside a bridge. The mats were selected for their elastic support and ability to reduce vibration transmission under repeated train loading.
Train services between Peterborough and London King’s Cross will be disrupted on 28–29 November due to digital signalling installation work on the East Coast Main Line. The work includes diagnostic system and software updates, track renewal, step-free access works, canopy work, and overhead line equipment upgrades.
At Wandsworth Town station, piling for new lift shafts has been completed as part of a £19.8 million step-free access upgrade. The island platform is back in use, and the station is expected to become fully accessible in summer 2027. The project is funded by the UK Department for Transport and Wandsworth Council.
Ukraine’s ministry, Ukrzaliznytsia and the PPP Agency signed a memorandum to prepare two railway projects in Zakarpattia: a 1,435 mm standard-gauge electrified line from Uzhhorod to the state border via Pavlovo, and modernisation of the Korolevo–Khust route. The work will be supported by the World Bank PREPARE programme.
Hitachi Rail signed a contract to supply railway signalling systems for the T26 tunnel and Bilecik depot on Turkey’s Ankara–Istanbul line.
Indian Railways reported higher coal and overall freight loading in October, CONCOR ordered 12 rakes of container wagons from Golden Rock Workshop, DP World expanded double-stack services from JNPA, and the Rowghat iron ore line was commissioned. A new East-West dedicated freight corridor is under study.