MCMC is testing internet coverage along the 378km Phase 1 East Coast Rail Link route from Gombak to Kota Baru, including 16 stations and tunnels, ahead of the Dec 12 launch. Maxis, appointed by MRL as the 4G infrastructure provider, has presented its implementation plan.
Everything we read, routed to your cluster
ÖBB and SBB extended their passenger rail cooperation to 2036, covering more than 30 daily direct services and six night train routes from Zürich. Passenger numbers on the joint services have grown strongly over the past decade, alongside ÖBB’s rollout of new Siemens-built Nightjet trains.
Batley station in West Yorkshire has been upgraded with a new footbridge and lifts, replacing the subway to provide step-free access as part of the Transpennine Route Upgrade. Further works, including waiting shelters and car park reopening, will continue into spring 2027.
ÖBB and SBB have extended their partnership to 2036 to continue daytime long-distance and joint night train services between Austria and Switzerland, including routes linking Vienna, Zurich, Innsbruck, Salzburg and other European cities. The companies say cross-border passenger numbers have grown over the past decade.
SJ has opened bookings for its 2026/27 winter timetable. Direct sleeper trains between Stockholm and Narvik will return from 13 December 2026 under a new agreement with Trafikverket. SJ also plans overnight services to Umeå and Duved, plus a new train-and-bus connection from Stockholm to Sälen.
Transport for Greater Manchester will start redeveloping Bury Interchange later this month in two phases. The first phase includes a new footbridge, lift access to Metrolink platforms, platform resurfacing, canopy replacement, and upgrades to lighting, signage, CCTV, passenger information displays and ticketing facilities.
Transport for London has launched Operation Vector, an intelligence-led enforcement initiative with British Transport Police to target persistent fare evaders across London. In the first month, officers stopped more than 467 people, issued 156 penalty fares and made 24 arrests. TfL aims to cut fare evasion below 1.5% by 2030/31.
An opinion piece says the ECRL is nearing a defining moment in Malaysia, with passenger service due to start on 12 December 2026. It highlights expected travel-time savings, dynamic fare pricing, concessions and the importance of first- and last-mile connectivity around stations.
Network Rail will replace the 160-year-old Selhurst railway bridge in London over the Christmas period. The old bridge will be removed using self-propelled modular transporters, and Selhurst Road will be closed from 12 December to 10 January while the station remains open.
Track work and tamping at Mossley Hill will affect most train services at Liverpool Lime Street on Sunday, 8 November. Avanti West Coast will divert via Earlestown, while several other operators will terminate short or run amended services. Merseyrail services are unaffected.
Severn Valley Railway says its Halloween services sold out and Christmas steam specials are booking quickly. The heritage railway is offering Elf Express and Santa Steam experiences with live entertainment, storytelling and children’s gifts.
Opinion piece on the East Coast Rail Link (ECRL), saying the project is approaching a defining moment in Malaysia’s infrastructure development and discussing benefits for passengers.
GBR Anglia is offering free return travel for veterans and serving military personnel attending Remembrance services on 7–8 November on c2c and Greater Anglia, with similar support from London Northwestern Railway. The offer also now includes one immediate bereaved family member, using proof of eligibility and a complimentary ticket process.
Hanoi has signed EPC turnkey contracts for five driverless metro lines, Lines 1, 2, 8, 10 and 14, totalling about 253.5 km. The programme targets GoA4 automation, CBTC, depots, and digital delivery tools, with completion planned for 2030.
Southeastern held its annual Remembrance Service in Dover on 4 November, with veterans, cadets and railway colleagues attending. The operator also reminded veterans, serving personnel and bereaved family members that they can travel to Remembrance services for free.
Great Northern will increase off-peak services between Moorgate and Hertford North to four trains per hour from 14 December, creating a 15-minute turn-up-and-go frequency at most stations on the route.
The Rail Accident Investigation Branch said a train not in service hit the buffers at London Liverpool Street on 15 October 2026 at about 7 mph, derailing the first three carriages and damaging the train and buffer stop. A safety digest will follow.
The Mutiara Line LRT link from Macallum to Penang Sentral, including a 5.5 km marine bridge across the Penang Strait, is expected to start construction in Q3 2027 after MRT Corp completes tender evaluation this month. Completion is targeted for December 2031.
Great Northern will double off-peak train frequency between Moorgate and Hertford North from 14 December. Services will run every 15 minutes on weekdays and Saturdays, with faster running into London and limited stops at Bayford and Crews Hill.
UK Railtours will run December trips in East Anglia, London and Kent using paired Class 37 locomotives. Swietelsky and Europhoenix will provide traction, RailAdventure will operate the locomotives, and Eastern Rail Services will provide Mark 2 coaches. Tickets are available through the UK Railtours website.
TfL and Time Out released London After Dark, a report on how the Night Tube has supported London’s night-time economy. The study found 88% of surveyed Londoners stayed out later because public transport was available, and London was ranked first among 26 European cities for nightlife and public transport.
BBG Infrastructure won a ₹137.93 crore DMRC contract to design and construct seven elevated metro stations and a foot overbridge for Delhi Metro Phase 4. The tender had two bidders, but only BBG qualified technically. The work period is 660 days.
GWR and Transport for Wales will run extra trains and reservation-only services to Cardiff Central for Wales’ Autumn Rugby Internationals on 7, 14 and 21 November, with queueing and revenue checks in place due to expected crowding.
Chiltern Railways said it will run over 90% of services on 12 November despite RMT industrial action, with some Birmingham, Stratford-upon-Avon and Leamington Spa services reduced or suspended. The operator also said all East West Rail services will have two staff on board.
Train services between Peterborough and London King’s Cross will be disrupted on 28–29 November due to digital signalling installation work on the East Coast Main Line. The work includes diagnostic system and software updates, track renewal, step-free access works, canopy work, and overhead line equipment upgrades.