Llangollen and Corwen Railway is seeking volunteers from North Wales for customer-facing roles during its Christmas Santa Special services. The appeal covers roles such as stewards, greeters, Welsh-speaking volunteers and Santa’s elves, with festive operations starting on 28 November 2026.
Everything we read, routed to your cluster
UIC’s Global Level Crossing Network met in London on 28 October 2026 to share research and measures on level crossing safety, including youth risk perception, pedestrian fatalities, enforcement using drones, and human-factors assessment on low-frequency lines. UIC said a consolidated IRS on level crossing safety will be published by early 2027.
Transport for Wales has proposed a Swansea Bay and West Wales Metro with new stations, extra services, a new platform at Swansea, track links and signalling-related enabling works. Phase A and Phase B plans are open for public feedback until 13 December 2026, with funding still to be secured.
The Polar Express train ride will return to South Devon Railway from 27 November to 23 December, with themed journeys, characters, entertainment, and visits to Father Christmas. Tickets are expected to sell quickly.
Network Rail has advised passengers to plan ahead for heavy festive travel in Birmingham. Christmas markets and events are expected to increase use of Birmingham stations, with staff available at New Street, Moor Street and Snow Hill, while some services to New Street will be suspended from 24 to 28 December 2026.
Modal Group and Dunkerque-Port opened a EUR 25 million intermodal terminal at Loon-Plage in Dunkirk, with four 750-metre rail tracks and services to Lyon. The terminal handles containers, semi-trailers and swap bodies, and a Lyon–Piacenza extension is planned for 2027.
A Scottish fatal accident inquiry found that an off-design drain, missing as-built records, and maintenance and weather-management gaps contributed to the 2020 Carmont derailment. The inquiry said building the drain to its approved design might realistically have prevented the crash. No new recommendations were made.
UIC’s 2026 Asia-Pacific Web Meeting Series will run sessions on topics including advocacy, sustainability, resilience, security, passenger, infrastructure, rolling stock and energy, freight, and UIC publication tools. The programme aims to connect Asia-Pacific members more directly with UIC technical departments and working groups.
Great Northern will increase off-peak services between Moorgate and Hertford North to four trains per hour from 14 December, creating a 15-minute turn-up-and-go frequency at most stations on the route.
Ares has agreed to acquire Infinity Transportation, a US railcar leasing business with about 50,000 railcars leased to more than 350 customers across the US, Canada and Mexico, for about $2.9 billion. Completion is expected in Q1 2027, subject to approvals.
At InnoTrans 2026, Vossloh launched new fastening systems for conventional, high-speed and urban rail, and added TrackStability software functions for track-buckling risk. The company also won about EUR 60 million in rail fastening contracts for two high-speed lines in Shandong, China, with deliveries from 2027.
CFL multimodal launched an intermodal rail service between Bettembourg-Dudelange and Wrocław on 20 October 2026, operating four round trips per week. It also increased its Bettembourg–Lübeck service from three to four weekly round trips after recent operational disruption.
EBRD will fund €50 million for rehabilitation of Montenegro’s 39 km Golubovci–Bar railway section, including track, stations, bridges, signalling, telecommunications and power upgrades. Separately, ŽPCG and Stadler are progressing discussions on the design of three new electric multiple units.
Kia Sales Malaysia said three future models for Malaysia will use a turbocharged petrol hybrid powertrain. The Sportage facelift is confirmed as one, while the Carnival is likely another and the K4 sedan/fastback may be the third.
The Mutiara Line LRT link from Macallum to Penang Sentral, including a 5.5 km marine bridge across the Penang Strait, is expected to start construction in Q3 2027 after MRT Corp completes tender evaluation this month. Completion is targeted for December 2031.
Wabtec has reached 1,000 locomotives built at its Contagem plant in Brazil. Vale ordered 50 Evolution Series locomotives in 2025, and Wabtec also signed a USD 254 million deal with MRS Logística in September 2026 for locomotives, spare parts and maintenance through 2032. Some units are exported to Australia and Uruguay.
UIC lists an Executive Board meeting on 3 Dec 2026, scheduled from 11:30 to 13:30.
Network Rail will replace a substandard railway bridge over Agbrigg Road in Wakefield for £5m over the Christmas period. The work will require a line closure between Doncaster and Leeds and road closures near Sandal and Agbrigg station.
Network Rail completed nine days of work to renew and strengthen Saxmundham junction on East Suffolk Line, converting it from manual to powered operation and upgrading signalling and infrastructure. The improvements support increased freight traffic to the Sizewell C construction site and resumed Greater Anglia services between Halesworth and Ipswich.
Trafikverket outlined Sweden’s winter rail maintenance setup for 14,400 km of track, including 32 maintenance contracts, 3,200 workers, 960 vehicles, heated switches, snow-melting machines and new hot-air de-icing systems. Contractors must respond within 60 to 120 minutes depending on time and route.